USPatentGranted
S1

Process shield for a substrate processing chamber

Granted 18 Jan 2022 · no office action yet

Application
29/728,820
filed 20 Mar 2020
Publication
Not published
not published
Patent· this page
US D941371
granted 18 Jan 2022

Life of the patent

2 dated events
⤢ drag to zoomApr 2020Jul 2020Oct 2020Jan 2021Apr 2021Jul 2021Oct 2021Jan 2022Prosecution
Prosecutionhover for detail · click to open

Description

1 parts
›FIG. 1 is a top isometric view of…

FIG. 1 is a top isometric view of a process shield for a substrate processing chamber, according to the first embodiment of the novel design.

FIG. 2 is a top plan view thereof.

FIG. 3 is a bottom plan view thereof.

FIG. 4 is a left side elevation view thereof.

FIG. 5 is a right side elevation view thereof.

FIG. 6 is a rear elevation view thereof.

FIG. 7 is a front elevation view thereof.

FIG. 8 is a cross-sectional view taken along line 8 - 8 ′ of FIG. 2 .

FIG. 9 is a top isometric view of a process shield for a substrate processing chamber, according to the second embodiment of the novel design.

FIG. 10 is a top plan view thereof.

FIG. 11 is a bottom plan view thereof.

FIG. 12 is a left side elevation view thereof.

FIG. 13 is a right side elevation view thereof.

FIG. 14 is a rear elevation view thereof.

FIG. 15 is a front elevation view thereof; and,

FIG. 16 is a cross-sectional view taken along line 16 - 16 ′ of FIG. 10 .

The dashed lines in FIGS. 1-16 represent unclaimed environment forming no part of the claimed design.

the grant prints no section headings; every part label below is ours, taken from that part's own first words

Claims

1 · 1 independent · depth 1
1 granted claims

Classifications

2 codes
USPC · US Patent Classification
D15/138D13/182

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

Pendency
1.8 y
669 days filing → grant
Office actions
0
none on record
Examiner
Calvin E Vansant
art unit 2915 · TC 2900
Citations: 49 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Chain of title

⤢ drag to zoom20202022202420262028203020322034203620382040Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Worldwide family

5 members · 3 offices
US1JP2TW2
this patentIP5 & PCTother officessolid = grantedhover for detail · click to open
Members
5
DOCDB simple family 78000911
Offices
3
US · JP
Granted
3 of 5
grant date present
Non-English titles
2
shown as filed, never translated
›IP5 & PCT — 3 members
OfficePublicationKindPublishedFiledStatusTitle
USthis patentUS-D941371-SS118 Jan 202220 Mar 2020grantedProcess shield for a substrate processing chamber
JPJP-1696666-SS11 Oct 202114 Sep 2020grantedno title held
JPJP-1696763-SS11 Oct 202114 Sep 2020grantedno title held
›Other offices — 2 members
OfficePublicationKindPublishedFiledStatusTitle
TWTW-D215400-SS21 Nov 202118 Sep 2020published基板處理腔室的製程護罩zh
TWTW-D215401-SS21 Nov 202118 Sep 2020published基板處理腔室的製程護罩zh

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock