USPatent applicationPatented

Active startup timing control at fault mode

Granted 25 Sep 2018 · 1 office action

Current assignee: Dialog Semiconductor GmbH (Renesas ) · originally Renesas Electronics Corporation

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Mingsheng Peng, Pengju Kong, Kai-Wen Chin, Guang Feng · Examiner: Harry Behm · AU 2838 · TC 2800

Life of the application

11 dated events
⤢ drag to zoom20182020202220242026202820302032203420362038ProsecutionOwnershipTerm & fees
ProsecutionOwnershipTerm & feeshover for detail · click to open

Abstract

A power switch transistor for a switching power converter is maintained on during a re-startup period by a zener breakdown voltage following a fault condition for the switching power converter. A source voltage from the power switch transistor is used to charge a VCC capacitor that stores a power supply voltage for a controller for the switching power converter.

Description

7 parts
›CROSS-REFERENCE TO RELATED APPLICATIONS

This application claims priority to and the benefit of U.S. Provisional Patent Application No. 62/446,344, filed Jan. 13, 2017, which is hereby incorporated by reference in its entirety.

›TECHNICAL FIELD

This application relates to switching power converter controllers, and more particularly to switching power converter controllers with active startup timing control.

›BACKGROUND

The high efficiency of switching power converters such as a flyback converter has led to their virtual universal adaption as the battery charger for mobile devices. Since a flyback converter converts AC household voltage, fault conditions such a short circuit may be potentially dangerous. It is thus conventional for a flyback converter controller to monitor for various fault conditions. Should the controller detect the presence of a fault condition, it stops cycling the power switch and enters a re-startup period. Upon the conclusion of the re-startup period, the controller will again resume normal operation. Should the fault condition reoccur, the controller will again stop cycling the power switch and begin another startup period. The duration of the startup period is thus rather important since if the fault is permanent, it will continually reoccur following each startup period. Should the startup period be too short in the presence of an output short circuit fault condition, the components of the flyback converter may be stressed or damaged by the heat and excessive currents resulting from such a repeated fault.

The duration of the re-startup period is thus essential to minimize power loss and avoid stress to switching power converter components following a fault condition. The re-startup period cannot be too short as discussed above. Conversely, the re-startup period should not be too long or it may exceed user requirements. However, conventional control of the re-startup period suffers from a number of flaws that may be better appreciated with reference to a conventional prior art switching power converter as illustrated in FIG. 1 . A controller U 1 controls the cycling of a power switch transistor S 2 that is in series with a primary winding T 1 of the flyback converter's transformer (not illustrated). Depending upon the load demands, controller U 1 will switch on power switch transistor S 2 through a drive signal applied to its gate. Power switch transistor S 2 is in series with a current sense resistor R 2 so that controller U 1 may measure the primary winding current by sensing the voltage across the current sense resistor. An input voltage V_IN such as produced by rectification of an AC mains voltage drives the primary winding current when the power switch transistor S 2 is cycled on.

Controller U 1 receives its power supply voltage VCC from a VCC capacitor coupled between a source of a power supply voltage regulator switch transistor S 1 and ground. The drain of power supply voltage regulator switch transistor S 1 couples through a current limiting resistor R 1 to the input voltage rail supplying the input voltage. When controller U 1 cycles power supply voltage regulator switch transistor S 1 on, the input voltage induces a current through current limiting resistor R 1 and power supply voltage regulator switch transistor S 1 to charge the VCC capacitor with the power supply voltage VCC. Should controller U 1 have to re-start due to a fault condition, controller U 1 manages the duration of the re-startup period through cycles of switching off and on power supply voltage regulator switch transistor S 1 . Each off and on cycle may be designated as a VCC recycling period since charge on the VCC capacitor is “recycled” as the power supply voltage VCC is drained to power controller U 1 . Some waveforms for the resulting re-startup period are shown in FIG. 2 .

At the occurrence of the fault condition, controller U 1 enters an initial or first VCC recycling period with the power supply voltage regulator switch transistor S 1 off. During an initial portion of the VCC recycling period, controller U 1 operates in an active mode such that it draws a relatively large current (Icc_high) from the VCC capacitor. The power supply voltage VCC thus drops relatively rapidly until it hits a threshold value Vcc_low. Controller U 1 monitors the power supply voltage VCC to determine whether it has decreased to the Vcc_low threshold voltage, whereupon the controller cycles the power supply voltage regulator switch transistor S 1 on. The power supply voltage VCC then begins to increase until it reaches a maximum value Vcc_st at which point controller U 1 switches off power supply voltage regulator switch transistor S 1 . While the power supply voltage regulator switch transistor S 1 is on, controller U 1 functions in a dormant or sleep mode such that it draws virtually no current from the VCC capacitor.

Controller U 1 repeats the VCC recycling period a total of N times to complete the desired re-startup period. Upon the conclusion of the re-startup period, controller U 1 resumes normal operation. Re-startup timing control is thus implemented by controlling the number of the VCC recycling periods. In these conventional recycling periods, the duration of each recycling period is dominated by the charging of the VCC capacitor while the power supply voltage increases from Vcc_low to Vcc_st. This VCC charging time is controlled by the resistance of the current limiting resistor R 1 . This reliance on the current limiting resistor R 1 to lengthen the charging time of the VCC capacitor makes the duration of the VCC recycling periods dependent on the input voltage V_IN. For example, when V_IN exceeds its rated voltage, the magnitude of the charging current charging the VCC capacitor increases which results in a shorter VCC recycling period. In turn, this results in a shortened re-startup period. Conversely, a decrease in the input voltage lengthens the duration of the recycling periods and the re-startup period. The prior art dependence on variations in V_IN is thus problematic in that the re-startup timing cannot be accurately predicted.

Accordingly, there is a need in the art for improved re-startup timing control techniques for switching power converters.

›SUMMARY

To address the need in the art for an improved re-startup timing control, a controller is provided that actively controls a re-startup period following a fault condition by implementing a slow VCC discharge time that is independent of the input voltage to dominate the VCC recycling period. In this fashion, a reliable active re-startup timing control is possible regardless of the range of the input voltage. A reasonable and accurate re-startup period is thus achieved following a fault condition, which prevents switching power converter overstress. The slow VCC discharge period advantageously prevents an undesirable dependence on the input voltage with regard to controlling the duration of the re-startup period. These advantageous features may be better appreciated through a consideration of the following detailed description.

›BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a diagram for a conventional switching power converter configured for startup timing control in accordance with an embodiment of the disclosure.

FIG. 2 illustrates waveforms for a conventional switching power converter with startup timing control in accordance with an embodiment of the disclosure.

FIG. 3 is a diagram for a switching power converter configured for active startup timing control in accordance with an embodiment of the disclosure.

FIG. 4 illustrates waveforms for a switching power converter configured for active startup timing control in accordance with an embodiment of the disclosure.

Embodiments of the present disclosure and their advantages are best understood by referring to the detailed description that follows. It should be appreciated that like reference numerals are used to identify like elements illustrated in one or more of the figures.

›DETAILED DESCRIPTION · 1 of 2

The following discussion will be directed to a flyback converter. However, it will be appreciated that the improved re-startup period disclosed herein may be implemented in other types of switching power converters such as a buck converter, a boost converter, or a buck-boost converter. An example flyback converter 300 configured for a re-startup period that is independent of the input voltage is shown in FIG. 3 . As known in the flyback converter arts, flyback converter 300 includes a power switch transistor S 2 in series with the primary winding of a transformer T 1 and a controller U 1 configured to control the on state and the off state of power transistor switch S 2 . During normal operations, controller U 1 may maintain the output regulation of an output voltage for flyback converter 300 (for illustration brevity, the secondary side of the transformer is not illustrated in FIG. 3 ) by controlling the on and off states of power switch transistor S 2 through a drive terminal of controller U 1 coupled to a gate of power switch transistor S 2 . The primary winding has a number Np of coils. Power switch transistor S 2 may be a field-effect transistor (FET) device (e.g., a metal oxide field-effect transistor (MOSFET) device), a bipolar junction transistor (BJT) device, or other appropriate switch transistor. During normal operation, when power switch transistor S 2 is placed in the on state, an input voltage V_IN carried on an input voltage rail drives a magnetizing current or primary current into the primary winding of transformer T 1 . Based upon the input voltage and a magnetizing inductance for transformer T 1 , the primary current ramps up from zero Amperes (Amps) to a peak current value, whereupon controller U 1 turns off power switch transistor S 2 to complete a power cycle.

Controller U 1 further includes a timer 314 . A voltage control module 312 may comprise logic gates or a microcontroller. Timer 314 may comprise analog or digital circuitry. In additional embodiments, voltage control module 312 and timer 314 may be implemented using a combination of hardware, software, and/or firmware components.

At the detection of a fault condition such as an output short, controller U 1 enters into a re-startup period. The re-startup period comprises a series of recycling periods in which voltage control module 312 cycles on and off a power supply voltage switch transistor S 3 to regulate a power supply voltage VCC stored on a VCC capacitor 316 . Power supply voltage switch transistor S 3 couples between a source of power switch transistor S 2 and a current limiting resistor R 3 . A cathode of a zener diode Z 1 connects to a gate of power switch transistor S 2 whereas an anode of zener diode Z 1 connects to ground. The gate of power switch transistor S 2 couples to the input voltage rail through a resistor R 4 . In some embodiments, zener diode Z 1 may have a zener breakdown value of fifteen volts DC. The input voltage will typically be higher than such a value such that the gate of power switch transistor S 2 will be charged to the zener breakdown voltage during the re-startup period. Should the power supply voltage switch transistor S 3 be cycled on, the source of power switch transistor S 2 will be lower than the zener breakdown voltage by the threshold voltage for power switch transistor S 2 since power switch transistor S 2 will be switched on due to the charging of its gate by the zener breakdown voltage. Advantageously, the source voltage of power switch transistor S 2 is thus independent of variations in the input voltage but instead is determined by the zener breakdown voltage and the threshold voltage. Since the source voltage is what powers the charging of the VCC capacitor, the resulting charging of the power supply voltage VCC in each recycling period is independent of the input voltage.

During normal operation, the source of power switch transistor S 2 couples to ground through a switch transistor S 4 and a resistor R 5 . In response to a fault condition, switch transistor S 4 is cycled off. Switch transistor S 4 would then be cycled back on upon the conclusion of the re-startup period so that normal operation may proceed.

When power supply voltage switch transistor S 3 is closed, the source voltage at power switch transistor S 2 will cause charge to flow through the current limiting resistor R 3 into the VCC capacitor to charge the power supply voltage VCC stored across the VCC capacitor. As will be explained further herein, a slow discharge period will dominate each recycling period. The resistance of current limiting resistor R 3 may thus be relatively small such that the VCC capacitor charges relatively quickly to the high threshold voltage Vcc_st. In addition, controller U 1 is configured to enter a sleep mode such as to draw virtually no current while power supply voltage switch transistor S 3 is closed. The charging period during which power supply voltage switch transistor S 3 is closed is thus quite short since the small resistance of current limiting resistor R 3 will cause a relatively large amount of charge to flow into the VCC capacitor to charge the power supply voltage VCC from the low threshold voltage Vcc_low to the high threshold voltage Vcc_st. The recycling periods are thus dominated by the slow discharge times as measured by timer 314 . Since the charging time of the power supply VCC during each recycling period is independent of the input voltage, each recycling period is controlled by timer 314 as will be explained further herein.

The operation of flyback converter 300 during the re-startup period may be better understood with consideration of the waveforms shown in FIG. 4 . During normal operation, voltage control module 312 places power supply voltage switch transistor S 3 in the OFF state. VCC capacitor 316 is fully charged to the high threshold level Vcc_st and an Icc loading current drawn by controller U 1 equals a high level Icc_high during normal operation of controller U 1 .

›DETAILED DESCRIPTION · 2 of 2

Following a detection of a fault condition, timer 314 begins timing a slow VCC discharge period in a first recycling period while voltage control module 312 turns off power supply voltage switch transistor S 3 . At the same time, controller U 1 enters a low-power timing mode that merely supports the timing of the slow discharge period through timer 314 . The Icc current drawn by controller U 1 during the slow discharge period is thus reduced to Icc_low during the slow VCC discharge period. Advantageously, the timing of the slow VCC discharge period is plainly independent of the input voltage. At the completion of the slow VCC discharge period as timed by timer 314 , controller U 1 reverts to normal operation and thus begins to draw a relatively large power supply current (Icc_high) during a fast discharge period. This causes the power supply voltage VCC to rapidly discharge to below the low voltage threshold Vcc_low (which may also be denoted as a minimum threshold voltage), whereupon voltage control module 312 switches on power supply voltage switch transistor S 3 . The power supply voltage then rapidly charges to the high threshold voltage Vcc_st. The recycling period is repeated N times (N being a plural integer) to complete the re-startup period. The rapid charging and discharging times in each recycling period are thus insignificant compared to the slow discharge period such that the re-startup period is dominated by the N slow discharge periods. Since the slow discharge periods are independent of the input voltage, the duration of the re-startup period is reliably controlled despite variations in the input voltage. Normal operation may then ensue following completion of the re-startup period.

A method of operation for controlling the duration of the re-startup period will now be discussed. The method includes an act of responding to a fault condition by stopping normal operation of a power switch transistor and beginning the re-startup period, wherein the re-startup period extends over a plurality of recycling periods. The initiation of the recycling periods discussed with regard to FIG. 4 is an example of this act. The method also includes an act in each recycling period of charging a gate of a power switch transistor with a zener breakdown voltage to produce a source voltage at a source terminal for the power switch transistor. The production of the source voltage for power switch transistor S 2 in an example of this act. The method also includes an act in each recycling period of, during a discharge period, discharging a power supply voltage stored across a VCC capacitor; and charging the VCC capacitor using the source voltage responsive to the power supply voltage dropping below a minimum threshold voltage at an end of the discharge period. The slow discharge period and subsequent fast discharge period for each recycling period is an example of the discharging act. Finally, the switching on of power supply voltage switch transistor S 3 is an example of the charging act.

As those of some skill in this art will by now appreciate and depending on the particular application at hand, many modifications, substitutions and variations can be made in and to the materials, apparatus, configurations and methods of use of the devices of the present disclosure without departing from the scope thereof. For example, the discussion above was with regard to a flyback converter but it will be appreciated that the re-startup period disclosed herein may be implemented in other switching power converters such as a buck converter, a boost converter, or a buck-boost converter. In light of this, the scope of the present disclosure should not be limited to that of the particular embodiments illustrated and described herein, as they are merely by way of some examples thereof, but rather, should be fully commensurate with that of the claims appended hereafter and their functional equivalents.

Claims as granted

18 claims

Log in to read the claims of this application.

Log in to unlock

Classifications

3 codes
IPC · International Patent Classification
Section H — Electricity
  • H02M1/32
  • H02M1/36
  • H02M3/335

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this application are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJul 2017Oct 2017Jan 2018Apr 2018Jul 2018Oct 2018USPTOApplicantNon-final rejectionNotice of allowance
USPTOApplicanthover for detail · click to open
Pendency
1.1 y
399 days filing → grant
Office actions
1
non-final + final
Responses
1
no RCE
Examiner
Harry Behm
art unit 2838 · TC 2800
Citations: 6 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Documents

Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.

Log in to unlock

Chain of title

⤢ drag to zoom20182020202220242026202820302032203420362038Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock