Description

8 parts
›CROSS-REFERENCE TO RELATED APPLICATION

This application is a 371 of international application of PCT application serial no. PCT/CN2021/128597, filed on Nov. 4, 2021, which claims the priority benefit of China application no. 202011620849.0, filed on Dec. 30, 2020. The entirety of each of the above-mentioned patent applications is hereby incorporated by reference herein and made a part of this specification.

BACKGROUND
›Technical Field

The present invention relates to a train signal control system, and, in particular, to a train operation control system and method based on train-ground coordination.

›Description of Related Art

At present, train operation control systems for railway or urban rail transit, no matter the China train control system (CTCS) for high-speed trains or the communication-based train control (CBTC) system for urban rail transit, are mainly based on a control method including performing train route management on the ground, calculating a movement authority, and sending the movement authority to a train. With this method, train routes are under an extensive ground control, which does not allow fine resource management and sharing and does not take full advantage of resources; then, all resources are managed at a ground level, which increases the complexity in resource management of ground equipment and increases the difficulty in implementation; and in addition, the method for train route management on the ground affects the timeliness of resource management, which is unfavorable for improving the operation efficiency of trains.

›SUMMARY

An object of the present invention is to overcome the defects existing in the above prior art and to provide a train operation control system and method based on train-ground coordination, in order to achieve the safe and efficient control over the operation of trains.

The object of the present invention can be achieved by means of the following technical solutions.

According to one aspect of the present invention, there is provided a train operation control system based on train-ground coordination, including a dispatching center server, a resource management unit (RMU) for ground train control equipment, and on-board train control equipment (CC), wherein the dispatching center server is connected via communication to the on-board CC, and the on-board CC is connected via communication to the RMU for the ground train control equipment; and

the RMU for the ground train control equipment and the on-board CC coordinatively complete resource management and implement train operation control, wherein the resource management is divided into two levels, at a first level, the RMU is responsible for performing the resource management in the unit of section, and at a second level, a preceding train and a succeeding train interact with each other via direct train-to-train communication, such that finer resource sharing in a section is achieved between the trains.

As a preferred technical solution, the dispatching center server is responsible for supervising and controlling train operation and has functions of train operation tracking, alarming and event reporting, operation plan adjusting, and operation controlling.

As a preferred technical solution, the RMU for the ground train control equipment is responsible for allocating and recovering line resources and turnout resources and for turnout locking and unlocking management.

As a preferred technical solution, the line resources are in the unit of track circuit or virtual track circuit.

As a preferred technical solution, the on-board CC is responsible for applying, using, and releasing the line resources and the turnout resources, for locking and unlocking turnouts, and for performing train-to-train communication with the preceding and succeeding trains to implement resource sharing.

As a preferred technical solution, the resource sharing between the on-board CC and the preceding and succeeding trains is completed by fine management of the line resources and the turnout resources.

As a preferred technical solution, with respect to section resources and the turnout resources, the preceding and succeeding trains directly perform position information interaction and mutual negotiation to subdivide an application range of the resources.

As a preferred technical solution, the turnout resources are specifically subdivided as follows:

dividing resources of a turnout P 1 into a P 1 -pre-turnout zone, a P 1 -turnout movable zone, a P 1 -forward side defense zone, a P 1 -reverse side defense zone, a P 1 -forward post-turnout zone, and a P 1 -reverse post-turnout zone.

As a preferred technical solution, the subdivided resources are specifically managed as follows:

a) each subdivided zone is the smallest unit for train occupancy and clearance, can be occupied by one train each time, and can be occupied by another train after train clearance; b) the P 1 -forward side defense zone and the P 1 -reverse side defense zone are mutually exclusive in terms of occupancy, and only one of the two can be occupied each time; and c) the P 1 -turnout movable zone can be unlocked by a train originally applying for locking and can be applied and operated by an additional train, as long as the P 1 -turnout movable zone is not occupied.

According to another aspect of the present invention, there is provided a method for controlling the train operation control system based on train-ground coordination as defined. The method includes the following steps:

1) first, managing, by the RMU for the ground train control equipment, the line resources and the turnout resources by section; 2) then, performing communication between on-board CC of adjacent trains, and performing fine management on resources in a section to implement resource sharing between the trains; and 3) finally, actively performing train control by the on-board CC according to the allocated resources to fulfill a train safety protection function and an automatic train driving function.

Compared with the prior art, the present invention has the following advantages:

1) the present invention realizes the full utilization of line resources, turnout resources and the like by performing hierarchical management and fine processing on the line resources and by sharing the resources based on train-to-train communication, which improves the passing capacity of lines while improving the utilization rate of resources; 2) the present invention reduces the time of information flow and system response on the basis of resource coordination based on train-to-train communication, autonomous train location and autonomous train control, which improves system effectiveness; 3) the resource management method based on train-ground coordination of the present invention simplifies the interface and communication between the trains and the ground train control equipment, which can reduce ground trackside equipment, making the system simpler; 4) the train-ground coordination of the present invention can maximize the compatibility with the existing train operation control methods to achieve the compatibility between the high-efficiency train control system based on train-to-train communication and existing control modes, and also supports a corresponding backup mode; and 5) the present invention has universality and is applicable to railway and urban rail transit, providing the foundation for a unified control method in the future.

›BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a schematic diagram of an overall architecture of a train operation control system based on train-ground coordination according to the present invention;

FIG. 2 is a schematic diagram of subdivided resources of a turnout P 1 according to the present invention; and

FIG. 3 is a schematic diagram showing operation tracking of two trains according to the present invention.

›DESCRIPTION OF THE EMBODIMENTS

The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the embodiments described are some instead of all of the embodiments of the present invention. Based on the embodiments in the present invention, every other embodiment obtained by those of ordinary skills in the art without creative labor shall fall within the protection scope of the present invention.

The train operation control system based on train-ground coordination includes the followings.

1. In this train operation control system, a resource management unit (RMU) for ground train control equipment and on-board train control equipment (CC) coordinatively complete resource management and implement train operation control. The resource management is divided into two levels. At a first level, the RMU is responsible for performing the resource management in the unit of section, and at a second level, a preceding train and a succeeding train interact with each other via direct train-to-train communication, such that finer resource sharing in a section is achieved between the trains.

2. The RMU is responsible for allocating and recovering line resources (which may be in the unit of track circuit or virtual track circuit) and turnout resources, and also for turnout locking and unlocking management.

The CC is responsible for applying, using, and releasing the line resources and the turnout resources, for locking and unlocking turnouts, and for performing train-to-train communication with the preceding and succeeding trains to implement resource sharing.

4. The resource sharing between the CC and the preceding and succeeding trains is completed by fine management of the lien resources and the turnout resources. With respect to section resources and the turnout resources, the preceding and succeeding trains directly perform position information interaction and mutual negotiation to subdivide an application range of the resources.

5. A train control method based on train-ground coordination is applicable to railway or urban rail transit, showing universality.

›Description of the Embodiments

The structure and interface information of the train operation control system based on train-ground coordination are shown in FIG. 1 . The system includes a dispatching center, a resource management unit (RMU) for ground train control equipment, and on-board train control equipment (CC). The dispatching center is responsible for supervising and controlling train operation, and has functions such as train operation tracking, alarming and event reporting, operation plan adjusting, and operation controlling. The RMU is responsible for allocating and recovering line resources and turnout resources and for acquiring information from and driving trackside equipment. The CC is responsible for requesting and releasing the line resources according to a plan, communicating with adjacent trains for resource sharing, and actively performing train control according to the allocated resources to fulfill a train safety protection function and an automatic train driving function.

In the train operation control system based on grain-ground coordination, the management of turnout resources is fined (as shown in FIG. 2 ). The resources of a turnout P 1 into a P 1 -pre-turnout zone, a P 1 -turnout movable zone, a P 1 -forward side defense zone, a P 1 -reverse side defense zone, a P 1 -forward post-turnout zone, and a P 1 -reverse post-turnout zone. The subdivided resources are management under the following rules:

1) each subdivided zone is the smallest unit for train occupancy and clearance, can be occupied by one train each time, and can be occupied by another train after train clearance; 2) the P 1 -forward side defense zone and the P 1 -reverse side defense zone are mutually exclusive in terms of occupancy, and only one of the two can be occupied each time; and 3) the P 1 -turnout movable zone can be unlocked by a train originally applying for locking and can be applied and operated by an additional train, as long as the P 1 -turnout movable zone is not occupied.

Referring to FIG. 3 , it shows a practical application example, in which a train 1 reaches a trackway 3 via the turnout P 1 and stops, a train 2 passes a trackway I via the turnout P 1 , and a following distance between the two trains is short, possibly leading to moving block. The instantaneous situation in the figure is as follows: the train 1 has crossed the P 1 -reverse side defense zone and is heading to stop at the trackway 3 ; and the train 2 occupies track circuits J 1 and J 2 , the turnout P 1 has been locked at a normal position, a receiving route of the train 2 has been prepared, and the train 2 is planned to pass via the trackway I. In FIG. 3 , the resources of interest mainly include: G-J 1 , G-J 2 , G-P 1 , G-I and G- 3 .

Table 1 shows the examples of resource management in respective steps during the operation of the trains 1 and 2 . The main situation is as follows.

In step 1 , the train 1 is located on the track G-J 2 , with the turnout P 1 locked at a reverse position and a receiving signal X cleared; and the train 2 approaches a track G-J 1 .

In step 2 , the train 1 occupies G-J 2 and G-P 1 ; and the train 2 occupies the track G-J 1 .

In step 3 , the train 1 is cleared from the track G-J 2 and occupies G-P 1 to cross the movable zone of the turnout P 1 ; and the train 2 occupies the track circuits G-J 1 and G-J 2 .

In step 4 , the train 1 occupies G-P 1 to cross the reverse side defense region of the turnout P 1 ; and the train 2 occupies G-J 1 and G-J 2 , with its receiving signal X cleared.

In step 5 , the train 1 occupies G- 3 ; and the train 2 occupies G-J 2 and G-P 1 , as well as the normal position of the turnout P 1 .

The resource management in step 4 (as shown in FIG. 3 correspondingly) is described as follows.

A. Resource Management at RMU

The RMU maintains the allocation of the resources G-P 1 and G- 3 to on-board CC 1 , and maintains the allocation of G-J 1 and G-J 2 to the on-board CC 2 , and the on-board CC 1 maintains the allowance of sharing G-P 1 with the on-board CC 2 ; G-P 1 is occupied by the on-board CC 1 , and G-J 1 and G-J 2 are occupied by the on-board CC 2 ; and the turnout P 1 is locked at the normal position by the on-board CC 2 .

B. Resource Management at On-Board CC 1

The on-board CC 1 is cleared from the P 1 -reverse side defense zone, and occupies the P 1 -reverse post-turnout zone; the on-board CC 1 releases the P 1 -reverse side defense zone; and the on-board CC 1 allows sharing the track G-P 1 with the on-board CC 2 .

C. Resource Management at On-Board CC 2

The on-board CC 2 obtains the allocation of and occupies G-J 1 and G-J 2 , and obtains the allowance of sharing G-P 1 from the on-board CC 1 ; and the turnout P 1 is locked to the normal position by the RMU.

In the case of step 4 , the resource management at the RMU, on-board CC 1 , and on-board CC 2 is shown Table 2, Table 3, and Table 4.

Table 1 is a table showing the processing steps of resource management of the train operation control system based on train-ground coordination.

Table 2 is a resource management list of RMU.

Table 3 is a resource sharing list of CC 1 .

Table 4 is a resource sharing list of CC 2 .

Based on the analysis of resource management, the train operation control system based on train-ground coordination performs hierarchical management on the line resources and turnout resources. First, the RMU manages the line resources and turnout resources by section, adjacent trains then communicate with each other, and fine management is performed on resources in the section to achieve resource sharing between the trains, which makes the best of the line resources and turnout resources and improves the passing capacity of the lines.

The above description only provides the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. A variety of equivalent modifications or substitutions readily conceivable to a person skilled in the art within the technical scope disclosed by the present invention should be included within the protection scope of the present invention. Therefore, the protection scope of the present invention should be subjected to the protection scope of the claims.

›Tables in the description — 4
TABLE 1 — System resource management Resource
Train positionResource managementResource management at on-management at
descriptionat RMUboard CC 1on-board CC 2
StepThe train 1 isThe RMU maintains theThe on-board CC 1 obtains theThe on-board CC 2
1located on theallocation of the resources G-J2,allocation of G-J2 from the RMUobtains the
track G-J2,G-P1, and G-3 to the on-boardand occupies the G-J2; the on-allocation of the
with the turnoutCC 1, with G-J2 occupied by theboard CC 1 obtains thetrack G-J1 from the
P1 locked aton-board CC 1; the turnout P1 isallocation of the turnout P1-pre-RMU
the reverselocked by the on-board CC 1 atturnout zone, the P1-turnout
position and athe reverse position; and themovable zone, the P1-reverse
receivingRMU maintains the allocation ofside defense zone, and the P1-
signal XG-J1 to the on-board CC 2reverse post-turnout zone; the
cleared; andturnout P1 is locked to the
the train 2reverse position by means of
approachesthe RMU; and the on-board CC
the track G-J11 obtains the allocation of G-3
StepThe train 1The RMU maintains theThe on-board CC 1 obtains theThe on-board CC 2
2occupies G-J2allocation of the resources G-J2,allocation of and occupies G-J2obtains the
and G-P1; andG-P1, and G-3 to the on-boardand the pre-turnout zone of theallocation of and
the train 2CC 1, and maintains theturnout P1, and obtains theoccupies the track
occupies theallocation of G-J1 to the on-boardallocation of the P1-turnoutG-J1, and obtains
track G-J1CC 2; and the on-board CC 1movable zone, the P1-reversethe allowance of
allows sharing G-J2 with the on-side defense zone, the P1-sharing teh track
board CC 2; G-J2 and G-P1 arereverse post-turnout zone, andG-J2 with the on-
occupied by the on-board CC 1,G-3; the turnout P1 is locked atboard CC 1
and G-J1 is occupied by the on-the reverse position by by
board CC 2; and the turnout P1 ismeans of the RMU; and the on-
locked at the reverse position byboard CC 1 allows the sharing
the on-board CC 1of G-J2 with the on-board CC 2
StepThe train 1 isThe RMU maintains theThe on-board CC 1 is clearedThe on-board CC 2
3cleared fromallocation of the resources G-P1from G-J2, then from the pre-obtains the
the track G-J2and G-3 to the on-board CC 1,turnout zone of the turnout P1allocation of and
and occupiesand maintains the allocation of G-and the P1-turnout movableoccupies the
G-P1 to crossJ1 to the on-board CC 2; G-J2 iszone, occupies the P1-reversetracks G-J1 and G-
the movablehanded over to the on-board CCside defense zone and the P1-J2, and obtains the
zone of the2 from the on-board CC 1; the on-reverse post-turnout zone, andallowance of
turnout P1; andboard CC 1 allows sharing G-P1obtains the allocation of G-3;sharing the track
the train 2with the on-board CC 2; G-P1 isthe on-board CC 1 unlocks theG-P1 from the on-
occupies theoccupied by the on-board CC 1,turnout P1 by means of theboard CC 1; and
track circuitsand G-J1 and G-J2 are occupiedRMU and releases the turnoutthe on-board CC1
G-J1 and G-J2by the on-board CC 2; and themovable zone; and the on-shifts the turnout
turnout P1 is at the reverseboard CC 1 allows sharing theP1 to the normal
position without being lockedtrack G-P1 with the on-boardposition by means
CC 2of the RMU
StepThe train 1The RMU maintains theThe on-board CC 1 is clearedThe on-board CC 2
4occupies G-P1allocation of the resources G-P1from the P1-reverse sideobtains the
to cross theand G-3 to the on-board CC 1,defense zone, occupies the P1-allocation of and
reverse sideand maintains the allocation of G-reverse post-turnout zone, andoccupies G-J1 and
defense regionJ1 and G-J2 to the on-board CCobtains the allocation of G-3;G-J2, and obtains
of the turnout2, and the on-board CC 1the on-board CC 1 releases thethe allowance of
P1; and themaintains the allowance ofP1-reverse side defense zone;sharing G-P1 from
train 2sharing G-P1 with the on-boardand the on-board CC 1 allowsthe on-board CC 1;
occupies G-J1CC 2; G-P1 is occupied by the on-sharing the track G-P1 with theand the turnout P1
and G-J2, withboard CC 1, and G-J1 and G-J2on-board CC 2is locked to the
its receivingare occupied by the on-board CCnormal position by
signal X2; and the turnout P1 is locked atthe means of the
clearedthe normal position by the on-RMU
board CC 2
StepThe train 1The RMU maintains theThe on-board CC 1 is clearedThe on-board CC 2
5occupies G-3;allocation of the resource G-3 tofrom the P1-reverse post-obtains the
and the train 2the on-board CC 1, and maintainsturnout zone, hands over G-P1allocation of and
occupies G-J2the allocation of G-J2 to the on-to the on-board CC 2, andoccupies G-P1 and
and G-P1, asboard CC 2, and the allocation ofmaintains the allocation of andthe P1-pre-turnout
well as theG-P1 to the on-board CC 1; G-3occupies the obtained G-3zone, and obtains
normal positionis occupied by the on-board CCthe allocation of
of the turnout1, and G-J2 and G-P1 areand occupies G-
P1.occupied by the on-board CC 2;J2; and the turnout
and the turnout P1 is locked at theP1 is locked to the
normal position by the on-boardnormal position by
CC 2means of the RMU
TABLE 2 — Resource name
G-J1G-J2G-P1
Characteristic1000 m1000 m500 mG-IG-3
parameters (forAllocatedCharacteristicAllocatedCharacteristicAllocatedCharacteristic450 mCharacteristic450 m
Resourceexample, length)andparametersandparametersandparametersallocatedparametersallocated
stateStateoccupiedStateoccupiedStateoccupiedStateand idleStateand idle
UserCC2UserCC2UserCC1UserCC2UserCC1
Shared or notNOShared or notNOShared or notYESShared or notNOShared or notNO
SharerNoneSharerNoneSharerCC2SharerNoneSharerNone
TurnoutNormal
positionposition
Locked or notYES
TABLE 3 — Resource name G-P1 Tracking
Basic stateconditionShunting condition
Re-AllocatedCurrent400P1-pre-P1-turnoutP1-forward
sourceandtrainmturnoutmovableside defense
stateStateoccupiedregionaheadzonezonezone
Suc-ShuntingSharedNOLength100Length12Length
ceedingor notmm
train
tracking
and
shunting
TurnoutNormalSharerNoneOccu-NOOccu-NOOccu-
positionpositionpiedpiedpied
or notor notor not
LockedYESSuc-NoneOccu-NoneOccu-NoneOccu-
or notceedingpierpierpier
train
region
Con-CC2SharedYESSharedYESShared
trollerororor
notnotnot
SharerCC2SharerCC2Sharer
Resource name
G-3
allocated
G-P1and
Shunting conditionStateidle
Re-P1-forwardP1-reverseP1-forwardP1-reverseCurrent450
sourceside defenseside defensepost-turnoutpost-turnouttrainmm in
statezonezonezonezoneregiontotal
48Length48Length340Length340SharedNO
mmmmor not
NOOccu-NOOccu-NOOccu-YESSharerNone
piedpiedpied
or notor notor not
NoneOccu-NoneOccu-NoneOccu-CC1Suc-None
pierpierpierceeding
train
region
YESSharedNOSharedYESSharedNO
ororor
notnotnot
CC2SharerNoneSharerCC2SharerNone
TABLE 4 — Resource name G-T2
G-T1Allocated
AllocatedandG-P1
andoccupiedTracking
StateoccupiedState1000Basic stateconditionShunting condition
Re-Current200CurrentmmSharedCurrent400P1-turnout
sourcetrainmtraininandtrainmP1-pre-turnmovable
stateregionaheadregiontotalStateoccupiedregionaheadout zonezone
SharedNOSharedNOSucceedingShuntingSharedNOLength100Length
orortrainorm
notnottrackingnot
SharerNoneSharerNoneTurnoutNormalSharerNoneOccupiedNOOccupied
positionpositionor notor not
SucceedingNoneSucceedingNoneLockedYESSucceedingNoneOccupierNoneOccupier
traintrainortrain
regionregionnotregion
ControlerCC2SharedYESShared
oror
notnot
SharerCC2Sharer
Resource name
G-I
allocated
G-P1and
Shunting conditionidle
P1-forwardP1-reverseState450
Re-P1-turnoutsidesideCurrentmm
sourcemovabledefensedefenseP1-forwardP1-reversetrainin
statezonezonezonepost-turnout zonepost-turnout zoneregiontotal
12Length48Length48Length340Length340SharedNO
mmmmmor
not
NOOccupiedNOOccupiedNOOccupiedNOOccupiedSharerNone
or notor notor notor not
NoneOccupierNoneOccupierNoneOccupierNoneOccupierCC1SucceedingNone
train
region
YESSharedYESSharedNOSharedYESSharedNO
orororor
notnotnotnot
CC2SharerCC2SharerNoneSharerCC2SharerNone

Claims as granted

7 claims

Log in to read the claims of this application.

Log in to unlock

Classifications

6 codes
IPC · International Patent Classification
Section B — Performing operations; transporting
  • B61L27/70
  • B61L27/40
  • B61L27/10
  • B61L25/02
  • B61L15/00
  • B61L27/20

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this application are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJan 2022Jul 2022Jan 2023Jul 2023Jan 2024Jul 2024Jan 2025Jul 2025Jan 2026USPTOApplicantNon-final rejection
USPTOApplicanthover for detail · click to open
Pendency
4.3 y
1,566 days filing → grant
Office actions
1
non-final + final
Responses
1
no RCE
Examiner
Zachary L Kuhfuss
art unit 3615 · TC 3600
Citations: 11 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Documents

Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.

Log in to unlock

Chain of title

No assignments have been recorded for this application yet.