USPatent applicationPatented

Component mounting apparatus and substrate conveyance method in component mounting apparatus

Granted 20 Aug 2013 · 2 office actions

Assignee: Panasonic

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Yoshiyuki Kitagawa, Takeyuki Kawase, Shuzo Yagi · Examiner: Livius R Cazan · AU 3729 · TC 3700

Life of the application

10 dated events
⤢ drag to zoom2012201420162018202020222024202620282030ProsecutionOwnershipTerm & fees
ProsecutionOwnershipTerm & feeshover for detail · click to open

Abstract

An object of the invention is to provide a component mounting apparatus which includes a plurality of substrate conveying lanes and which efficiently controls the order of carrying in of substrates, thereby capable of improving productivity, and also is to provide a substrate conveyance method in the component mounting apparatus. In a configuration which includes: component supplying units ( 20 A, 20 B) positioned lateral to conveyor lines including conveyors ( 10 A, 10 B, 10 C, 10 D) arranged in parallel; and a substrate distributing unit (M 3 B) configured to distribute substrates ( 13 ) delivered from an upstream apparatus, in the case where a substrate request signal (R) is output from conveyors ( 10 B, 10 C) which are farther from the component supplying units ( 20 A, 20 B), when the substrate request signal R is output for a conveyor ( 10 D) which is closer to the component supplying unit ( 20 b ) prior to start of a transferring work of the new substrate ( 13 ), the new substrate ( 13 ) is carried into the conveyor ( 10 D). Therefore, a substrate can be preferentially carried into conveyors which are more advantageous in component mounting efficiency.

Description

12 parts
›TECHNICAL FIELD

The present invention relates to a component mounting apparatus configured to mount a component to a substrate, and also to a substrate conveyance method in the component mounting apparatus.

›BACKGROUND ART

In a component mounting apparatus which mounts components to a substrate to produce a mounting substrate, a substrate conveying mechanism for conveying a substrate from the upstream side to the downstream side is disposed, and a component mounting work of moving and mounting a component picked up from a component supplying unit is performed on a substrate conveyed by the substrate conveying mechanism and positioned and held to a substrate holding unit. For the purpose of improving the efficiency of the component mounting work, a component mounting apparatus including a substrate conveying mechanism including a plurality of substrate conveying lanes is known (for example, see Patent Document 1). The Patent Document example shows an example in which two lines of conveying apparatuses (substrate conveying lanes) having a configuration including a pair of conveyor belts arranged in parallel are provided. When this configuration is employed, a substrate conveying operation in one of the substrate conveying lanes and a component mounting operation in the other substrate conveying lane can be performed in parallel. According to the configuration, there is an advantage that interruption of the component mounting work does not occur even when a substrate is conveyed, and the productivity can be improved.

›RELATED ART DOCUMENTS

Patent Documents

Patent Document 1: JP-A-2004-31613

›SUMMARY OF THE INVENTION

Problem to be Solved by the Invention

In a component mounting apparatus which is provided with a plurality of substrate conveying lanes as described above, it is necessary to perform a substrate distributing control that dynamically controls a selection of one of substrate conveying lanes into which a substrate delivered from an upstream apparatus is carried in. In a conventional component mounting apparatus, it is usual to employ a method which carries in substrates into the substrate conveying lanes in the order in which a substrate request signal output for each of substrate conveying lanes, i.e., a signal indicating that a reception of a new substrate into the substrate conveying lane is enabled is output. In the above-described conventional method, however, the following disadvantages inevitably occur.

In a component mounting apparatus including a plurality of substrate conveying lanes, the distances in which a mounting head reciprocates between a component supplying unit and respective substrate holding units disposed in the substrate conveying lanes are different from one another depending on positional relationships between the substrate conveying lanes and the component supplying unit. Therefore, a remarkable difference is caused in the efficiency of the work of mounting components between the case where the mounting work is performed on a substrate located in the substrate conveying lane close to the component supplying unit, and that where the mounting work is performed on a substrate located in the substrate conveying lane far from the component supplying unit. Therefore, as the substrate conveying lane is closer to the component supplying unit, a higher efficiency of the component mounting work is realized.

However, in the conventional method, the substrate conveying lane into which a substrate is carried is determined simply based on the order of the substrate request signals. Even in the case where the substrate conveying lane closer to the component supplying unit enters the state where a reception of a new substrate is enabled, when the substrate request signal for the substrate conveying lane farther from the component supplying unit has been already output, a substrate is carried into the substrate conveying lane farther from the component supplying unit. Namely, the order of carrying in of substrates which is preferable from the viewpoint of the efficiency of the component mounting work is not always realized. This constitutes a cause for impeding improvement of the productivity.

Therefore, an object of the invention is to provide a component mounting apparatus which includes a plurality of substrate conveying lanes, and which can efficiently control the order of carrying in of substrates, thereby capable of improving productivity, and also is to provide a substrate conveyance method in the component mounting apparatus.

Means for Solving the Problem

The present invention provides a component mounting apparatus including: a conveyor line including a plurality of substrate conveying conveyors which are arranged in parallel and each of which is configured to convey a substrate and includes a substrate holding unit configured to position and hold the substrate; a component supplying unit positioned lateral to the conveyor line, and configured to supply a component to be mounted to the substrate; a substrate distributing unit configured to distribute substrates delivered from an upstream apparatus to the plurality of substrate conveying conveyors; a substrate conveyance controlling unit configured to control the substrate distributing unit and the substrate conveying conveyors, thereby performing a substrate conveying operation of carrying in the delivered substrate into the substrate holding unit of any one of the substrate conveying conveyors; a component mounting mechanism configured to pick up a component from the component supplying unit by a mounting head, and configured to mount the component to the substrate positioned and held by the substrate holding unit; and a signal outputting unit configured to determine, based on a result of a detection of existence or non-existence of a substrate in the substrate conveying conveyor, whether the substrate conveying conveyor is in a state where the substrate conveying conveyor can receive a new substrate or not, and configured to output, based on a result of the determination, a substrate request signal for requesting carrying in of the new substrate into the substrate conveying conveyor, wherein in a case where the substrate request signal is output for one of the plurality of substrate conveying conveyors which is farther from the component supplying unit, when the substrate request signal is output for one of the plurality of substrate conveying conveyors which is closer to the component supplying unit prior to start of a transferring operation of carrying the new substrate from the substrate distributing unit into the substrate conveying conveyor which is farther from the component supplying unit, the substrate conveyance controlling unit causes the new substrate to be carried into the substrate conveying conveyor which is closer to the component supplying unit.

The present invention also provides a substrate conveyance method in a component mounting apparatus, the component mounting apparatus including: a conveyor line including a plurality of substrate conveying conveyors which are arranged in parallel and each of which is configured to convey a substrate and includes a substrate holding unit configured to position and hold the substrate; a component supplying unit positioned lateral to the conveyor line, and configured to supply a component to be mounted to the substrate; a substrate distributing unit configured to distribute substrates delivered from an upstream apparatus to the plurality of substrate conveying conveyors; a substrate conveyance controlling unit configured to control the substrate distributing unit and the substrate conveying conveyors, thereby performing a substrate conveying operation of carrying in the delivered substrate into the substrate holding unit of any one of the substrate conveying conveyors; a component mounting mechanism configured to pick up a component from the component supplying unit by a mounting head, and configured to mount the component to the substrate positioned and held by the substrate holding unit; and a signal outputting unit configured to determine, based on a result of a detection of existence or non-existence of a substrate in the substrate conveying conveyor, whether the substrate conveying conveyor is in a state where the substrate conveying conveyor can receive a new substrate or not, and configured to output, based on a result of the determination, a substrate request signal for requesting carrying in of the new substrate into the substrate conveying conveyor, the method for carrying in the substrate into the substrate holding unit, including: carrying in the new substrate into one of the plurality of substrate conveying conveyor which is closer to the component supplying unit, in a case where the substrate request signal is output for one of the plurality of substrate conveying conveyors which is farther from the component supplying unit, and when the substrate request signal is output for the conveying conveyor which is closer to the component supplying unit prior to start of a transferring operation of carrying the new substrate from the substrate distributing unit into the substrate conveying conveyor which is farther from the component supplying unit.

›Advantages of the Invention

According to the invention, in the configuration including: the conveyor line including the plurality of substrate conveying conveyors arranged in parallel; the component supplying unit positioned lateral to the conveyor line and configured to supply a component to be mounted to a substrate; and the substrate distributing unit configured to distribute substrates delivered from an upstream apparatus to the plurality of substrate conveying conveyors, in the case where the substrate request signal is output for one of the plurality of substrate conveying conveyors which is farther from the component supplying unit, when the substrate request signal is output for one of the plurality of substrate conveying conveyors which is closer to the component supplying unit prior to start of a transferring operation of carrying the new substrate from the substrate distributing unit into the substrate conveying conveyor which is farther from the component supplying unit, the new substrate is carried into the substrate conveying conveyor which is closer to the component supplying unit. With this configuration, the substrate can be preferentially carried into the substrate conveying conveyor which is more advantageous in component mounting efficiency. Therefore, the order of carrying in of substrates is efficiently controlled to enable the productivity to be improved.

›BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a block diagram showing the configuration of a component mounting system of an embodiment of the invention.

FIG. 2 is a plan view of a component mounting apparatus of the embodiment of the invention.

FIG. 3 is a block diagram showing the configuration of a control system of the component mounting apparatus of the embodiment of the invention.

FIG. 4 is a time chart showing the order of carrying in of substrates in the component mounting apparatus of the embodiment of the invention.

FIG. 5 is a time chart showing the order of carrying in of substrates in the component mounting apparatus of the embodiment of the invention.

FIGS. 6( a ) and 6 ( b ) are operation diagrams of a substrate conveying operation in the component mounting apparatus of the embodiment of the invention.

FIGS. 7( a ) and 7 ( b ) are operation diagrams of the substrate conveying operation in the component mounting apparatus of the embodiment of the invention.

›MODE FOR CARRYING OUT THE INVENTION · 1 of 4

Next, an embodiment of the invention will be described with reference to the drawings. First, the configuration of a component mounting system 1 will be described with reference to FIG. 1 . The component mounting system 1 is configured by coupling in series a plurality of apparatuses for mounting components, i.e., a substrate supplying apparatus M 1 , a screen printing apparatus M 2 , a component mounting apparatus M 3 , a visual inspecting apparatus M 4 , a reflow apparatus M 5 , and a substrate collecting apparatus M 6 , in the direction X (substrate conveying direction). Here, the component mounting apparatus M 3 has a form where, on the upstream side of a component mounting mechanism unit M 3 A having a plurality of substrate conveying conveyors, the apparatus is accompanied by a substrate distributing unit M 3 B having a function of distributing substrates sent from the screen printing apparatus M 2 to the substrate conveying conveyors. The apparatuses are connected to one another through a LAN 2 , and working operations of the apparatuses are generally controlled by a host computer 3 which is connected to the LAN 2 .

The functions of the apparatuses will be described. The substrate supplying apparatus M 1 takes out a substrate to which components are to be mounted, and which is housed in a container such as a magazine, and supplies the substrate to the screen printing apparatus M 2 . The screen printing apparatus M 2 prints a paste such as a cream solder which is a bonding material, to electrodes which are formed on the substrate, and which are to be used for component connection. The substrate in which the printing of the paste by the screen printing apparatus M 2 has been ended is distributed by means of the substrate distributing unit M 3 B, and then carried into a specific one of the plurality of substrate conveying conveyors of the component mounting mechanism unit M 3 A. In the conveyor, a component mounting work of mounting an electronic component picked up from a component supplying unit to a predetermined position is performed on the carried in substrate.

The visual inspecting apparatus M 4 takes an image of the substrate which has undergone the component mounting work, by a camera, to perform inspection for the purpose of determining pass/fail of the mounting state such as the existence or non-existence and positional displacement of the mounted electronic component. A substrate which is determined as a result of the inspection to pass is carried into the reflow apparatus M 5 . In the apparatus, the substrate is heated to fuse and solidify the cream solder, thereby solder bonding the electronic component to the electrodes of the substrate. The substrate in which the solder bonding is ended and the component mounting work is completed is collected by the substrate collecting apparatus M 6 .

Next, the configuration and function of the component mounting apparatus M 3 will be described with reference to FIG. 2 . As described above, the component mounting apparatus M 3 is configured by combining the substrate distributing unit M 3 B having the function of distributing substrates with the upstream side of the component mounting mechanism unit M 3 A which functions as a main body unit. First, the configuration of the component mounting mechanism unit M 3 A will be described. Referring to FIG. 2 , on the upper surface of a platform 9 , a front conveyor line 11 A configured by a first substrate conveying conveyor 10 A and a second substrate conveying conveyor 10 B (hereinafter, abbreviated as “first conveyor 10 A” and “second conveyor 10 B”), and a rear conveyor line 11 B configured by a third substrate conveying conveyor 10 C and a fourth substrate conveying conveyor 10 D (hereinafter, abbreviated as “third conveyor 10 C” and “fourth conveyor 10 D”) are arranged in the direction X across the apparatus center line CL. Namely, the component mounting apparatus M 3 includes the front conveyor line 11 A and the rear conveyor line 11 B each configured by arranging in parallel the plurality of substrate conveying conveyors which convey substrates 13 .

Each of the first conveyor 10 A, the second conveyor 10 B, the third conveyor 10 C, and the fourth conveyor 10 D is configured by combining a stationary rail 10 a and a movable rail 10 b , and conveyor belts which are provided in the respective stationary rail 10 a and movable rail 10 b are driven by belt driving mechanisms 18 A, 18 B, whereby the substrates 13 supplied from the substrate distributing unit M 3 B are conveyed in the direction X.

The first conveyor 10 A, the second conveyor 10 B, the third conveyor 10 C, and the fourth conveyor 10 D constitute a first conveying lane L 1 , a second conveying lane L 2 , a third conveying lane L 3 , and a fourth conveying lane L 4 which convey the substrates 13 that are to be mounted in the component mounting mechanism unit M 3 A, respectively. Substrate holding units 12 are disposed in substantially intermediate positions in the direction X of the first conveying lane L 1 , the second conveying lane L 2 , the third conveying lane L 3 , and the fourth conveying lane L 4 , respectively. The substrate holding units 12 position and hold the substrates 13 which are conveyed by the substrate conveying conveyors, respectively.

Substrate detection sensors S 1 , S 2 , S 3 , S 4 are disposed in the respective substrate holding units 12 . The substrate detection sensors detect the existence or non-existence of the substrates 13 in the corresponding substrate holding units 12 in the first conveyor 10 A to the fourth conveyor 10 D. Based on a result of the substrate detection, as described later, it is determined whether the substrate conveying conveyor is in a state where it can newly receive the substrate 13 or not.

In each of the first conveyor 10 A, the second conveyor 10 B, the third conveyor 10 C, and the fourth conveyor 10 D, the movable rail 10 b which is located in the inner side is movable in the direction Y, and moved in the direction Y by driving inter-rail distance adjusting mechanisms 17 A, 17 B, whereby the conveyance width W defined by the interval between the stationary rail 10 a and the movable rail 10 b can be adjusted in accordance with the objective substrate 13 .

›MODE FOR CARRYING OUT THE INVENTION · 2 of 4

A front component supplying unit 20 A and a rear component supplying unit 20 B are placed on the sides of the front conveyor line 11 A and the rear conveyor line 11 B, respectively. A plurality of parts feeders 21 which house components to be mounted to the substrates 13 are arranged in parallel with each of the front component supplying unit 20 A and the rear component supplying unit 20 B. In FIG. 2 , the lower side of the sheet corresponds to the front side of the mounting apparatus, and the upper side corresponds to the rear side. A front mounting head 23 A and rear mounting head 23 B which are driven by a front head moving mechanism 22 A and a rear head moving mechanism 22 B, respectively are placed in the upper surface side of the platform 9 .

The front mounting head 23 A picks up a component from the front component supplying unit 20 A, and mounts the component to the substrate 13 which is held by the substrate holding unit 12 of the first conveyor 10 A or the second conveyor 10 B (the arrows c, d). Similarly, the rear mounting head 23 B picks up a component from the rear component supplying unit 20 B, and mounts the component to the substrate 13 which is held by the substrate holding unit 12 of the fourth conveyor 10 D or the third conveyor 10 C (the arrows e, f). Namely, the front head moving mechanism 22 A and the front mounting head 23 A, and the rear head moving mechanism 22 B and the rear mounting head 23 B constitute component mounting mechanisms which pick up a component from the front component supplying unit 20 A or the rear component supplying unit 20 B by means of the mounting head, and which mount the component to the substrate 13 positioned and held by the substrate holding unit 12 , respectively.

In the component mounting works of the component mounting mechanisms, since the first conveyor 10 A is closer to the front component supplying unit 20 A than the second conveyor 10 B, and the fourth conveyor 10 D is closer to the rear component supplying unit 20 B than the third conveyor 10 C, the head moving paths indicated by the arrows c, e are shorter than those indicated by the arrows d, f. In the component mounting work which is performed in the front conveyor line 11 A, therefore, the component mounting work which is performed on the substrate 13 located in the first conveyor 10 A can realize a higher efficiency of the component mounting work as compared with that which is performed on the substrate 13 located in the second conveyor 10 B. In the component mounting work which is performed in the rear conveyor line 11 B, similarly, the component mounting work which is performed on the substrate 13 located in the fourth conveyor 10 D can realize a higher efficiency of the component mounting work as compared with that which is performed on the substrate 13 located in the third conveyor 10 C. In the embodiment, as described later, therefore, the first conveyor 10 A is set as a priority lane of the substrate conveyance in the front conveyor line 11 A, and the fourth conveyor 10 D is set as a priority lane of the substrate conveyance in the rear conveyor line 11 B.

Next, the configuration of the component mounting mechanism unit M 3 B will be described. On a platform 5 , a pair of first substrate distributing conveyor 6 A and second substrate distributing conveyor 6 B arranged in parallel is provided such that the conveying direction extends in the direction X. Each of the first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B is configured by combining a stationary rail 6 a and a movable rail 6 b , and conveyor belts which are provided in the respective stationary rail 6 a and movable rail 6 b are driven by belt driving mechanisms 8 A, 8 B, whereby the substrates supplied from the upstream side (the left side in the figure) are conveyed in the direction X (the arrow a).

In each of the first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B, the movable rail 6 b which is located in the inner side is movable in the direction Y, and moved by driving an inter-rail distance adjusting mechanism 7 in the direction Y, whereby the conveyance width W defined by the interval between the stationary rail 6 a and the movable rail 6 b can be adjusted in accordance with the objective substrate 13 . The first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B can be integrally movable on the platform 5 in the direction Y (the arrow b) by a driving mechanism (not shown), thereby enabling the first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B to be coupled with either of the two conveyor lines 11 A, 11 B which are disposed in the component mounting mechanism unit M 3 A. Namely, the substrate distributing unit M 3 B is a substrate distributing unit in which the substrates 13 delivered from the screen printing apparatus M 2 that is an upstream apparatus are distributed to the plurality of substrate conveying conveyors of the component mounting mechanism unit M 3 A by combining the movements in the direction Y of the first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B with the substrate conveying operations by the first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B.

Next, the configuration of a control system will be described with reference to FIG. 3 . Referring to FIG. 3 , a controlling apparatus 30 controls the units of the component mounting apparatus M 3 described below. The controlling apparatus 30 includes a signal outputting unit 31 and a substrate conveyance controlling unit 32 as internal controlling functions. By the functions, the substrate conveying operation of the component mounting apparatus M 3 during the operation of the component mounting system 1 is controlled. The substrate conveyance controlling unit 32 controls the substrate distributing unit M 3 B, the first conveyor 10 A, the second conveyor 10 B, the third conveyor 10 C, and the fourth conveyor 10 D, thereby executing the substrate conveying operation of carrying the substrate 13 delivered from the screen printing apparatus M 2 on the upstream side into the substrate holding unit 12 of either of the substrate conveying conveyors.

›MODE FOR CARRYING OUT THE INVENTION · 3 of 4

In the substrate conveying operation, based on the results of the detections of the existence or non-existence of the substrate 13 by the substrate detection sensors S 1 , S 2 , S 3 , S 4 which are disposed in the first conveyor 10 A, the second conveyor 10 B, the third conveyor 10 C, and the fourth conveyor 10 D, respectively, the signal outputting unit 31 determines whether the corresponding substrate conveying conveyor is in the state where it can newly receive the substrate 13 or not, and, based on the result of the determination, outputs the substrate request signal requesting the carrying in of the new substrate 13 into the substrate conveying conveyor. Here, the substrate detection sensors S 1 , S 2 , S 3 , S 4 are disposed in the substrate holding units 12 to detect the existence or non-existence of the substrate 13 in the respective substrate holding units 12 . Alternatively, similar substrate detection sensors may be disposed in downstream end portions of the first conveyor 10 A to the fourth conveyor 10 D, and it may be detected that the substrate 13 is completely discharged from the substrate conveying conveyor to the downstream side.

The controlling apparatus 30 controls the front head moving mechanism 22 A, the front mounting head 23 A, the front component supplying unit 20 A, the rear head moving mechanism 22 B, the rear mounting head 23 B, and the rear component supplying unit 20 B, thereby executing the component mounting operation on the substrates 13 carried into the first conveyor 10 A, the second conveyor 10 B, the third conveyor 10 C, and the fourth conveyor 10 D. A recognition apparatus 33 performs a recognition process on images of the substrate 13 carried into the substrate holding unit 12 , and components picked up by the front mounting head 23 A and the rear mounting head 23 B. A displaying unit 34 is a displaying apparatus such as a liquid crystal panel, and displays an image related to predetermined items of the operation status of the host computer 3 . A storage unit 35 stores data which are required for executing the substrate conveying and component mounting operations of the host computer 3 . A communicating unit 36 receives and sends signals between the other apparatuses and the host computer 3 through the LAN 2 .

Next, the substrate conveying and substrate distributing operations of the component mounting apparatus M 3 will be described with reference to FIGS. 4 to 7( b ). FIGS. 4 and 5 show time series relationships of the ON/OFF states of the substrate request signals R in the first conveying lane L 1 to the fourth conveying lane L 4 , the substrate conveying operations (indicated by the double-line arrows), and the components mounting works (indicated by the hatched rectangular frames). FIGS. 6( a ), ( b ) and FIGS. 7( a ), ( b ) show the conveyance states of the substrates 13 in the conveying lanes at specific timings shown in FIGS. 4 and 5 .

First, FIGS. 4 , and 6 ( a ), ( b ) show the case where the substrate conveying operation is newly started in the state where no substrate 13 is carried into the component mounting mechanism unit M 3 A, such as the case where the component mounting system 1 is started to operate. In this case, at timing to shown in FIG. 4 , all of the substrate detection sensors S 1 , S 2 , S 3 , S 4 do not detect the substrate 13 as shown in FIG. 6( a ), and hence the substrate request signals R for all of the first conveying lane L 1 to the fourth conveying lane L 4 are in the ON state.

At this time, in the substrate distributing unit M 3 B, the substrates 13 are delivered from the upstream side to the first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B, respectively, and the substrates 13 are carried into the component mounting mechanism unit M 3 A in accordance with the preset carry priority order. As shown in FIG. 6( b ), namely, the substrate 13 held by the substrate distributing unit M 3 B is carried from the second substrate distributing conveyor 6 B into the fourth conveying lane L 4 (the arrow g), and then next substrate is carried from the first substrate distributing conveyor 6 A into the first conveying lane L 1 (the arrow h). FIG. 6( b ) shows the state at timing tb shown in FIG. 4 . In this state, as a result of the carrying in of the substrates 13 , for the fourth conveying lane L 4 and the first conveying lane L 1 , the substrate request signals R are turned OFF at respective timings t 1 , t 2 . In the third conveying lane L 3 and second conveying lane L 2 into which the substrate 13 has not yet been carried, the substrate request signals R remain to be in the ON state. Therefore, the new substrates 13 which are next delivered from the upstream side to the substrate distributing unit M 3 B are carried into the third conveying lane L 3 and the second conveying lane L 2 .

In the example shown in FIGS. 4 and 6( a ), ( b ), in the case where the substrate request signal R is output for a plurality of substrate conveying conveyors (the first conveyor 10 A to the fourth conveyor 10 D), namely, the substrate conveyance controlling unit 32 controls the substrate distributing unit M 3 B and the substrate conveying conveyors so that the new substrates 13 are first carried from the substrate distributing unit M 3 B into substrate conveying conveyors (in this example, the first conveyor 10 A and the fourth conveyor 10 D) which, among the substrate conveying conveyors are closest to the front component supplying unit 20 A and the rear component supplying unit 20 B. Therefore, the substrates 13 can be preferentially carried into substrate conveying conveyors which are close to the component supplying units, and which are more advantageous in efficiency of the component mounting work, and the order of carrying in of substrates can be efficiently controlled, so that the productivity can be improved.

Next, the substrate conveying operation in the case where the operation of the component mounting apparatus M 3 in the component mounting system 1 has been already started will be described with reference to FIGS. 5 and 7( a ), ( b ). Here, a case is shown where the substrate conveying operation is newly started in the state where the mounting works (the arrows i, j) by the rear mounting head 23 B and the front mounting head 23 A are performed on the substrates 13 which are carried into the fourth conveying lane L 4 and the first conveying lane L 1 in the component mounting mechanism unit M 3 A, and which are held by the substrate holding units 12 . In this case, at timing tc shown in FIG. 5 , as shown in FIG. 7( a ), the substrate detection sensors S 1 , S 4 detect the substrates 13 , and the substrate detection sensors S 3 , S 2 do not detect the substrates 13 . For the first conveying lane L 1 and the fourth conveying lane L 4 , therefore, the substrate request signals R are in the OFF state, and, for the second conveying lane L 2 and the third conveying lane L 3 , are in the ON state.

›MODE FOR CARRYING OUT THE INVENTION · 4 of 4

At this time, in the substrate distributing unit M 3 B, the substrates 13 are delivered from the upstream side to the first substrate distributing conveyor 6 A and the second substrate distributing conveyor 6 B, respectively, and the carry destinations of the substrates 13 in delivering to the component mounting mechanism unit M 3 A are selected in accordance with the process degrees of the mounting works in the first conveying lane L 1 and the fourth conveying lane L 4 . Also in the selection of the carry destinations, substrate conveying conveyors which are closer to the component supplying units, and which are more advantageous in efficiency of the component mounting work are preferentially selected.

Here, an example is shown where the substrate request signal R is set to the ON state at timing t 3 when the component mounting work which is performed on the substrate 13 that has been carried has been completed in the fourth conveying lane L 4 and a work of transferring the substrate 13 from the second substrate distributing conveyor 6 B to the component mounting mechanism unit M 3 A has not yet been started. In this case, although the substrate request signal R for the third conveying lane L 3 is already output, the new substrate 13 is carried from the second substrate distributing conveyor 6 B into the fourth conveying lane L 4 as shown in FIG. 7( b ) (corresponding to timing tb shown in FIG. 5) (the arrow k), and the component mounting work (the arrow m) by the rear mounting head 23 B is performed on the substrate 13 .

By contrast, the mounting work which is performed on the substrate 13 that has been already carried in is successively continued in the first conveying lane L 1 , and hence the new substrate 13 cannot be preferentially carried into the first conveying lane L 1 . In this case, as shown in FIG. 7( b ), the new substrate 13 is carried from the first substrate distributing conveyor 6 A into the second conveying lane L 2 to which the substrate request signals R has been already output (the arrow i), and the component mounting work (the arrow n) by the front mounting head 23 A is performed on the substrate 13 .

In the example shown in FIGS. 5 and 7( a ), ( b ), in the case where the substrate request signal R is output for a substrate conveying conveyor (in this example, the third conveyor 10 C) which is farther from the rear component supplying unit 20 B among the plurality of substrate conveying conveyors (the first conveyor 10 A to the fourth conveyor 10 D), when the substrate request signal R is output for a substrate conveying conveyor (in this example, the fourth conveyor 10 D) which is closer to the rear component supplying unit 20 B, before the transferring operation of carrying the new substrate 13 from the substrate distributing unit M 3 B into the third conveyor 10 C is started, namely, the substrate conveyance controlling unit 32 controls the substrate distributing unit M 3 B and the substrate conveying conveyors so that the new substrate 13 is carried into the fourth conveyor 10 D. Also in this case, the substrates 13 can be preferentially carried into substrate conveying conveyors which are closer to the component supplying units, and which are advantageous in component mounting efficiency, and the order of carrying in of substrates can be efficiently controlled, so that the productivity can be improved.

Although the invention has been described in detail and with reference to the specific embodiment, it is obvious to those skilled in the art that various changes and modifications can be made without departing from the spirit and scope of the invention.

The application is based on Japanese Patent Application (No. 2009-273068) filed Dec. 1, 2009, and disclosure of which is incorporated herein by reference.

›INDUSTRIAL APPLICABILITY

The component mounting apparatus of the invention and the substrate conveyance method in the component mounting apparatus have an effect that substrates can be preferentially carried into a substrate conveying conveyor which is more advantageous in component mounting efficiency, and the order of carrying in of substrates can be efficiently controlled, so that the productivity can be improved, and are useful in the field of mounting electronic components to a wiring substrate to produce a mounting substrate.

›DESCRIPTION OF REFERENCE SIGNS

1 Component Mounting System

10 A First Conveyor

10 B Second Conveyor

10 C Third Conveyor

10 D Fourth Conveyor

11 A Front Conveyor Line

11 B Rear Conveyor Line

12 Substrate Holding Unit

13 Substrate

20 A Front Component Supplying Unit

20 B Rear Component Supplying Unit

21 Parts Feeder

22 A Front Head Moving Mechanism

22 B Rear Head Moving Mechanism

23 A Front Mounting Head

23 B Rear Mounting Head

M 3 A Component Mounting Mechanism Unit

M 3 B Substrate Distributing Unit

L 1 First Conveying Lane

L 2 Second Conveying Lane

L 3 Third Conveying Lane

L 4 Fourth Conveying Lane

S 1 , S 2 , S 3 , S 4 Substrate Detection Sensor

Claims as granted

2 claims

Log in to read the claims of this application.

Log in to unlock

Classifications

3 codes
IPC · International Patent Classification
Section H — Electricity
  • H05K13/04
USPC · US Patent Classification
29/83229/739

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this application are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJan 2011Jul 2011Jan 2012Jul 2012Jan 2013Jul 2013USPTOApplicantNon-final rejectionResponse after non-finalNotice of allowance
USPTOApplicanthover for detail · click to open
Pendency
2.7 y
995 days filing → grant
Office actions
2
non-final + final
Responses
2
no RCE
Examiner
Livius R Cazan
art unit 3729 · TC 3700
Citations: 10 back · 1 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Documents

Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.

Log in to unlock

Chain of title

⤢ drag to zoom2012201420162018202020222024202620282030Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock