USPatentGranted
B2

Hierarchical test circuit structure for chips with multiple circuit blocks

Granted 9 Nov 2004 · 8 office actions

Life of the patent

16 dated events
⤢ drag to zoom20002005201020152020ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

A system and method for testing an integrated circuit having internal circuit blocks. Each of the internal circuit blocks may have its own test circuit block, referred to as a socket access port. The integrated circuit preferably includes a chip access port (e.g., an IEEE standard 1149.1 compliant test access port) connected to a set of boundary-scan cells, and connected in a hierarchical fashion to the lower-level test circuit blocks. Each of the lower-level test control circuit blocks preferably comprises a socket access port controller, and test operation is transferred downward and upwards within said hierarchical structure by communicating from a test control circuit block to the test control circuit block at the immediately higher or immediately lower level in the hierarchical structure. Each of the lower-level test control circuit blocks of the hierarchical test control network may be functionally identical. Further, each of the lower-level test control circuit blocks may be structurally identical. An existing boundary scan may be easily modified for use in the hierarchical structure by adding push instructions to send it to a lower-level test circuit block, and pop instructions to return control to the higher level test circuit block.

Classifications

3 codes
IPC · International Patent Classification
Section G — Physics
  • G06F1/750
USPC · US Patent Classification
716/4716/1

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJan 2003Apr 2003Jul 2003Oct 2003Jan 2004Apr 2004Jul 2004Oct 2004Jan 2005USPTOApplicantNon-final rejectionResponse after non-finalRequest for continued examination
USPTOApplicanthover for detail · click to open
Pendency
1.9 y
690 days filing → grant
Office actions
4
non-final + final
Responses
3
2 RCE
Examiner
Vuthe Siek
art unit —
Citations: 28 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

2 priority documents
Priority
18 Jan 2000
earliest claimed
›Priority documents — 2
TypeDocumentDate
provisionalUS 60/176879 0018 Jan 2000
related publicationUS 20030131327 A110 Jul 2003

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock