Program re-writing apparatus
Granted 9 Oct 2012 · 1 office action
Current assignee: Socionext Inc. · originally Panasonic
Law firm: Law firm · Log in to unlock
Attorney: Attorney · Log in to unlock
Inventors: Teruo Kawabata, Taketo Heishi, Masatsugu Daimon, Hajime Ogawa · Examiner: Wei Zhen · AU 2191 · TC 2100
Life of the application
10 dated eventsAbstract
A program re-writing method which re-writes an inputted program into a program for a processor for controlling whether or not a process is executed based on a yes or no execution flag, said program re-writing method including: inserting a comparison process into the inputted program, the comparison process comparing first address information, which is memory address information accessed by a first memory access process included in the inputted program, and second address information, which is address information of a memory accessed by a second memory access process included in the inputted program, and writing a comparison result into the yes or no execution flag; and inserting a yes or no execution flag-attached logic preservation process into the inputted program, the yes or no execution flag-attached logic preservation process being a process executed based on a value of the yes or no execution flag and preserving the same result as a result of the inputted program when executed.
Description
20 parts›BACKGROUND OF THE INVENTION
(1) Field of the Invention
The present invention relates to a program re-writing apparatus which performs dependence relaxation for a command series including a memory access command in particular.
(2) Description of the Related Art
In recent years the processing speed of processors has substantially increased, however in comparison improvements in access speed for the main memory of a computer have been meager, and the speed difference between processors and the main memory continues to increase. Thus, it has been pointed out that conventionally, when high-speed information processing is performed by an information processing apparatus with a processor, memory access can become bottlenecked.
In order to solve this problem, one well-known method executes a load command necessary for a penalty cycle used for acquiring data stored in the memory region of the main memory, with as much priority over other commands as possible, and schedules commands such that other commands are executed during the penalty cycle. Thus, the effect of the penalty can be hidden in the execution cycle of other commands due to the memory access, and drops in performance can be prevented.
However in most cases, the memory access address value of a memory access command changes dynamically in static command scheduling. Thus memory dependence occurring during the memory access command period must be anticipated. This is known as ambiguous memory dependence. As a result, it is not possible to prioritize a load command over other memory access commands in static command scheduling, it becomes difficult to hide the penalty cycle due to the memory access command and the power of the processor cannot be taken advantage of.
Therefore, conventionally, when the processor does not have hardware which executes a special command, a load command cannot be shifted in front of the Store command for the memory region to perform command scheduling for the memory access command with an ambiguous memory dependence.
Speculative load commands are an example of a special command for addressing ambiguous memory dependence (see for example, Patent Document: U.S. Pat. No. 3,762,597 Publication (FIG. 6). A speculative load command is a command which executes the processes such as those below. In other words, the address of a memory region to be accessed by the load command is stored in a storage apparatus with special hardware and the memory data stored in the address is set in the register. Subsequently, when a store command is executed, the data stored in the register is set in the memory region. Further, when interference occurs between the address of the memory region accessed by the store command and the address of the speculative load command stored in the special storage apparatus above, data stored in the register by the store command is overwritten in the register which is set by the speculative load command. Thus, logical equivalency is maintained.
A speculative load command is explained in detail using FIG. 1 , FIG. 2A and FIG. 2B .
For example, consider a processor which executes only a normal memory access command. FIG. 1 is a diagram which shows an example of a source program. FIG. 2A is a diagram which shows an example of an assembler file which is equivalent to the source program shown in FIG. 1 and does not include a speculative load command. In order to execute the memory access process shown in FIG. 1 with this kind of processor, an assembler file must be created which faithfully follows the memory access order shown in FIG. 2A .
On the other hand, FIG. 2B is a diagram which shows an example of an assembler file which is equivalent to the source program shown in FIG. 1 and includes a speculative load command. In this way, by utilizing the speculative load command, there is no longer a need to follow the memory access order shown in FIG. 1 . In other words, the load command can be executed with priority over the store command. Thus the penalty cycle caused by memory referencing can be hidden in other commands and as a result the functionality of the program re-writing apparatus improves.
However, in order to execute this kind of speculative execution command, special hardware must be installed in the processor.
›SUMMARY OF THE INVENTION · 1 of 2
The present invention is realized in order to solve the problem above and has as an object providing a program re-writing apparatus which can relax ambiguous memory dependence without installing special hardware.
In order to achieve the objective above, the program re-writing apparatus according to the present invention is a program re-writing apparatus which re-writes an inputted program into a program for a processor for controlling whether or not a process is executed based on a yes or no execution flag, including: a comparison process insertion unit which inserts a comparison process into the inputted program, the comparison process comparing first address information, which is memory address information accessed by a first memory access process included in the inputted program, and second address information, which is address information of a memory accessed by a second memory access process included in the inputted program, and writing a comparison result into the yes or no execution flag; and a logic preservation process insertion unit which inserts a yes or no execution flag-attached logic preservation process into the inputted program, the yes or no execution flag-attached logic preservation process being a process executed based on a value of the yes or no execution flag and preserving the same result as a result of the inputted program when executed.
A logic preservation process is performed selectively based on the yes/no executable flag for preserving the logic of the memory access process. Thus, ambiguous memory dependence can be relaxed without installing special hardware. Thus, the memory access commands included in the processor can be scheduled efficiently and the processing speed of the program when the program is executed can be improved. Further, the efficiency of hardware use is improved.
Ideally, the first memory access process is a store process for writing data into the memory, and the second memory access process is a load process for reading data out of the memory.
Thus, load commands and store commands for the cache memory and external memory included in the processor can be scheduled statically and efficiently, and the processing speed of the program when the program is executed can be improved. Further, the efficiency of hardware use is improved.
Ideally, the program re-writing apparatus above further includes a critical path detection unit which detects a process which is a critical path from the inputted program; and an ambiguous memory dependence analysis unit which judges whether or not the first memory access process and the second memory access process are included in the critical path detected by the critical path detection unit, and when the first memory access process and the second memory access processes are included in the critical path, to analyze whether or not there is an ambiguous true memory dependence relationship between the first memory access process and the second memory access process, and the comparison process insertion unit inserts the comparison process into the first memory access process and the second memory access process which have been judged to be in an ambiguous true memory dependence relationship by the ambiguous memory dependence analysis unit.
Additionally, an ambiguous memory dependence relationship between commands in the critical pass can be automatically relaxed, the critical pass shortened efficiently, the commands scheduled and the processing speed when a program is executed can be improved. Further, the efficiency of hardware use is improved.
Ideally, the program re-writing apparatus further includes an execution sequence modification unit which modifies an execution sequence of the first memory access process and the second memory access process which have been judged to be in an ambiguous true memory dependence relationship by the ambiguous memory dependence analysis unit.
Thus the latency of a long command can be placed in priority and thus processing speed can be improved when the program is executed. Additionally, the efficiency of hardware use is improved.
Further, the program re-writing apparatus above further includes a data size comparison unit which judges whether or not a condition is satisfied, the condition being that the size of the data accessed once by the first memory access process and the size of the data accessed once by the second memory access process are equal, and the logic preservation process insertion unit, when it is judged by the data size comparison unit that the condition in the data size comparison unit is satisfied, inserts a process into the inputted program, the process in which the first memory access process overwrites a value read out of the memory by the second memory access process with a value written into the memory, as the logic preservation process.
Ideally, the comparison processing insertion unit inserts the comparison process one place before the logic preservation process as an execution sequence.
Thus, a match assessment can be realized once immediately prior to the memory comparison process performing before the memory access process and the processing speed of the program when executed can be improved.
Ideally, the program re-writing apparatus above further includes a regularity judgment unit which judges whether or not a condition is satisfied, the condition being that the first and the second memory access processes are consecutive, and that a memory address accessed in each memory access process is regularly renewed, and the comparison process insertion unit, when it is judged by the regularity judgment unit that the condition is satisfied, inserts the comparison process in a position before the logic preservation process, which is at the top of the sequence for the first and second memory access processes, as an execution sequence.
Alternatively, the program re-writing apparatus above further includes a data size comparison unit which judges whether or not a condition is satisfied, the condition being that a data size accessed once by the second memory access process is smaller than a data size accessed once by the first memory access process, and the logic preservation process insertion unit, when it is judged by the data size comparison unit that the condition is fulfilled, inserts a process into the inputted program as a logic preservation process, the process writing over a value read out of the memory by the second memory access process with a partial value written into the memory by the first memory access process.
›SUMMARY OF THE INVENTION · 2 of 2
Thus even an ambiguous memory dependence in memory access processes with varying object sizes, the memory dependence can be relaxed and the processing speed can be improved when the program is executed.
Ideally, the program re-writing apparatus above further includes an optimizing designation information addition unit which receives optimizing instruction information related to optimization, and the comparison process insertion unit and the logic preservation process insertion unit operate selectively based on the optimizing instruction information received by the optimizing designation information addition unit.
Thus the programmer can program keeping in mind a trade-off between code size for the scheduling for the memory access commands and execution performance.
Note that the present invention can not only be realized as a program re-writing apparatus which includes the characteristic units described above, but may be realized as a re-writing method which uses the characteristic units included in the program re-writing apparatus as characteristic steps, and as a program which executes the characteristic steps included in the program re-writing method in a computer. Additionally, it goes without saying that this kind of program can be distributed through recording media such as a CD-ROM and a network such as the Internet.
According to the present invention, ambiguous memory dependence can be relaxed without installing special hardware. Additionally, static and efficient scheduling for commands with ambiguous memory dependence can be achieved, and the processing speed when a program is executed can be improved. Further, the efficiency of hardware use is improved.
›FURTHER INFORMATION ABOUT TECHNICAL BACKGROUND TO THIS APPLICATION
The disclosure of Japanese Patent Application No. 2007-139671 filed on May 25, 2007 including specification, drawings and claims is incorporated herein by reference in its entirety.
›BRIEF DESCRIPTION OF THE DRAWINGS
These and other objects, advantages and features of the invention will become apparent from the following description thereof taken in conjunction with the accompanying drawings that illustrate a specific embodiment of the invention.
In the Drawings:
FIG. 1 is a diagram which shows an example of a source program for describing dependence relaxation;
FIG. 2A is a diagram which shows an example of an assembler file that does not include a speculative load command for describing dependence relaxation performed using speculative execution;
FIG. 2B is a diagram which shows an example of an assembler file that includes a speculative load command for describing dependence relaxation performed using speculative execution;
FIG. 3 is a diagram which shows an outside view of the structure of the compiler system according to the embodiment of the present invention;
FIG. 4 is a diagram which shows the structure of the compiler system according to the embodiment of the present invention;
FIG. 5 is a diagram which shows the structure of the compiler;
FIG. 6 is a flowchart showing the process executed by the compiler;
FIG. 7 is a detailed flowchart showing an ambiguous memory dependence relaxation optimized process;
FIG. 8 is a detailed flowchart showing an ambiguous memory dependence detection process;
FIG. 9 is a detailed flowchart showing an ambiguous memory dependence relaxation process;
FIG. 10A through FIG. 10C are diagrams for describing the dependence relaxation process for the same object size access in a non-loop structure;
FIG. 11A through FIG. 11D are diagrams for describing the dependence relaxation process for differing object size access (small to big) in a non-loop structure;
FIG. 12A through FIG. 12D are diagrams for describing the dependence relaxation process for differing object size access (big to small) in a non-loop structure;
FIG. 13A through FIG. 13C are diagrams for describing the situation in which the comparison process is placed outside of the loop with the dependence relaxation process for the same object size access in the loop structure;
FIG. 14A through FIG. 14C are diagrams for describing the situation in which a comparison process is necessary in the loop with the dependence relaxation process for the same object size access in the loop structure;
FIG. 15A through FIG. 15B are diagrams for describing the dependence relaxation process for differing object size access (small to big) in a non-loop structure;
FIG. 16A through FIG. 16B are diagrams for describing the dependence relaxation process for differing object size access (big to small) in a loop structure;
FIG. 17A through FIG. 17C are diagrams for describing the dependence relaxation process for when the same object size access is consecutive in the non-loop structure.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 1 of 14
FIG. 3 is a diagram which shows an outside view of the structure of the compiler system according to the embodiment of the present invention. The compiler system is realized by executing a variety of programs in the computer shown in FIG. 3 .
FIG. 4 is a diagram which shows the structure of the compiler system according to the embodiment of the present invention.
The compiler system 100 is a software system which converts the source program 200 written in high-level language such as C into an executable program 230 written in machine language and includes a compiler 110 , an assembler 120 and a linker 130 .
The compiler 110 is a target processor with a CPU that includes a yes or no execution flag register which can control whether or not a command is executed as a target processor and a program which converts the source program 200 into an assembler file 210 written in assembler language. When the compiler 110 converts the source program 200 into the assembler file 210 , the compiler 110 performs an optimized process using the memory dependence relaxation optimizing unit and the command scheduling optimized unit, and outputs the assembler file 210 .
The assembler 120 is a program which converts the assembler file 210 written in assembler language into an object file 220 written in machine language. The linker 130 is a program which combines plural object files 220 and generates an executable program 230 . A simulator 140 and a profiler 150 are prepared as development tools for the executable program 230 . The simulator 140 is a program which simulates the executable program 230 and outputs a variety of executable log data when the program is executed. The profiler 150 is a program which analyzes the executable log data 240 and outputs the profile data 250 for which the execution sequence and so on has been analyzed.
By executing the variety of programs on the computer, an executable program 230 is created using the source program 200 .
[Structure of the Compiler]
FIG. 5 is a diagram which shows the structure of the compiler 110 .
The compiler 110 includes a parsing unit 111 , an optimized information parsing unit 112 , a conventional optimization unit 113 , an ambiguous memory dependence relaxation optimizing unit 114 , a command scheduling unit 115 and a code output unit 116 . Each structural processing unit is realized as a program executed on the computer.
The parsing unit 111 is a processing unit which outputs an intermediate language program (intermediate code) after receiving the source program 200 as input and performing the parsing process on the source program 200 .
The optimized information analysis unit 112 is a processing unit which reads out information necessary for an optimizing process in intermediate code such as a cache parameter 201 , profile data 250 , a compiler option and a pragma. The compiler option and the pragma are both instructions for the compiler 110 .
The conventional optimizing unit 113 is a processing unit which performs a conventional optimization process on the intermediate code.
The ambiguous memory dependence relaxation optimizing unit 114 is a processing unit which relaxes ambiguous memory dependence in a critical path.
The command scheduling unit 115 is a processing unit which optimizes the command line and performs command scheduling.
The code output unit 116 is a processing unit which converts the optimized intermediate code into assembler code written in assembler language and outputs the assembler file 210 including the assembler code.
[Process Flow]
Next, the sequence of processes executed by the compiler 110 is described. FIG. 6 is a flowchart for the process executed by the compiler 110 .
The parsing unit 111 performs the parsing process for the source program 200 and generates intermediate code (S 1 ). The optimized information analysis unit 112 analyzes a cache parameter 201 , profile data 250 , a compiler option, a pragma and so on (S 2 ). The conventional optimizing unit 113 conventionally optimizes intermediate code according to an analysis result in the optimization information analysis unit 112 (S 3 ). The ambiguous memory dependence relaxation optimizing unit 114 focuses on the memory access process with ambiguous memory dependence on a critical path in the intermediate code, and if necessary, inserts a correction process and relaxes the ambiguous memory dependence (S 4 ). The command scheduling unit 115 schedules the commands (S 5 ). The code output unit 116 converts the intermediate code into assembler code and outputs the assembler code as an assembler file 210 (S 6 ).
Since the parsing process (S 1 ), the optimized information analysis program (S 2 ), the conventional optimization process (S 3 ), the command scheduling process (S 5 ) and the assembler code output process (S 6 ) are the same as conventional processes, detailed explanations of these processes are not repeated here.
A detailed explanation is provided for the ambiguous memory dependence relaxation optimizing process (S 4 ).
FIG. 7 is a detailed flowchart describing the ambiguous memory dependence relaxation optimizing process (S 4 in FIG. 6 ).
The ambiguous memory dependence relaxation optimizing unit 114 is activated when there is an optimization command provided by the compiler option or the pragma instruction and the like. When there is an instruction for optimization (YES in S 9 ), the ambiguous memory dependence relaxation optimizing unit 114 receives intermediate code as input and detects a critical path (S 10 ). When there is no instruction for optimization (NO in S 9 ), the ambiguous memory dependence relaxation optimizing unit 114 finishes the process. The detection process for the critical path is the same as a conventional process and thus a detailed explanation is not repeated here. The critical path is a command string which takes the longest time to execute among command lines which generate by (possibly) defining or referencing a resource (register, memory, external port and so on) and which are linked by dependence. Note that a dependence generated based on the fact that there is a possibility of the material being defined or referenced is known as an ambiguous dependence. Generally, the critical path is found using a dependence graph known as a Directed Acylic Graph (DAG) made of elements known as nodes or edges. Here, a critical path can be found based on conventional graph theory which uses a command as a node, a dependence as an edge and a dependence distance (execution time between commands) as an edge distance.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 2 of 14
The ambiguous memory dependence relaxation optimizing unit 114 detects a logically consecutive memory access process with ambiguous memory dependence in the detected critical path (S 11 ). The ambiguous memory dependence relaxation process (S 11 ) is described below.
When there is no consecutive memory access process with an ambiguous memory dependence relationship (NO in S 12 ) to be optimized, the ambiguous memory dependence relaxation optimizing unit 114 finishes the process.
When there is a memory access process to be optimized (YES in S 12 ), the ambiguous memory dependence relaxation optimizing unit 114 relaxes the ambiguous memory dependence in the detected memory access process (S 13 ). The dependence relaxation process (S 13 ) is described below.
The ambiguous memory dependence relaxation optimizing unit 114 assesses whether or not the ambiguous memory dependence relaxation has been performed (S 14 ) and when the relaxation has not been able to be performed (NO in S 14 ), an ambiguous memory dependence detection process described below (S 11 ) is repeatedly performed for processes which follow the memory access process.
When the ambiguous memory dependence relaxation has been performed (YES in S 14 ), the ambiguous memory dependence relaxation optimizing unit 114 detects a repeated critical path from the process which relaxes the ambiguous memory dependence (S 15 ). The ambiguous memory dependence relaxation optimizing unit 114 determines whether or not the critical path length has been shortened after applying the optimizing process by comparing the total length of the re-detected critical path and the total length of the critical path before being processed (S 16 ).
When it is determined that the critical path length has shrunk (YES in S 16 ), the ambiguous memory dependence relaxation optimizing unit 114 recursively and repeatedly executes a process for relaxing ambiguous memory dependence for the shortened critical path (S 11 ).
Whether the critical path length has not been shortened, or when the critical path length is the same (NO in S 16 ), the ambiguous memory dependence relaxation optimizing unit 114 deletes the dependence relaxation process performed immediately prior (S 17 ). In other words the dependence relaxation process performed immediately prior is not performed (S 13 ). Subsequently, the ambiguous memory dependence relaxation optimizing unit 114 repeatedly performs the processes below in the ambiguous memory dependence relaxation (S 11 ) for the processes which follow the memory access process.
A detailed explanation is provided for the ambiguous memory dependence detection process (S 11 ) and the dependence relaxation process (S 13 ).
FIG. 8 is a detailed flowchart of the ambiguous memory dependence detection process (S 11 in FIG. 7 ).
The ambiguous memory dependence relaxation optimizing unit 114 repeatedly executes the processes below (S 20 ) while selecting commands in order from the top for the critical path detected in the critical path detection process (S 10 in FIG. 7 ).
The process selected by the ambiguous memory dependence relaxation optimizing unit 114 is a memory access process, and the ambiguous memory dependence relaxation optimizing unit 114 judges only whether or not there is a process among the processes subsequent to the memory access processes which is in an ambiguous memory dependence relationship with the memory access process (S 21 ).
When the selected process is not a memory access process or the selected process is a memory access process but there is no process among the processes following the memory access process which is only in an ambiguous dependence relationship for the memory access process (NO in S 21 ), the ambiguous memory dependence relaxation optimizing unit 114 selects the next process (S 20 ) and performs the same type of judgment (S 21 ).
When the selected process is a memory access process, and when there is a process in only an ambiguous memory dependence on the memory access process among the processes following the memory access process (YES in S 21 ), the ambiguous memory dependence relaxation optimizing unit 114 assesses whether or not the address variable name to be optimized is designated by a pragma or a compiler option (S 22 ).
When the address variable name to be optimized is designated (YES in S 22 ), the ambiguous memory dependence relaxation optimizing unit 114 assesses whether or not the address variable name for the memory access process to be optimized matches with the designated variable name (S 23 ). When the variable names do not match (NO in S 23 ), the ambiguous memory dependence relaxation optimizing unit 114 selects the next process (S 20 ) and repeatedly executes the processes after S 21 .
When the variable names match (YES in S 23 ), or when the address variable name to be optimized is not designated (NO in S 22 ), the ambiguous memory dependence relaxation optimizing unit 114 assesses whether or not a flag register resource in the target processor is usable (S 24 ). Since the assessment of whether or not the yes or no execution flag register resource can be used can be performed using living range analysis and so on used when conventionally optimizing the distribution of the register, a detailed explanation is not repeated here.
When there is no yes/no executability flag register that can be used among the memory access processes that are in the ambiguous memory dependence relationship (NO in S 24 ), the next process is selected (S 20 ) and the processes behind S 20 are repeatedly executed.
When there is a yes/no executability flag register resource that can be used (YES in S 24 ), the ambiguous memory dependence relaxation optimizing unit 114 assesses whether or not the memory reference command included in the memory access process in the ambiguous memory dependence relationship can be shifted in front of a memory substitution command (S 25 ). In other words, the ambiguous memory dependence relaxation optimizing unit 114 analyzes whether or not the memory substitution command and the existing command are between the memory reference command and the memory substitution command, and when the memory substitution command the existing command are not between the memory reference command and the memory substitution command, the ambiguous memory dependence relaxation optimizing unit 114 judges that the memory reference command can be shifted, and when the memory substitution command the existing command are between the memory reference command and the memory substitution, the ambiguous memory dependence relaxation optimizing unit 114 judges that the memory reference command can be shifted. When the memory reference command cannot be shifted (NO in S 25 ), the ambiguous memory dependence relaxation optimizing unit 114 selects the next process (S 20 ) and repeatedly executes the processes after S 21 .
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 3 of 14
When the memory reference command can be shifted (YES in S 25 ), the ambiguous memory dependence relaxation optimizing unit 114 returns the memory access process which is in an ambiguous memory dependence relationship detected in S 21 (returning the memory access process as a return value) (S 26 ). Even when all of the processes have finished being searched for, and there is no memory access process to be optimized, the ambiguous memory dependence relaxation optimizing unit 114 finishes the search loop (S 20 ), and finishes the ambiguous memory dependence process detection.
FIG. 9 is a detailed flowchart of a dependence relaxation process (S 13 in FIG. 7 ).
The ambiguous dependence relaxation optimizing unit 114 determines whether or not the memory access process detected in the ambiguous memory dependence detection process (S 11 in FIG. 7 , FIG. 8 ) is in ambiguous true memory dependence (S 30 ).
When the memory access process is not in an ambiguous true memory dependence (NO in S 30 ), the ambiguous memory dependence relaxation optimizing unit 114 finishes the process. When the memory access process is in an ambiguous true memory dependence (YES in S 30 ), the ambiguous memory dependence relaxation optimizing unit 114 shifts the load process for the data stored in the memory directly in front of the store process (S 31 ) and determines whether or not the memory region sizes (object size) for the memory access processes in the dependence relationship are equal in size to the load data (S 32 ).
When the object sizes differ (NO in S 32 ), the ambiguous memory dependence relaxation optimizing unit 114 inserts a comparison process for comparing the ranges of the address register values in the memory access process directly in front of the loading process (S 33 ), inserts a correction process for each address depending on the result of the address range comparison process after the loading process (S 34 ) and finishes the process.
The comparison process for comparing the range of the address register values (S 33 ) is performed as described below. The mutual memory access processes are APb and APs. Additionally, the memory access addresses for APb and APs are AAb and AAs respectively. Further, the memory access region sizes for APb and APs are ASb and ASs. Additionally, the greatest common denominator (gcd) for ASb and ASs (ASb, ASs) is GAS, and when ASb>ASs, the number of comparisons n is ASb/GAS and in the process, the n comparisons below (AAb+GAS*0==AAs, AAb+GAS*1==AAS, AAb+GAS*2==AAS, . . . , AAb+GAS*(n−1)==AAs) are performed. Thus the ambiguous dependence relaxation optimizing unit 114 detects the dependence memory region. In other words, when the comparison result AAb+GAS*k==AAs is true, and ASb>ASs, the region GAS*k bytes away from the top access address AAb in the memory region accessed by APb, and the memory region accessed by APs are in a dependence relationship.
The correction process for each address (S 34 ) is a process which inserts a substitution process with a yes or no execution flag after the loading process, the yes or no execution flag-attached substitution process overwriting only the region portion corresponding to the dependence memory region in data stored in the store process to the data substituted in the load process for each result of a comparison process which compares the range of the address register values (S 33 ).
When the object size is the same (YES in S 32 ), the ambiguous memory dependence relaxation optimizing unit 114 determines whether or not the memory access process in the ambiguous memory dependence relationship is a process in the loop (S 35 ). When the process is not in the loop (NO in S 35 ), the ambiguous memory dependence relaxation optimizing unit 114 assesses whether or not the address comparison process generated when the other ambiguous memory dependence is relaxed can be diverted (S 36 ). During the determination, when the address variables match and the fluctuation values for the address variables in the loading process are equal (YES in S 36 ), the ambiguous memory dependence relaxation optimizing unit 114 diverts the address comparison process and skips the insertion process for the address comparison process (S 40 ). On the contrary, when there is no address comparison process in the assessment in S 36 , or the address variables do not match, or when there is a possibility that the fluctuation values for the address variable are not equal (NO in S 36 ), the ambiguous memory dependence relaxation optimizing unit 114 inserts the address match comparison process directly in front of the load process (S 40 ).
When the two memory access processes are within the loop (YES in S 35 ), it is assessed whether or not the increased value by which the memory addresses change in the loop process are fixed and equal (S 37 ). When the increase value of the memory address are not mutually fixed, or are not equal (NO in S 37 ), the insertion process for the address match comparison process is performed (S 36 , S 40 ) in the same way as when the memory access process is not a process within the loop (NO in S 35 ).
When the increased values of the memory addresses are fixed and equal (YES in S 37 ), the ambiguous memory dependence relaxation optimizing unit 114 inserts an address match comparison process at the tail-end of a pre-header process, which is the only preceding loop process (S 38 ). After the ambiguous memory dependence relaxation optimizing unit 114 inserts each comparison process (S 38 , S 40 ), a substitution process with a yes/no executable flag for over-writing data substituted in the loading process atop data stored in the store process is inserted after the loading process (S 39 ) and the process is finished.
[Compile Option]
In the compiler system 100 , the option “-fno-cut-ambiguous-depend” is provided as a compiling option for the compiler. Regardless of the pragma designation, when the compiler is executed and this option is designated, the compiler system 100 does not optimize relaxation for the ambiguous memory dependence. When there is no designation for this option, the compiler system 100 adheres to whether or not there is a “-O” (an optimizing command line option designation), in the same way as conventional optimization.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 4 of 14
[Pragma Designation]
The present designation is made for an immediately subsequent loop.
When variables are designated using the pragma “#pragma_cut_ambiguous_depend [variable name, variable name]”, the compiler system 100 performs ambiguous memory dependence relaxation optimizing focusing on only the address variable designated by the pragma. The variable designated may be an array or a pointer. When the variable designation is abbreviated, the compiler system 100 performs ambiguous memory dependence relaxation optimizing on all of the memory access.
Below, the ambiguous memory dependence relaxation process is described for several specific phases. Note that in the description of the process following, the program is written in quasi-assembler language in order to simplify the explanation, and the optimization process is actually performed by an intermediate language.
[Non-Loop Structure, Same Object Size Access]
FIG. 10A through FIG. 10C are diagrams for describing the dependence relaxation process for the object size access which is the same as the non-loop structure.
FIG. 10A is a diagram which shows an example of the source program 200 for the same object size access in the non-loop structure.
The process content of the source program 200 is a process which uses arguments pA and pB in a function as a base address, and substitutes a region value indicated by pB for a region value indicated by pA, and the process which adds the address value such that the addresses pA and pB respectively show the following elements continues twice. The memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are the same since the mutual address variables are of the same type.
FIG. 10 B(a) shows that the source program 200 is inputted into the compiler process shown in FIG. 6 and the source program 200 is an intermediate code converted from S 1 to S 3 in FIG. 6 as input into S 4 . A critical path shown in FIG. 10 C(a) is detected in the critical path detection process (S 10 in FIG. 7 ) using the inputted intermediate code (FIG. 10 B(a)). Since the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time have an ambiguous memory dependence, the critical path becomes a process flow including a series of processes: memory reference according to *pB, memory substitution according to *pA the first time, memory reference according to *pB and memory substitution according to *pA the second time.
An ambiguous memory dependence detection process (S 11 in FIG. 7 , FIG. 8 ) is executed for the critical path. In other words, the ambiguous memory dependence relaxation optimizing unit 114 searches for a process in the critical path from the top (S 20 in FIG. 8 ) and detects an ambiguous memory dependence in the memory substitution process according to *pA++ the first time and the memory reference process according to the second pB++ (S 21 in FIG. 8 ). Thus S 21 in FIG. 8 moves to YES.
Since the yes/no executable flag is not used in the intermediate code into which the yes/no executable flag is inputted, there is a yes/no executable flag register resource that can be used freely. Thus S 24 in FIG. 8 moves to YES.
A register r 1 and r 11 besides the memory necessary for memory dependence in the memory reference process is considered in a yes/no shiftable assessment process in the memory reference process (S 25 ). Although the register r 1 and r 11 may respectively depend on other processes, there is no dependence between the memory substitution process and the memory reference process according to the definition or reference of the registers r 1 and r 11 . Thus, since the memory reference process can be shifted, S 25 in FIG. 8 moves to YES.
Thus the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time are judged to be in an ambiguous memory dependence relationship and information about the dependence relaxation process (S 13 in FIG. 7 ) memory access process is provided to the dependence relaxation process (S 13 in FIG. 7 ) which is YES in S 12 in FIG. 7 . The dependence is relaxed for the memory access which has an ambiguous memory dependence (S 13 in FIG. 7 , FIG. 9 ).
The ambiguous memory dependence in the memory access process obtained is a reference to the memory using the definition for the memory according to *pA++ the first time and *pB++ the second time, and is a true dependence relationship. As a result, S 30 in FIG. 9 is YES, and the ambiguous memory dependence relaxation optimizing unit 114 shifts the memory reference process according to *pB the second time as in FIG. 10 B(b) in front of the memory substitution process according to *pA the first time (S 31 in FIG. 9 ). Since the store object size according to pA in the memory access process and the load object size according to pB are equal, S 32 in FIG. 9 is YES and further S 35 in FIG. 9 is NO since the memory access processes are not loop processes.
When S 35 in FIG. 9 is NO, there is no prior existing address comparison process. Thus S 36 in FIG. 9 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 inserts the address comparison process which performs comparison to find whether or not there is a match between a value of the register r 1 distributed to the address variable pB and the value of the register r 0 distributed to the address variable pA (S 40 in FIG. 9 ). Note that when the values of r 1 and r 0 in the address comparison process “cmpeq C 0 , r 1 , r 0 ” shown in FIG. 10 B(b) are equal, a yes/no condition flag c 0 is substituted.
Finally, in order to correctly preserve the logic when there is actual dependence during the ambiguous memory dependence, the ambiguous memory dependence relaxation optimizing unit 114 inserts a correction command with a yes/no executable flag after the memory reference process according to the shifted *pB ( 39 in FIG. 9 ) such that r 11 , the value obtained in the memory reference process when the addresses match according to *pB according to the yes or no execution flag register, is overwritten atop the value r 10 which is substituted in the memory substitution process according to *pA. In the yes or no execution flag-attached correction command shown in FIG. 10 B(b), when C 0 ==1, in other words when the values of r 1 and r 0 are equal, the command ‘mov’ is executed.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 5 of 14
In this way the dependence relaxation in the dependence relaxation process (S 13 in FIG. 7 ) is performed. Thus, S 14 in FIG. 7 is YES and when the critical path for the dependence relaxed intermediate code is re-detected (S 15 in FIG. 7 ), the critical path includes only the true dependence between the memory reference according to *pB the first time, the correction command with yes/no executable flag and the memory substitution process by *pA. In other words, when the latency according to the memory reference process is 3 cycles, the length of the critical path is from 7 cycles in FIG. 10 C(a) to 4 cycles in FIG. 10 C(b). Thus S 16 in FIG. 7 is YES and S 11 in FIG. 7 is executed recursively. In this example, since all of the ambiguous memory dependence is eliminated, the memory access for which the dependence is relaxed is not detected in the ambiguous memory dependence detection process the second time (S 11 in FIG. 9 ). Thus, S 12 in FIG. 7 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 ends the process.
In this way, by performing an ambiguous memory dependence relaxation process ( FIG. 7 , S 4 in FIG. 6 ) and shortening the critical path, a more powerful intermediate code can be realized using a command scheduling process (S 5 in FIG. 6 ), and an object code is generated and the compiling process finished during the assembler code output process (S 6 in FIG. 6 ).
[Non-Loop Structure/Differing Object Size Access (Small→Large)]
FIG. 11A through FIG. 11D are diagrams for describing the dependence relaxation process for the object size access which varies in the non-loop structure (small→large: the memory access size being smaller than the second memory access the first time).
FIG. 11A is a diagram which shows an example of the source program 200 having a varying object size access in the non-loop structure.
The process content of the source program 200 performs a process twice, the process using arguments pA and pB of the function as a base address, substitutes the region value indicated by pB for the region value indicated by pA, and adds the address values pA and pB such that the following respective elements are shown. The memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are respectively 4 bytes and 2 bytes and thus the store object size is larger than the load object size. FIG. 11 B(a) shows that the source program 200 is inputted into the compiler process shown in FIG. 6 , and is an intermediate code converted from S 1 to S 3 in FIG. 6 as input into S 4 . A critical path as shown in FIG. 11 C(a) is detected in the critical path detection process (S 10 in FIG. 7 ) using the inputted intermediate code ( FIG. 11B (a)). Since the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time have an ambiguous memory dependence, the critical path becomes a process flow including a series of processes: memory reference according to *pB the first time, memory substitution according to *pA, memory reference according to *pB the second time and memory substitution according to *pA.
An ambiguous memory dependence detection process (S 11 in FIG. 7 , FIG. 8 ) is performed for the critical path. In other words, the ambiguous memory dependence relaxation optimizing unit 114 searches for a process in the critical path from the top (S 20 in FIG. 8 ) and detects an ambiguous memory dependence between the memory substitution process according to *pA++ the first time and the memory reference process using the *pB++ the second time (S 21 in FIG. 8 ). Thus S 21 in FIG. 8 moves to YES.
Since the intermediate code into which the yes/no executable flag is inputted is not used, there is a yes/no executable flag register resource which can be used freely. Thus S 24 in FIG. 8 moves to YES.
The registers r 1 and r 11 besides the memory necessary for ambiguous memory dependence in the memory reference process are considered when performing a yes/no shiftable assessment process in the memory reference process (S 25 ). There may be other processes besides the register r 1 and r 11 , however in this case there is no dependence according to the definition or reference of the registers r 1 and r 11 between the memory substitution process and the memory reference process. Thus, since the memory reference process can be shifted, S 25 in FIG. 8 moves to YES.
Thus in S 26 in FIG. 8 , the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time are judged to be in an ambiguous memory dependence relationship, and information about the memory access process is passed to the dependence relaxation process (S 13 in FIG. 7 ) for which S 12 in FIG. 7 is YES. The dependence is relaxed for the memory access process having an ambiguous memory dependence (S 13 in FIG. 7 , FIG. 9 ).
The ambiguous memory dependence in the obtained memory access process is a definition of the memory according to *pA++ the first time and a reference to the memory according to *pB++ the second time and is in a true dependence relationship due to the memory. Thus, S 30 in FIG. 9 is YES, and the ambiguous memory dependence relaxation optimizing unit 114 shifts the memory reference process according to *pB the second time prior to the memory substitution process using the *pA the first time as in FIG. 11 B(b). Since the store object size according to pA in the memory access process and the load object size according to pB are different, S 32 in FIG. 9 is NO.
Thus S 32 in FIG. 9 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 inserts the address range comparison process directly prior to the memory reference process (S 33 in FIG. 9 ). The address range comparison process is found using the process below. In other words, since the store object size according to pA and the load object size according to pB are respectively 4 bytes and 2 bytes, the greatest common denominator (gcd) of the sizes is found to be 2 and the number of comparisons is found to be 4 bytes/gcd (4 byte, 2 byte). Additionally, since the register to which the address variable pB has been allocated is r 1 and the register to which the address variable pA has been allocated is r 0 , a process for comparing the two address matches r 0 ==r 1 +2*0 and r 0 ==r 1 +2*1 is needed. The ambiguous memory dependence relaxation optimizing unit 114 inserts the needed address range comparison process directly prior to the memory reference process (S 33 in FIG. 9 ). In the intermediate code in FIG. 11 B(b), an XOR operation for both addresses is taken in order to efficiently perform the comparison process, and a comparison process is performed to find whether or not the result is or whether both addresses diverge by 2 bytes.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 6 of 14
Finally, in order to correctly preserve the logic when there is actual dependence in the ambiguous memory dependence, the ambiguous memory dependence relaxation optimizing unit 114 inserts a correction command with a yes/no executable flag behind the memory reference process according to the shifted *pB (S 34 in FIG. 9 ) the value r 10 which has been substituted by the memory substitution process according to *pA is overwritten over a portion of the data corresponding to a memory region where there is a dependence in r 11 , which is the value obtained by the memory reference process according to *pB according to the yes or no execution flag register when the addresses match. In the intermediate code in FIG. 11 B(b), the ambiguous memory dependence relaxation optimizing unit 114 code expands the 16 bits from the 0 th bit to the 15 th bit in r 10 into r 11 as “extr r 11 , r 10 , 15 , 0 ” when there is a dependence in the bottom 16 bits, as in the memory image of the correction process in FIG. 11D . When there is a dependence in the top 16 bits, the ambiguous memory dependence relaxation optimizing unit 114 code expands the 16 bits from the 16 th bit in r 10 to the 31 st bit in r 10 into r 11 as “extr r 11 , r 10 , 31 , 16 ”. The necessary code expansion must be coordinated with the memory reference command function in r 11 . In this case, since the Idh process is anticipated to not only code expand the 16 bit data in the memory into 32 bit data, but also substitute the 16 bit data for the 32 bit data in the register, it is also anticipated that the Idh process must perform code expansion on the correction process and that the correction process is also code expanded in the extr process.
In this way, the dependence relaxation in the dependence relaxation process (S 13 in FIG. 7 ) is performed. Thus, S 14 in FIG. 7 is YES and when the critical path for the dependence-relaxed intermediate code is re-detected (S 15 in FIG. 7 ), the critical path includes only a true dependence between the memory reference according to *pB the first time, the correction command with a yes/no executable flag and the memory substitution process according to *pA. In other words, when the latency according to the memory reference process is 3 cycles, the length of the critical path is shortened from 7 cycles in FIG. 11 C(a) to 4 cycles in FIG. 11 C(b). Thus S 16 in FIG. 7 is YES, and S 11 in FIG. 7 is executed recursively. In this example, since all of the ambiguous memory dependence is eliminated, the memory access for which the dependence is relaxed is not detected in the ambiguous memory dependence detection process the second time (S 11 in FIG. 9 ). Thus, S 12 in FIG. 7 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 ends the process.
In this way, by performing an ambiguous memory dependence relaxation process ( FIG. 7 , S 4 in FIG. 6 ) and shortening the critical path even when the sizes for memory access differ, a higher-powered intermediate code can be achieved using the command scheduling process (S 5 in FIG. 6 ), an object code is generated and the compiling process is finished during the assembler code output process (S 6 in FIG. 6 ).
[Non-Loop Structure/Differing Object Size Access (Large→Small)]
FIG. 12A through FIG. 12D are diagrams for describing the dependence relaxation process for the varying object sizes (big→small: the memory access size for the first time is larger than the memory access size for the second time) in the non-loop structure.
FIG. 12A is a diagram which shows an example of the source program 200 with differing object size accesses in the non-loop structure.
The process content of the source program 200 is a process performed twice consecutively using arguments pA and pB in the function as base addresses, which substitutes the region value indicated by pB for the region value indicated by pA, and adds the address values pA and pB such that the following respective elements are shown. The memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are respectively 2 bytes and 4 bytes and thus the load object size is larger than the store object size.
FIG. 12 B(a) shows that the source program 200 is intermediate code which is inputted into the compiler process shown in FIG. 6 , converted in the process from S 1 to S 3 in FIG. 6 and inputted at S 4 . A critical path as shown in FIG. 12 C(a) is detected as shown in the critical path detection process (S 10 in FIG. 7 ) using the inputted intermediate code ( FIG. 12B (a)). Since the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time have an ambiguous memory dependence, the critical path is a process flow including a series of processes: memory reference according to *pB the first time, memory substitution according to *pA, memory reference according to *pB the second time and memory substitution according to *pA.
An ambiguous memory dependence detection process (S 11 in FIG. 7 , FIG. 8 ) is performed for the critical path. In other words, the ambiguous memory dependence relaxation optimizing unit 114 searches the processes in the critical path from the top (S 20 in FIG. 8 ), and detects an ambiguous memory dependence in the memory dependence process according to *pA++ the first time and in the memory reference process according to *pB++ the second time (S 21 in FIG. 8 ). Thus S 21 in FIG. 8 is YES.
Since the intermediate code into which the yes/no executable flag is inputted is not used, there is a yes/no executable flag register resource that can be used freely. Thus, S 24 in FIG. 8 is YES.
The registers r 1 and r 11 besides the memory necessary for ambiguous memory dependence in the memory reference process are considered in the yes/no shiftable assessment process in the memory reference process (S 25 ). There may be other processes besides those of the register r 1 and r 11 , however in this case there are no processes according to the definition or reference of the registers r 1 and r 11 between the memory substitution process and the memory reference process. Thus, S 25 in FIG. 8 is YES since the memory reference process can be shifted.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 7 of 14
Thus, in S 26 in FIG. 8 , the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time are judged to be in an ambiguous memory dependence relationship, thus S 12 in FIG. 7 is YES and information about the memory access process is passed to the dependence relaxation process (S 13 in FIG. 7 ). The dependence is relaxed for the memory access process with an ambiguous memory dependence (S 13 in FIG. 7 , FIG. 9 ).
The ambiguous memory dependence in the obtained memory access is a definition for the memory according to *pA++ the first time and a reference to the memory according to *pB++ the second time and is in a true dependence relationship according to the memory. Thus, S 30 in FIG. 9 is YES, and the ambiguous memory dependence relaxation optimizing unit 114 shifts the memory reference process according to *pB the second time in front of the memory substitution process according to *pA the first time (S 31 in FIG. 9 ) as in FIG. 12 B(b). Since the store object size according to pA and the load object size according to pB in the memory access process vary, S 32 in FIG. 9 is NO.
Thus when S 32 in FIG. 9 is NO, the ambiguous memory dependence relaxation optimizing unit 114 inserts the address range comparison process directly in front of the memory reference process (S 33 in FIG. 9 ). The address range comparison process is found using the process below. In other words, since the store object size according to pA and the load object size according to pB are respectively 2 bytes and 4 bytes, the greatest common denominator of the sizes is found to be 2 and the number of comparisons is found to be 4 bytes/gcd (4 bytes, 2 bytes). Additionally, since the register to which the address variable pB has been allocated is r 1 and the register to which the address variable pA has been allocated is r 0 , a process for comparing in order to find whether the two addresses match, r 1 ==r 0 +2*0 and r 1 ==r 0 +2*1, is needed. The ambiguous memory dependence relaxation optimizing unit 114 inserts the address range comparison needed as above directly prior to the memory reference process (S 33 in FIG. 9 ). In order to efficiently perform a comparison process in the intermediate code in FIG. 12 B(b), an XOR operation for both addresses is taken, and a comparison process is performed to find whether or not the result is 0 or whether both addresses diverge by 2 bytes.
Finally, in order to correctly preserve the logic when there is actual dependence in the ambiguous memory dependence, the ambiguous memory dependence relaxation optimizing unit 114 inserts a correction command with a yes/no executable flag behind the memory reference process according to the shifted *pB (S 34 in FIG. 9 ) such that a data portion corresponding to a memory region portion in which there is a dependence in r 10 , which is the value substituted in the memory substitution process according to *pA, is overwritten atop r 11 , which is the value obtained by the memory reference process according to *pB using the yes or no execution flag register when the addresses match. When there is a dependence in the bottom 16 bit portion in the intermediate code in FIG. 12 B(b), as in the memory image of the correction process in FIG. 12D , the ambiguous memory dependence relaxation optimizing unit 114 overwrites the bottom 16 bits in r 10 atop the bottom 16 bits of r 11 as “vain r 11 , r 10 , r 11 ”. Additionally, when there is a dependence in the top 16 bit portion, the ambiguous memory dependence relaxation optimizing unit 114 overwrites the top 16 bits in r 11 onto the top 16 bits of “valn r 11 , r 10 , r 11 ”.
In this way, the dependence relaxation in the dependence relaxation process (S 13 in FIG. 7 ) is performed. Thus, S 14 in FIG. 7 is YES and when the critical path for the intermediate code after dependence relaxation is re-detected (S 15 in FIG. 7 ), the critical path includes only the true dependence between the memory reference according to *pB the first time, the correction command with a yes/no executable flag and the memory substitution process according to *pA as shown in FIG. 12 C(b). In other words, when the latency according to the memory reference process is 3 cycles, the length of the critical path is shortened by 3 cycles from the 7 cycles in FIG. 12 C(a) to the 4 cycles in FIG. 12 C(b). Thus S 16 in FIG. 7 is YES and S 11 in FIG. 7 is executed recursively. In this example, since all of the ambiguous memory dependence is eliminated, the memory access for which the dependence is relaxed is not detected in the ambiguous memory dependence detection process the second time (S 11 in FIG. 9 ). Thus, S 12 in FIG. 7 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 ends the process.
In this way, by performing an ambiguous memory dependence relaxation process ( FIG. 7 , S 4 in FIG. 6 ) and shortening the critical path even when the sizes for memory access differ, a higher-powered intermediate code can be achieved using a command scheduling process (S 5 in FIG. 6 ); an object code is generated and the compiling process is finished in the assembler code output process (S 6 in FIG. 6 ).
[Assessment Inside and Outside the Loop Structure]
FIG. 13A through FIG. 13C are diagrams for describing a case in which the comparison processing can be put outside the loop using the dependence relaxation process for the same object size access in the loop structure.
FIG. 13A is a diagram which shows an example of the source program 200 in the loop structure.
The process content of the source program 200 is repeated 100 times and includes a process which substitutes the region value indicated by pB for the region value indicated by pA using arguments pA and pB in the function as base addresses, and a process performed twice consecutively which adds the address values pA and pB such that the following respective elements are shown in the addresses of pA and pB. Since the address variables are of the same type, the memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are the same.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 8 of 14
FIG. 13 B(a) shows that the source program 200 is intermediate code which is inputted into the compiler process shown in FIG. 6 , converted in the process from S 1 to S 3 in FIG. 6 and inputted at S 4 . A critical path such as that shown in FIG. 13 C(a) in the critical path detection process (S 10 in FIG. 7 ) is detected in the inputted intermediate code (FIG. 13 B(a). Since the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time have an ambiguous memory dependence, the critical path is a process flow including a series of processes: memory reference according to *pB and memory substitution according to *pA the first time, and memory reference according to *pB and memory substitution according to *pA the second time.
An ambiguous memory dependence detection process is performed for the critical path (S 11 in FIG. 7 , FIG. 8 ). In other words, the ambiguous memory dependence relaxation optimizing unit 114 searches the processes in the critical path from the top (S 20 in FIG. 8 ), and detects an ambiguous memory dependence between the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time (S 21 in FIG. 8 ). Thus S 21 in FIG. 8 is YES.
Only C 6 is used as the yes/no executable flag in the inputted intermediate code. Thus there is a yes/no executable flag register resource besides C 6 . Thus, S 24 in FIG. 8 is YES.
The registers r 1 and r 11 besides the memory necessary for ambiguous memory dependence in the memory reference process are considered in the yes/no shiftable assessment process of the memory reference process (S 25 ). The registers r 1 and r 11 may depend on other processes, however in this case there are no dependences according to the definition or reference of the registers r 1 and r 11 between the memory substitution process and the memory reference process for the shift destination. Thus, S 25 in FIG. 8 is YES since the memory reference process can be shifted.
Thus, in S 26 in FIG. 8 , the memory substitution process according to *pA++ the first time, and the memory reference process according to *pB++ the second time are judged to be in an ambiguous memory dependence relationship, thus S 12 in FIG. 7 is YES and information about the memory access process is passed to the dependence relaxation process (S 13 in FIG. 7 ). The dependence is relaxed for the memory access process having an ambiguous memory dependence (S 13 in FIG. 7 , FIG. 9 ).
The ambiguous memory dependence in the obtained memory access process is a definition for the memory according to *pA++ the first time, a reference to the memory according to *pB++ the second time and is in a true dependence relationship according to the memory. Thus, S 30 in FIG. 9 is YES, and the ambiguous memory dependence relaxation optimizing unit 114 shifts the memory reference process according to *pB the second time as in FIG. 13 B(b) in front of the memory substitution process according to *pA the first time (S 31 in FIG. 9 ). Since the store object size according to pA in the memory access process and the load object size according to pB are equal, S 32 in FIG. 9 is YES, and further, since the process is in the loop, S 35 in FIG. 9 is YES.
Since the address variables pA and pB statically add elements one by one as pA++ and pB++ respectively in the loop, S 37 is YES.
When S 37 is YES, the ambiguous memory dependence relaxation optimizing unit 114 inserts an address comparison process at the end of the pre-header process in the loop, the address comparison process performing a comparison to find whether or not there is a match between the value of the register r 1 which is allocated to the address variable pB and the value of the register r 0 which is allocated to the address variable pA (S 38 in FIG. 9 ).
Finally, in order to correctly preserve the logic when there is actual dependence in the ambiguous memory dependence, the ambiguous memory dependence relaxation optimizing unit 114 inserts a correction command with a yes/no executable flag after the memory reference process according to the shifted *pB ( 39 in FIG. 9 ) such that r 11 , which is the value obtained by the memory reference process according to *pB using the yes or no execution flag register when the addresses match, is overwritten atop the value r 10 that has been substituted in the memory substitution process according to *pA.
In this way, the dependence relaxation in the dependence relaxation process (S 13 in FIG. 7 ) is performed. Thus, S 14 in FIG. 7 is YES and when the critical path for the intermediate code which has been dependence relaxed is re-detected (S 15 in FIG. 7 ), the critical path includes only the true dependence between the memory reference according to *pB, the correction command with a yes/no executable flag and the memory substitution process according to *pA the first time. In other words, when the latency according to the memory reference process is 3 cycles, the length of the critical path goes from 7 cycles in FIG. 13 C(a) to 4 cycles in FIG. 13 C(b), being shortened by 3 cycles. Thus S 16 in FIG. 7 is YES and S 11 in FIG. 7 is executed recursively. In this example, since all of the ambiguous memory dependence is eliminated, the memory access for which the dependence is to be relaxed is not detected in the ambiguous memory dependence detection process the second time (S 11 in FIG. 9 ). Thus, S 12 in FIG. 7 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 ends the process.
In this way, by performing an ambiguous memory dependence relaxation process ( FIG. 7 , S 4 in FIG. 6 ), shortening the critical path, and the address comparison process is executed outside the loop, the process can be reduced since, object code is generated and the compiling process finished in the assembler code output process (S 6 in FIG. 6 ).
[Assessment in the Loop Structure and in the Loop]
FIG. 14A through FIG. 14C are diagrams which describe a case in which the comparison process is needed in the loop using the dependence relaxation process for the same object size access in the loop structure.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 9 of 14
FIG. 14A is a diagram which shows an example of the source program 200 in the loop structure.
The process content of the source program 200 is repeated 100 times in a loop and includes a process which substitutes the region value indicated by pB for the region indicated by pA using the arguments pA and pB in the function as base addresses, updates the address of pA with the value designated by the argument ‘inc’ as the increase value and updates the address such that pB shows the next element, and a process which substitutes the value in the region indicated by pB for the region indicated by pA using the updated pA and pB addresses and adds address values such that the next respective elements are shown in the addresses. Since the mutual address variables are of the same type, the memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are the same.
FIG. 14 B(a) shows that the source program 200 is an intermediate code inputted into the compiler process shown in FIG. 6 , converted from S 1 to S 3 in FIG. 6 and inputted into S 4 . A critical path as shown in FIG. 14 C(a) is detected in the critical path detection process (S 10 in FIG. 7 ) from the inputted intermediate code ( FIG. 14B (a)). Since the memory substitution process according to *pA the first time and the memory reference process according to *pB++ the second time have an ambiguous memory dependence, the critical path is a process flow including a series of processes: memory reference according to *pB and memory substitution according to *pA the first time, and memory reference according to *pB and memory substitution according to *pA the second time.
An ambiguous memory dependence detection process is performed on the critical path (S 11 in FIG. 7 , FIG. 8 ). In other words, the ambiguous memory dependence relaxation optimizing unit 114 searches the processes in the critical path from the top (S 20 in FIG. 8 ), and detects an ambiguous memory dependence between the memory substitution process according to *pA the first time and the memory reference process according to *pB the second time (S 21 in FIG. 8 ). Thus S 21 in FIG. 8 is YES.
Only C 6 is used as the yes/no executable flag in the inputted intermediate code. Thus there is a yes/no executable flag register resource besides C 6 . Thus, S 24 in FIG. 8 is YES.
The registers r 1 and r 11 besides the memory necessary for ambiguous memory dependence in the memory reference process are considered in the yes/no shiftable assessment process in the memory reference process (S 25 ). There may be cases where the registers r 1 and r 11 depend on other processes, however in this case there are no dependences according to the definition or reference in the registers r 1 and r 11 between the memory substitution process and the memory reference process for the shift destination. Thus, S 25 in FIG. 8 is YES since the memory reference process can be shifted.
Thus, in S 26 in FIG. 8 , the memory substitution process according to *pA++ the first time, and the memory reference process according to *pB++ the second time are judged to be in an ambiguous memory dependence relationship, S 12 in FIG. 7 is YES and information about the memory access process is passed to the dependence relaxation process (S 13 in FIG. 7 ). The dependence is relaxed for the memory access process with an ambiguous memory dependence (S 13 in FIG. 7 , FIG. 9 ).
The ambiguous memory dependence in the obtained memory access is a definition for the memory according to *pA++ the first time and a reference to the memory according to *pB++ the second time and is in a true dependence relationship due to the memory. Thus, S 30 in FIG. 9 is YES, and the ambiguous memory dependence relaxation optimizing unit 114 shifts the memory reference process according to *pB the second time in front of the memory substitution process according to *pA the first time as in FIG. 14 B(b) (S 31 in FIG. 9 ). Since the store object size according to pA in the memory access process and the load object size according to pB are equal, S 32 in FIG. 9 is YES, and further, since the process is in the loop, S 35 in FIG. 9 is YES.
The increase value for the address variables pA and pB is +1 and +inc for pA, and +1 and +1 for pB in the loop, and S 37 is NO since both addresses potentially have mutually different increase values.
When S 37 is NO, a dependence assessment must be executed each time in the loop and since there is no address comparison process already in the preceding processes, S 36 in FIG. 9 is NO. Thus, the ambiguous memory dependence relaxation optimizing unit 114 inserts the address comparison process, which compares to find whether or not there is a match between the value of the register r 1 allocated to the address variable pB and the value of the register r 0 allocated to the address variable pA, directly in front of the memory reference process shifted in S 31 in FIG. 9 (S 40 in FIG. 9 ).
Finally, in order to correctly preserve the logic when there is actual dependence in the ambiguous memory dependence, the ambiguous memory dependence relaxation optimizing unit 114 inserts a correction command with a yes/no executable flag after the memory reference process according to the shifted *pB ( 39 in FIG. 9 ) such that r 11 , which is the value obtained by the memory reference process according to *pB using the yes or no execution flag register when the addresses match, is overwritten atop the value r 10 that has been substituted by the memory substitution process according to *pA.
In this way, the dependence relaxation in the dependence relaxation process (S 13 in FIG. 7 ) is performed. Thus, S 14 in FIG. 7 is YES and when the critical path for the dependence-relaxed intermediate code is re-detected (S 15 in FIG. 7 ), the critical path includes only the true dependence between the memory reference according to *pB the first time, the correction command with a yes/no executable flag and the memory substitution process according to *pA. In other words, when the latency according to the memory reference process is 3 cycles, the length of the critical path goes from 7 cycles in FIG. 14 C(a) to 4 cycles in FIG. 14 C(b), being shortened by 3 cycles. Thus S 16 in FIG. 7 is YES, and S 11 in FIG. 7 is executed recursively. In this example, since all of the ambiguous memory dependence is eliminated, the memory access for which the dependence is relaxed is not detected in the ambiguous memory dependence detection process the second time (S 11 in FIG. 9 ). Thus, S 12 in FIG. 7 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 ends the process.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 10 of 14
In this way, by performing an ambiguous memory dependence relaxation process ( FIG. 7 , S 4 in FIG. 6 ) and shortening the critical path even when the address increase values for the memory access differ, a higher-powered intermediate code can be achieved using a command scheduling process (S 5 in FIG. 6 ), an object code is generated and the compiling process is finished in the assembler code output process (S 6 in FIG. 6 ).
[Loop Structure/Differing Object Size Access (Small→Large)]
FIG. 15A and FIG. 15B are diagrams for describing the dependence relaxation process for differing object size access in the loop structure (small→large: the first memory access size is smaller than the second memory access size).
FIG. 15A is a diagram which shows an example of the source program 200 for which the object size access differs in the loop structure.
The process content of the source program 200 is repeated 100 times in a loop includes a process which substitutes the region value indicated by pB for the region indicated by pA using arguments pA and pB in the function as base addresses, and a process performed twice consecutively which adds the address values such that the respective elements are shown in the addresses of pA and pB. The memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are respectively 4 bytes and 2 bytes and thus the store object size is larger than the load object size.
FIG. 15 B(a) shows that the source program 200 is intermediate code which is inputted into the compiler process shown in FIG. 6 , converted in the process from S 1 to S 3 in FIG. 6 and is inputted at S 4 . A critical path as shown in FIG. 11 C(a) is detected in the critical path detection process (S 10 in FIG. 7 ) from the inputted intermediate code ( FIG. 15B (a)). Since the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time have an ambiguous memory dependence, the critical path is a process flow including a series of processes: memory reference according to *pB and memory substitution according to *pA the first time, and memory reference according to *pB and memory substitution according to *pA the second time.
An ambiguous memory dependence detection process is performed on the critical path (S 11 in FIG. 7 , FIG. 8 ). In other words, the ambiguous memory dependence relaxation optimizing unit 114 searches the processes in the critical path from the top (S 20 in FIG. 8 ), and detects an ambiguous memory dependence between the memory substitution process using *pA++ the first time and the memory reference process according to *pB++ the second time (S 21 in FIG. 8 ). Thus S 21 in FIG. 8 is YES.
Only C 6 is used as the yes/no executable flag in the inputted intermediate code. Thus there is a yes/no executable flag register resource besides C 6 . Thus, S 24 in FIG. 8 is YES.
The registers r 1 and r 11 besides the memory necessary for ambiguous memory dependence in the memory reference process are considered in the yes/no shiftable assessment process of the memory reference process (S 25 ). There may be cases where the registers r 1 and r 11 depend on other processes, however in this case there are no dependences between the memory substitution process and the memory reference process for the shift destination according to the definition or reference in the registers r 1 and r 11 . Thus, S 25 in FIG. 8 is YES since the memory reference process can be shifted.
Thus, in S 26 in FIG. 8 , the memory substitution process according to *pA++ the first time, and the memory reference process according to *pB++ the second time are judged to be in an ambiguous memory dependence relationship, S 12 in FIG. 7 is YES and information about the memory access process is passed to the dependence relaxation process (S 13 in FIG. 7 ). The dependence is relaxed for the memory access process which has an ambiguous memory dependence (S 13 in FIG. 7 , FIG. 9 ).
The ambiguous memory dependence in the obtained memory access process is a definition for the memory according to *pA++ the first time, a reference to the memory according to *pB++ the second time and is in a true dependence relationship according to the memory. Thus, S 30 in FIG. 9 is YES, and the ambiguous memory dependence relaxation optimizing unit 114 shifts the memory reference process according to *pB the second time as in FIG. 15 B(b) in front of the memory substitution process according to *pA the first time (S 31 in FIG. 9 ). Since the store object size according to pA and the load object size according to pB in the memory access process are different, S 32 in FIG. 9 is NO.
Thus when S 32 in FIG. 9 is NO, the ambiguous memory dependence relaxation optimizing unit 114 inserts the address range comparison process directly in front of the memory reference process (S 33 in FIG. 9 ). The address range comparison process is found using the process below. In other words, since the store object size according to pA and the load object size according to pB are respectively 4 bytes and 2 bytes, the greatest common denominator of the sizes is found to be 2 and the number of comparisons is found to be 4 bytes/gcd (4 bytes, 2 bytes). Additionally, since the register to which the address variable pB has been allocated is r 1 and the register to which the address variable pA has been allocated is r 0 , a process for comparing the two address matches r 0 ==r 1 +2*0 and r 0 ==r 1 +2*1 is needed. The ambiguous memory dependence relaxation optimizing unit 114 inserts the found address range comparison process directly prior to the memory reference process (S 33 in FIG. 9 ). In order to efficiently perform a comparison process in the intermediate code in FIG. 15 B(b), an XOR operation for both addresses is taken, and a comparison process is performed to find whether or not the result is 0 or whether both addresses diverge by only 2 bytes.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 11 of 14
Finally, in order to correctly preserve the logic when there is actual dependence in the ambiguous memory dependence, the ambiguous memory dependence relaxation optimizing unit 114 inserts a correction command with a yes/no executable flag after the memory reference process according to the shifted *pB (S 34 in FIG. 9 ) such that r 10 , which is the value substituted in the memory substitution process according to *pA, is overwritten atop a data portion corresponding to a memory region portion in which there is a dependence in r 11 , which is the value obtained by the memory reference process according to *pB using the yes or no execution flag register when the addresses match. The ambiguous memory dependence optimizing unit 114 code expands the 16 bits from the 0th bit to the 15th bit in r 11 as “extr r 11 , r 10 , 15 , 0 ” when there is intermediate code in the bottom 16 bits, as in the memory image of the correction process in FIG. 1D . When there is a dependence in the top 16 bits, the ambiguous memory dependence optimizing unit 114 code expands and overwrites the 16 bits from the 16 th bit to the 31 st bit in r 10 onto r 11 as “extr r 11 , r 10 , 31 , 16 ”. The memory reference command function in r 11 must be coordinated with whether or not code expansion is necessary. In this case, since the Idh process is anticipated to not only expand the 16 bit data in the memory into 32 bit data, but also substitute the 32 bit data for the 16 bit data, it is also anticipated that the Idh process performs code expansion in the correction process and code expansion is performed using the extr process.
In this way, the dependence relaxation in the dependence relaxation process (S 13 in FIG. 7 ) is performed. Thus, S 14 in FIG. 7 is YES and when the critical path for the intermediate code which has been dependence relaxed is re-detected (S 15 in FIG. 7 ), the critical path includes only the true dependence between the memory reference according to *pB the first time, the correction command with yes/no executable flag and the memory substitution process according to *pA as in FIG. 11 . In other words, when the latency according to the memory reference process is 3 cycles, the length of the critical path goes from the 7 cycles to 4 cycles, being shortened by 3 cycles. Thus S 16 in FIG. 7 is YES and S 11 in FIG. 7 is executed recursively. In this example, since all of the ambiguous memory dependence is eliminated and the memory access for which the dependence is relaxed is not detected in the ambiguous memory dependence detection process the second time (S 11 in FIG. 9 ), S 12 in FIG. 7 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 finishes the process.
In this way, by performing an ambiguous memory dependence relaxation process ( FIG. 7 , S 4 in FIG. 6 ) and shortening the critical path even when the sizes for memory access differ, a higher-powered intermediate code can be achieved using a command scheduling process (S 5 in FIG. 6 ); an object code is generated and the compiling process is finished in the assembler code output process (S 6 in FIG. 6 ).
[Loop Structure/Differing Object Size Access (Large→Small)]
FIG. 16A and FIG. 16B are diagrams for describing the dependence relaxation process for differing object sizes in the loop structure (large→small: memory access size the first time is larger than memory access size the second time).
FIG. 16A is a diagram which shows an example of the source program 200 with differing object size accesses in the loop structure.
The process content of the source program 200 is repeated 100 times in a loop includes a process which substitutes the region value indicated by pB for the region value indicated by pA using arguments pA and pB in the function as base addresses, and a process performed twice consecutively which adds the address values such that the respective elements are shown in the addresses of pA and pB. The memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are respectively 2 bytes and 4 bytes and thus the load object size is larger than the store object size.
FIG. 16 B(a) shows that the source program 200 is intermediate code which is inputted into the compiler process shown in FIG. 6 , converted in the process from S 1 to S 3 in FIG. 6 and is inputted at S 4 . The critical path as shown in FIG. 12 C(a) is detected in the critical path detection process (S 10 in FIG. 7 ) from the inputted intermediate code ( FIG. 16B (a)). Since the memory substitution process according to *pA++ the first time and the memory reference process according to *pB++ the second time have an ambiguous memory dependence, the critical path is a process flow including a series of processes: memory reference according to *pB and memory substitution according to *pA the first time, and memory reference according to *pB and memory substitution according to *pA the second time.
The ambiguous memory dependence detection process is performed on the critical path (S 11 in FIG. 7 , FIG. 8 ). In other words, the ambiguous memory dependence relaxation optimizing unit 114 searches the processes in the critical path from the top (S 20 in FIG. 8 ), and detects an ambiguous memory dependence between the memory substitution process using *pA++ the first time and the memory reference process according to *pB++ the second time (S 21 in FIG. 8 ). Thus S 21 in FIG. 8 is YES.
Only C 6 is used as the yes/no executable flag in the inputted intermediate code. Thus there is a yes/no executable flag register resource besides C 6 . Thus, S 24 in FIG. 8 is YES.
The registers r 1 and r 11 besides the memory necessary for ambiguous memory dependence in the memory reference process are considered in the yes/no shiftable assessment process in the memory reference process (S 25 ). There may be cases where the registers r 1 and r 11 depend on other processes, however in this case there are no dependences according to the definition or reference for the registers r 1 and r 11 between the memory substitution process and the memory reference process for the shift destination. Thus, S 25 in FIG. 8 is YES since the memory reference process can be shifted.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 12 of 14
Thus, in S 26 in FIG. 8 , the memory substitution process according to *pA++ the first time, and the memory reference process according to *pB++ the second time are judged to be in an ambiguous memory dependence relationship and thus S 12 in FIG. 7 is YES and information about the memory access process is passed to the dependence relaxation process (S 13 in FIG. 7 ). The dependence is relaxed for the memory access process which has an ambiguous memory dependence (S 13 in FIG. 7 , FIG. 9 ).
The ambiguous memory dependence in the obtained memory access process is a definition for the memory according to *pA++ the first time, a reference to the memory according to *pB++ the second time and is in a true dependence relationship according to the memory. Thus, S 30 in FIG. 9 is YES, and the ambiguous memory dependence relaxation optimizing unit 114 shifts the memory reference process according to *pB the second time as in FIG. 16 B(b) in front of the memory substitution process according to *pA the first time (S 31 in FIG. 9 ). Since the store object size according to pA in the memory access process and the load object size according to pB are different, S 32 in FIG. 9 is NO.
Thus when S 32 in FIG. 9 is NO, the ambiguous memory dependence relaxation optimizing unit 114 inserts the address range comparison process directly in front of the memory reference process (S 33 in FIG. 9 ). The address range comparison process is found using the process below. In other words, since the store object size according to pA and the load object size according to pB are respectively 2 bytes and 4 bytes, the greatest common denominator of the sizes is found to be 2 and the number of comparisons n is found to be 4 bytes/gcd (2 bytes, 4 bytes). Additionally, since the register to which the address variable pB has been allocated is r 1 and the register to which the address variable pA has been allocated is r 0 , a process for comparing the two address matches r 0 ==r 1 +2*0 and r 0 ==r 1 +2*1 is needed. The ambiguous memory dependence relaxation optimizing unit 114 inserts the found address range comparison process directly in front of the memory reference process (S 33 in FIG. 9 ). In order to efficiently perform a comparison process in the intermediate code in FIG. 16 B(b), an XOR operation for both addresses is taken, and a comparison process is performed to find whether or not the result is 0 or whether both addresses diverge by only 2 bytes.
Finally, in order to correctly preserve the logic when there is actual dependence during the ambiguous memory dependence, the ambiguous memory dependence relaxation optimizing unit 114 inserts a correction command with a yes/no executable flag after the memory reference process according to the shifted *pB (S 34 in FIG. 9 ) such that a portion of the data corresponding to the memory region which includes a dependence in r 10 , which has been substituted by the memory substitution process according to *pA, over r 11 which is the value obtained by the memory reference process according to *pB according to the yes or no execution flag register when the addresses match. When there is a dependence in the bottom 16 bit portion in the intermediate code in FIG. 16 B(b), the ambiguous memory dependence relaxation optimizing unit 114 overwrites the bottom 16 bits in r 10 atop the bottom 16 bits of r 11 “vain r 11 , r 10 , r 11 ” as in the memory image of the correction process in FIG. 12D . Additionally, when there is a dependence in the top 16 bit portion, the ambiguous memory dependence relaxation optimizing unit 114 overwrites the upper 16 bits in r 10 onto the upper 16 bits as “vain r 11 , r 10 , r 11 ”.
In this way, the dependence relaxation in the dependence relaxation process (S 13 in FIG. 7 ) is performed. Thus, S 14 in FIG. 7 is YES and when the critical path for the dependence-relaxed intermediate code is re-detected (S 15 in FIG. 7 ), the critical path includes only the true dependence between the memory reference according to *pB, the correction command with a yes/no executable flag and the memory substitution process according to *pA the first time as in FIG. 12 C(b). In other words, when the latency according to the memory reference process is 3 cycles, the length of the critical path goes from 7 cycles to 4 cycles, being shortened by 3 cycles. Thus S 16 in FIG. 7 is YES and S 11 in FIG. 7 is executed recursively. In this example, since all of the ambiguous memory dependence is eliminated, the memory access for which the dependence is relaxed is not detected in the ambiguous memory dependence detection process the second time (S 11 in FIG. 9 ). Thus, S 12 in FIG. 7 is NO, and the ambiguous memory dependence relaxation optimizing unit 114 ends the process.
In this way, by performing an ambiguous memory dependence relaxation process ( FIG. 7 , S 4 in FIG. 6 ) and shortening the critical path even when the sizes for memory access differ, a higher-powered intermediate code can be achieved using a command scheduling process (S 5 in FIG. 6 ), and an object code is generated and the compiling process is finished in the assembler code output process (S 6 in FIG. 6 ).
[Non-Loop Structure/Consecutive Same Object Size Access]
FIG. 17A through 17C are diagrams for describing the dependence relaxation process for when the object size access in the non-loop structure is consecutive.
FIG. 17A is a diagram which shows an example of the source program 200 in which the same object size is consecutive in the non-loop structure.
The process content of the source program 200 includes a process performed twice consecutively which uses arguments pA and pB in the function as base addresses, which substitutes the region value indicated by pB for the region value indicated by pA, and a process which adds the address values pA and pB such that the respective elements are shown. Since the mutual address variables are of the same type, the memory region size substituted at the address variable pA (store object size) and the memory region size referenced at the address variable pB (load object size) are the same.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 13 of 14
FIG. 17 B(a) shows that the source program 200 is intermediate code which is inputted into the compiler process shown in FIG. 6 , converted in the process from S 1 to S 3 in FIG. 6 and inputted at S 4 . An intermediate code dependence relaxed as in FIG. 17 B(b) is generated via the conversion described in FIG. 10A through FIG. 10C from the inputted intermediate code (FIG. 17 B(a)), and further the dependence relaxation is performed in the same way on the continuous ambiguous memory dependence in the intermediate code. Thus “cmpeq C 0 , r 1 , r 0 ” should be inserted directly before the memory access process “Id r 12 , (r 1 +)” according to pB++ the third time as in the intermediate code in FIG. 17 C(a) in the front address comparison command detection assessment process (S 36 in FIG. 9 ). However there is a similar cmpeq process in front, and the increase values of the address variables pA and pB are fixed from the previous cmpeq process up until just before the Id process to be inserted. Thus the address comparison process is assessed to be divertable. Thus, the ambiguous memory dependence relaxation optimizing unit 114 diverts the yes or no execution flag register which is the result of the existing address comparison process without inserting the address comparison process, and the correction process is inserted (S 39 in FIG. 9 ).
In this way, in a consecutive memory access dependence relaxation, a further high-powered intermediate code (FIG. 17 C(b)) can be achieved by deleting the address comparison process.
[Optimization Compiler Option]
When a compiler option is designated as an instruction for optimization control, the compiler option is analyzed in the optimization information analysis process (S 2 in FIG. 6 ). As a result, even when the source program 200 which includes the ambiguous memory dependence to be optimized in for example FIG. 10A through FIG. 10C , the intermediate code converted in the same way according to the analysis result of the optimization information analysis process (S 2 in FIG. 6 ) is NO in S 9 in FIG. 7 , the ambiguous memory dependence optimization can be controlled and an increase in the generation machine language code size can be prevented.
[Pragma Directive]
When the pragma directive which is an instruction for specifying the optimization target is designated as related to memory dependence relaxation, symbol information is analyzed in the optimization information analysis process (S 2 in FIG. 6 ). As a result, when the source program 200 including the ambiguous memory dependence to be optimized in FIG. 10A through FIG. 10C is inputted, S 22 in FIG. 8 is YES. Thus, the ambiguous memory dependence relaxation optimizing unit 114 confirms the match of whether or not pA and pB are designated in the symbol information and when they do not match, S 23 is NO, the process is continued for the next ambiguous memory dependence and when there is a match, S 23 is YES and the ambiguous memory dependence relaxation process is continued behind S 24 . In this way, the ambiguous memory dependence to be relaxed can be specified and an increase in code size and a balance of the execution properties can be adjusted.
As described above, the ambiguous dependence is relaxed by inserting the address comparison process and the correction process depending on the result of the address comparison process into the ambiguous memory dependence process by using the compiler system according to present embodiment. Thus, the critical path is shortened and the process speed when the program is executed can be improved.
As above, the compiler system according to the embodiment of the present invention is described based on the embodiment, however the present invention is not limited to the embodiment. In the above embodiment, a compiler system for the C language is anticipated, however the present invention is not limited to only the C language. The significance of the present invention is maintained even when another programming language is used.
In the above embodiment, a compiler option is used as a user interface through which a programmer controls the dependence relaxation optimization, however the present invention is not limited to this interface. For example, information may be communicated by a pragma designation. The communication method is also not limited to a method which designates per file as in the above embodiment, and may have a structure which describes a processing range.
In the above embodiment, a pragma directive is used as a user interface in which the pragma designates the dependence relaxation target, however the present invention is not limited to this interface. For example, information may be communicated by option designation. The communication method is also not limited to a method which writes symbol information as in the above embodiment, and may have a structure which describes a processing range. Further, use may be designated per file as the granularity of the designated area or as the granularity in general. A data cache or an internal/external memory are anticipated as a memory access process in the above embodiment, however the present invention is not limited to this memory space. The significance of the present invention is maintained even with other shared resources. For example, another command such as an access command to a memory-mapped external port through which resources can be shared dynamically may be used.
In the above embodiment, dependence relaxation related to an ambiguous memory dependence is anticipated, however the present invention is not limited to only the ambiguous memory dependence. For example, the significance of the present invention is maintained even when there is a non-ambiguous, true dependence.
In the above embodiment, it is anticipated that there is an interlock as a target processor (a phenomenon in which the execution of consecutive commands is dynamically stopped by the processor when the execution result of a leading command is not forwarded to the register referenced by subsequent processes between commands generating a data dependence relationship), however the present invention is not limited to this. When no interlock is generated, a processor which utilizes architecture to statically solve these kinds of problems can be applied to the present invention.
›DESCRIPTION OF THE PREFERRED EMBODIMENT(S) · 14 of 14
For example, the dependence is not relaxed using the ambiguous memory dependence relaxation optimizing unit 114 , and when the object is to eliminate unnecessary latency wait time, the critical path may be shortened without interchanging the load process and the store process.
In the above embodiment, a correction process with conditions according to the yes/no execution flag depending on the result of the address comparison process is inserted, however the present invention does not limit only the yes/no execution condition to the correction process. For example, by applying a yes/no execution condition to the load command, unnecessary load processes can be eliminated.
The embodiment disclosed here is exemplary in all points, and should not be understood as limited. The range of the present invention is not that of the above explanation, and is instead shown by the range of the Claims; all changes in the range of the Claims with the same meaning are intended.
Although only some exemplary embodiments of this invention have been described in detail above, those skilled in the art will readily appreciate that many modifications are possible in the exemplary embodiments without materially departing from the novel teachings and advantages of this invention. Accordingly, all such modifications are intended to be included within the scope of this invention.
›INDUSTRIAL APPLICABILITY
The present invention is applicable to a process executed by a compiler, an operating system (OS) and a processor which relax the ambiguous dependence of a command for which resources can be dynamically shared.
Claims as granted
29 claimsLog in to read the claims of this application.
Log in to unlockClassifications
2 codes- G06F9/45
Claim changes
SoonSee which claims were amended, added or cancelled during examination, with every added and removed word marked.
The published claims of this application are not paired with the granted ones in what we hold.
File wrapper
See the full prosecution history — every USPTO and applicant action on this file, in order.
Log in to unlockDocuments
Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.
Log in to unlockChain of title
See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.
Log in to unlock