USPatentGranted
B2

Corrector for charged-particle beam aberration and charged-particle beam apparatus

Granted 15 Jun 2010 · no office action yet

Life of the patent

7 dated events
⤢ drag to zoom20082010201220142016201820202022202420262028ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

In a charged-particle beam apparatus having a high-accuracy and high-resolution focusing optical system for charged-particle beam, a group of coils are arranged along a beam emission axis to extend through the contour of radial planes each radiating from the beam emission axis representing a rotary axis and each having a circular arc which subtends a divisional angle resulting from division of a circumferential plane by a natural number larger than 2 so that a superposed magnetic field may be generated on the incident axis of the charged-particle beam and the trajectory of the charged-particle beam may be controlled by the superposed magnetic field.

Claims

11 · 2 independent · depth 2
1234567891011
11 granted claims

Classifications

9 codes
IPC · International Patent Classification
Section G — Physics
  • G21K1/08
Section H — Electricity
  • H01J3/26
  • H01J49/42
  • H01J3/14
USPC · US Patent Classification
250/396.R250/306250/307250/305250/396.ML

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJul 2008Oct 2008Jan 2009Apr 2009Jul 2009Oct 2009Jan 2010Apr 2010Jul 2010USPTOApplicantNotice of allowanceRequest for continued examination
USPTOApplicanthover for detail · click to open
Pendency
1.9 y
684 days filing → grant
Office actions
0
none on record
Responses
0
1 RCE
Examiner
Jack I Berman
art unit 2881 · TC 2800
Citations: 2 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20090032722 A15 Feb 2009

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock