USPatent applicationPatented

PUCCH resource allocation with enhanced PDCCH

Granted 22 Aug 2017 · 2 office actions

Current assignee: Apple Inc. · originally Intel Corporation

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Seunghee Han, Jong-Kae Fwu, Yuan Zhu · Examiner: Afsar M Qureshi · AU 2472 · TC 2400

Life of the application

11 dated events
⤢ drag to zoom20152020202520302035ProsecutionOwnershipTerm & fees
ProsecutionOwnershipTerm & feeshover for detail · click to open

Abstract

Embodiments of the present disclosure include methods, apparatuses, and instructions for receiving at a user equipment (UE) of a third generation partnership project (3GPP) network an offset value selected from a plurality of offset values in downlink control information. The UE also receives one or more enhanced control channel elements (eCCEs) of an enhanced physical downlink control channel (ePDCCH). The UE may then determine an allocation of an uplink resource for a transmission on a physical uplink control channel (PUCCH) based at least in part on the index of a first eCCE and the offset value.

Description

9 parts
›CROSS REFERENCE TO RELATED APPLICATIONS

The present application is a continuation of U.S. patent application Ser. No. 14/257,709, filed Apr. 21, 2014, entitled “PUCCH RESOURCE ALLOCATION WITH ENHANCED PDCCH,” which is a continuation of U.S. patent application Ser. No. 13/673,791, filed Nov. 9, 2012, entitled “PUCCH RESOURCE ALLOCATION WITH ENHANCED PDCCH,” which claims priority to U.S. Provisional Patent Applications No. 61/653,369, filed May 30, 2012, entitled “Advanced Wireless Communication Systems and Techniques,” and No. 61/707,784, filed Sep. 28, 2012, entitled “Advanced Wireless Communication Systems and Techniques.” The entire disclosures of which are hereby incorporated by reference in their entirety.

›FIELD

Embodiments of the present invention relate generally to the technical field of resource allocation in third generation partnership project (3GPP) networks. Specifically, embodiments describe uplink resource allocation when a 3GPP network is sending downlink signals on both a physical downlink control channel (PDCCH) and an enhanced physical downlink control channel (ePDCCH).

›BACKGROUND

The background description provided herein is for the purpose of generally presenting the context of the disclosure. Work of the presently named inventors, to the extent it is described in this background section, as well as aspects of the description that may not otherwise qualify as prior art at the time of filing, are neither expressly nor impliedly admitted as prior art against the present disclosure. Unless otherwise indicated herein, the approaches described in this section are not prior art to the claims in the present disclosure and are not admitted to be prior art by inclusion in this section.

In 3GPP network, the physical uplink control channel (PUCCH) is used to transmit uplink control information (UCI) from a UE to a 3GPP eNodebB (eNB). An example of the UCI information is an acknowledgement signal in a hybrid-ARQ (HARQ) process. Typically, PUCCH resources are dynamically allocated to a mobile station based upon the lowest carrier control element (CCE) index of a signal transmitted on the PDCCH by the eNB using one or more CCEs. Because the PDCCH transmission is unique to a given UE, use of the CCE index would result in the UE being assigned a unique uplink resource on the PUCCH.

However, an ePDCCH using one or more enhanced carrier control elements (eCCEs) has recently been introduced to the 3GPP specifications. The uplink resource of the PUCCH may be based on the lowest eCCE index for one or more eCCEs used for a transmission on the ePDCCH. In certain instances the lowest CCE index and the lowest eCCE index may be the same. In these instances, an uplink resource allocated to a first UE using the lowest CCE index of the PDCCH may be the same as an uplink resource allocated to a second UE using the lowest eCCE index of the ePDCCH, resulting in a resource allocation collision.

›BRIEF DESCRIPTION OF THE DRAWINGS

Embodiments will be readily understood by the following detailed description in conjunction with the accompanying drawings. To facilitate this description, like reference numerals designate like structural elements. Embodiments are illustrated by way of example and not by way of limitation in the figures of the accompanying drawings.

FIG. 1 schematically illustrates a high-level example of a network system comprising a UE and an eNB, in accordance with various embodiments.

FIG. 2 illustrates an exemplary uplink resource index, in accordance with various embodiments.

FIG. 3 illustrates exemplary uplink resource offset values, in accordance with various embodiments.

FIG. 4 illustrates other exemplary uplink resource offset values, in accordance with various embodiments.

FIG. 5 illustrates other exemplary uplink resource offset values, in accordance with various embodiments.

FIG. 6 schematically illustrates an example system that may be used to practice various embodiments described herein.

›DETAILED DESCRIPTION · 1 of 5

Apparatuses, methods, and storage media are described herein for allocating uplink resources. In certain embodiments, uplink resources related to a CCE and information received in a transmission on the PDCCH may be allocated according to a first set of values. Uplink resources related to an eCCE and information received in a transmission on the ePDCCH may be allocated according to a similar set of values with the addition of an offset value. In certain embodiments, for example when UEs are using transmit diversity for PUCCH, it may be desirable for the offset values to be even. In some embodiments, the offset values may be negative. In some embodiments, the offset values may be specifically signaled by the RRC or dictated by the antenna ports that are associated with the ePDCCH transmission. In certain embodiments, the resource allocation may be based at least in part on a starting offset value.

In the following detailed description, reference is made to the accompanying drawings which form a part hereof wherein like numerals designate like parts throughout, and in which is shown by way of illustration embodiments that may be practiced. It is to be understood that other embodiments may be utilized and structural or logical changes may be made without departing from the scope of the present disclosure. Therefore, the following detailed description is not to be taken in a limiting sense, and the scope of embodiments is defined by the appended claims and their equivalents.

Various operations may be described as multiple discrete actions or operations in turn, in a manner that is most helpful in understanding the claimed subject matter. However, the order of description should not be construed as to imply that these operations are necessarily order dependent. In particular, these operations may not be performed in the order of presentation. Operations described may be performed in a different order than the described embodiment. Various additional operations may be performed and/or described operations may be omitted in additional embodiments.

For the purposes of the present disclosure, the phrases “A and/or B” and “A or B” mean (A), (B), or (A and B). For the purposes of the present disclosure, the phrase “A, B, and/or C” means (A), (B), (C), (A and B), (A and C), (B and C), or (A, B and C).

The description may use the phrases “in an embodiment,” or “in embodiments,” which may each refer to one or more of the same or different embodiments. Furthermore, the terms “comprising,” “including,” “having,” and the like, as used with respect to embodiments of the present disclosure, are synonymous.

FIG. 1 schematically illustrates a wireless communication network 100 in accordance with various embodiments. Wireless communication network 100 (hereinafter “network 100 ”) may be an access network of a 3GPP LTE network such as evolved universal terrestrial radio access network (E-UTRAN). The network 100 may include an eNB 105 , configured to wirelessly communicate with a UE 110 .

As shown in FIG. 1 , the UE 110 may include a transceiver module 120 . The transceiver module 120 may be further coupled with one or more of a plurality of antennas 125 of the UE 110 for communicating wirelessly with other components of the network 100 , e.g., eNB 105 . The antennas 125 may be powered by a power amplifier 130 which may be a component of the transceiver module 120 , as shown in FIG. 1 , or may be a separate component of the UE 110 . In one embodiment, the power amplifier 130 provides the power for all transmissions on the antennas 125 . In other embodiments, there may be multiple power amplifiers on the UE 110 . The use of multiple antennas 125 may allow for the UE 110 to use transmit diversity techniques such as spatial orthogonal resource transmit diversity (SORTD). In certain embodiments the transceiver module 120 may contain both transmission and reception circuitry. In other embodiments, the transceiver module 120 may be replaced by transmitting circuitry and receiving circuitry which are separate from one another (not shown). In other embodiments, the transceiver module 120 may be coupled with processing circuitry configured to alter, process, or transform signals or data received from, or sent to, the transceiver module 120 (not shown).

FIG. 2 depicts exemplary CCE/eCCE indices 200 . The exemplary indices include a lowest index #m and sequentially increasing indices #m+1, #m+2 . . . #m+7. As described above, the lowest CCE index of a PDCCH transmission may, in some instances, be the same as the lowest eCCE index of an ePDCCH transmission. For example, the lowest CCE index and the lowest eCCE index may be the same, for example both using index #m+2. If the PUCCH transmissions of a first UE and the PUCCH transmissions of a second UE were scheduled using the CCE/eCCE index #m+2, the transmissions of PUCCHs may conflict due to using the same CCE/eCCE indices.

However, a conflicting transmission may be avoided if an offset value is used for dynamic resource allocation of uplink resources using an eCCE. In some embodiments the offset values may be configured by a radio resource control (RRC) entity of the network 100 , however other entities may configure the offset values in other embodiments. In some embodiments the offset value may be an A/N Resource Indicator (ARI). In other embodiments the offset value may be related to the antenna port used by the eNB 105 to transmit data to the UE 110 on the ePDCCH.

As an example using the offset value, if a UE in a frequency division duplex (FDD) scenario is using transmit diversity for PUCCH such as SORTD, then the PUCCH resources of the UE may be allocated using the CCE index according to: n PUCCH (1,{tilde over (p)} 0 ) =n CCE +N PUCCH (1) and n PUCCH (1,{tilde over (p)} 1 ) =n CCE +1+N PUCCH (1) for antenna ports 0 and 1, respectively, where n PUCCH (1,{tilde over (p)} 0 ) is the PUCCH resource for port 0, n PUCCH (1,{tilde over (p)} 1 ) is the PUCCH resource for port 1, n CCE is the CCE index and N PUCCH (1) is a pre-configured value. In FDD carrier aggregation using PUCCH format 1b with channel selection, a PUCCH resource may be allocated according to N PUCCH,j (1) =n CCE +N PUCCH (1) and another PUCCH resource may be allocated according to N PUCCH,j+1 (1) =n CCE +1+N PUCCH (1) .

›DETAILED DESCRIPTION · 2 of 5

For a time division duplex (TDD) scenario, the resources for antenna ports 0 and 1 may be determined by n PUCCH (1,{tilde over (p)} 0 ) =value+n CCE +N PUCCH (1) and n PUCCH (1,{tilde over (p)} 1 ) =value+n CCE +1+N PUCCH (1) , respectively where value is a value associated with one or more of the specific subframes, a signaled value, a physical downlink shared channel, or a semi-persistent scheduling (SPS) value as described, for example, in 3GPP technical specification 36.213 v 10.5.0 (2012-03).

By contrast, the PUCCH resources of the UE in the FDD scenario may be allocated using the eCCE according to n PUCCH (1,{tilde over (p)} 0 ) =n eCCE +N PUCCH (1,k) +n offset and n PUCCH (1,{tilde over (p)} 1 ) =n eCCE +1+N PUCCH (1,k) +n offset for antenna ports 0 and 1, respectively where N PUCCH (1,k) represents the UE specific starting offset for PUCCH resource for ePDCCH set k. In certain embodiments, there may be 2 ePDCCH sets, so k may be equal to 0 or 1, although in other embodiments there may be more or less ePDCCH sets or k may have some other value for a given ePDCCH set. Further, the PUCCH resources of the UE in the TDD scenario may be allocated using the eCCE according to n PUCCH (1,{tilde over (p)} 0 ) =value+n eCCE +N PUCCH (1,k) +n offset , for antenna port 0 and n PUCCH (1,{tilde over (p)} 1 ) =value+n eCCE +1+N PUCCH (1,k) +n offset , for antenna port 1.

In some embodiments, n offset may be an offset value that is transmitted to the UE via downlink control information (DCI) transmitted on the PDCCH or ePDCCH. As noted above, in some embodiments n offset may be an ARI. Alternatively, the offset value n offset may be an antenna specific offset k p associated with antenna port p, where p is the antenna port allocated to the first CCE of the corresponding ePDCCH. In embodiments utilizing distributed ePDCCH, k p may be equal to zero when p is equal to 107 or 109. In embodiments utilizing localized ePDCCH, k p may be equal to p−107 when p is equal to 107, 108, 109, or 110. In these embodiments, n offset may equal 2·m·k p where m is an integer. In certain embodiments, m may be equal to 1 and therefore n offset =2·k p .

In other embodiments, when using the antenna specific offset k p , n offset may be equal to k p , and the FDD resource allocation may then become n PUCCH (1,{tilde over (p)} 0 ) =n eCCE +N PUCCH (1,k) +k p and n PUCCH (1,{tilde over (p)} 1 ) =n eCCE +1+N PUCCH (1,k) +k p for antenna ports 0 and 1, respectively where N PUCCH (1,k) represents the UE specific starting offset for PUCCH resource for ePDCCH set k, as described above. The TDD resource allocation may likewise become n PUCCH (1,{tilde over (p)} 0 ) =value+n eCCE +N PUCCH (1,k) +k p , and n PUCCH (1,{tilde over (p)} 1 ) =value+n eCCE +1+N PUCCH (1,k) +k p , for antenna ports 0 and 1, respectively.

In certain embodiments, a combination of the n offset values, for example a DCI signaled n offset value associated with ARI and an n offset value associated with an antenna specific offset value such as k p may be used. For ease of understanding the following example, the n offset associated with a DCI-signaled value such as an ARI will be referred to as n ARI . The n offset associated with the antenna port will be referred to as n antenna . It will be understood that n antenna may be equal to values such a k p or a multiplied value of k p such as 2k p or 2mk p as described above.

As an example, for localized ePDCCH transmission, the uplink resources in the (1,k) FDD scenario may be allocated according to n PUCCH (1,{tilde over (p)} 0 ) =n eCCE +N PUCCH (1,k) +n ARI +n antenna and n PUCCH (1,{tilde over (p)} 1 ) =n eCCE +1+N PUCCH (1,k) +n ARI +n antenna for antenna ports 0 and 1, respectively. For distributed ePDCCH transmission, the uplink resources in the FDD scenario may be allocated according to n PUCCH (1,{tilde over (p)} 0 ) =n eCCE +N PUCCH (1,k) +n offset and n PUCCH (1,{tilde over (p)} 1 ) =n eCCE +1+N PUCCH (1,k) +n offset , for antenna ports 0 and 1, respectively.

For localized ePDCCH transmission, the uplink resources in the TDD scenario may be allocated according to n PUCCH (1,{tilde over (p)} 0 ) =n eCCE +N PUCCH (1,k) +n ARI +n antenna and n PUCCH (1,{tilde over (p)} 1 ) =n eCCE +1+N PUCCH (1,k) +n ARI +n antenna for antenna ports 0 and 1, respectively. For distributed ePDCCH transmission, the uplink resources in the TDD scenario may be allocated according to n PUCCH (1,{tilde over (p)} 0 ) =value+n eCCE +N PUCCH (1,k) +n offset and n PUCCH (1,{tilde over (p)} 1 ) =value+n eCCE +1+N PUCCH (1,k) +n offset , for antenna ports 0 and 1, respectively.

In certain embodiments, the RRC configuration N PUCCH,ePDCCH (1) to indicate the starting offset for dynamic resource allocation may be introduced. In this embodiment, N PUCCH,ePDCCH (1) may replace N PUCCH (1) in the above equations for the FDD and TDD resource allocation.

FIG. 3 depicts exemplary n offset values 300 that may be signaled in various embodiments. As discussed above, the n offset values may be signaled via the DCI of the ePDCCH. In some embodiments, the discussed n offset values may be the ARI values discussed above. The exemplary n offset values 300 correspond to a set of values 305 signaled on the DCI.

In FIG. 3 , a first set of n offset values 310 may correspond to the set of values 305 signaled on the DCI in a first embodiment. For example, an n offset of 0, 2, 4, or 6 may correspond to a DCI signal of 00, 01, 10, or 11, respectively. A second set of n offset values 315 may correspond to the set of values 305 signaled on the DCI in a second embodiment. For example, an n offset of −2, 0, 2, or 4 may correspond to a DCI signal of 00, 01, 10, or 11, respectively. A third set of n offset values 320 may correspond to the set of values 305 signaled on the DCI in a third embodiment. For example, an n offset of −4, −2, 0, or 2 may correspond to a DCI signal of 00, 01, 10, or 11, respectively. A fourth set of n offset values 325 may correspond to the set of values 305 signaled on the DCI in a fourth embodiment. For example, an n offset of −6, −4, −2, or 0 may correspond to a DCI signal of 00, 01, 10, or 11, respectively. A fifth set of n offset values 330 may correspond to the set of values 305 signaled on the DCI in a fifth embodiment. For example, an n offset of 0, 2, 6, or 8 may correspond to a DCI signal of 00, 01, 10, or 11, respectively.

›DETAILED DESCRIPTION · 3 of 5

It may be desirable for the n offset to be an even value so that a resource scheduler can consider two different resources for two antenna ports when using a transmit diversity configuration such as SORTD or for FDD carrier aggregation using PUCCH format 1b with channel selection to maximize the likelihood of collision avoidance. As shown above, uplink resource allocation between ports 0 and 1, or uplink resource allocation for PUCCH format 1b with channel selection, may be incremented by a value of 1. In other words, if port 0 uses an uplink resource corresponding to #m+2, then port 1 may use an uplink resource corresponding to #m+3. In this example, the uplink resource allocation corresponding to the eCCE may need to be incremented by an even value so that the uplink resource allocation of port 0 based on the eCCE does not collide with the uplink resource allocation of port 1 based on the CCE. For example, referring to FIG. 2 , if the lowest CCE index is #m+2, and the lowest eCCE index is #m+4, then an n offset value of −1 may produce a collision because both the uplink resource allocation produced using the CCE for port 1 and the uplink resource allocation produced using the eCCE for port 0 may point to the uplink resource corresponding to #m+3. Alternatively, if the lowest CCE index is #m+2 and the lowest eCCE index is #m+2, then an n offset value of 1 may produce a collision because both the uplink resource allocation produced using the CCE for port 1 and the uplink resource allocation produced using the eCCE for port 0 may point to the uplink resource corresponding to #m+3.

As will be recognized, it may be desirable in certain embodiments for at least one of the possible n offset values to be 0 to allow for a neutralization of the n offset value if future standards revisions render the n offset value undesirable or obsolete. However, other n offset value sets may not include an n offset value of 0. In some embodiments, it may be desirable for at least one n offset value to be negative to account for a large aggregation level for previous PDCCHs, i.e. the number of consecutive CCEs used to transmit the previous PDCCHs, although other embodiments may have all positive (or all negative) n offset values. Finally, the n offset values shown in sets 310 , 315 , 320 , 325 , and 330 are merely exemplary and greater or lesser values may be desirable.

Using more or less bits to indicate the n offset value may be desirable to allow greater or lesser degrees of freedom in signaling an n offset value. For example, using 2 bits allows 4 degrees of freedom, however using 3 bits may allow 8 degrees of freedom, and using x bits may allow 2 x degrees of freedom. In some embodiments it may be desirable for the purposes of power savings or signal overhead to use only a single bit to signal the n offset value. In general the DCI bits for the offset can be defined by adding bits to an existing DCI field, or by reusing an existing field in the DCI.

For example, FIG. 4 depicts exemplary n offset values 400 for embodiments where only a single bit is used in the set of values 405 signaled on the DCI. Similarly to FIG. 3 , the discussed n offset values may be the ARI values discussed above. For example, a sixth set of n offset values 410 may correspond to the set of values 405 signaled on the DCI in a sixth embodiment. For example, an n offset of −2 or 0 may correspond to a DCI signal of 0 or 1, respectively. A seventh set of n offset values 415 may correspond to the set of values 405 signaled on the DCI in a seventh embodiment. For example, an n offset of 0 or 2 may correspond to a DCI signal of 0 or 1, respectively.

In some embodiments, the offset values may contain a combination of even and odd values. FIG. 5 depicts exemplary n offset values 500 for embodiments containing a combination of even and odd values. Similarly to FIGS. 3 and 4 , the discussed n offset values may be the ARI values discussed above. In FIG. 5 , an eighth set of n offset values 510 may correspond to the set of values 505 signaled on the DCI in an eighth embodiment. For example, an n offset of −4, −2, 0, or 1 may correspond to a DCI signal of 00, 01, 10, or 11, respectively. A ninth set of n offset values 515 may correspond to the set of values 505 signaled on the DCI in a ninth embodiment. For example, an n offset of −2, 0, 1, or 2 may correspond to a DCI signal of 00, 01, 10, or 11, respectively. A tenth set of n offset values 520 may correspond to the set of values 505 signaled on the DCI in a tenth embodiment. For example, an n offset of −2, −1, 0, or 2 may correspond to a DCI signal of 00, 01, 10, or 11, respectively.

The use of a combination of odd values and even values may be desirable for several reasons. First, a scaling value may be applied to maximize the flexibility of the n offset values. For example, if transmit diversity such as SORTD is not used in the PUCCH transmission, then a non-even n offset value may be acceptable. However, if the PUCCH is later transmitted using SORTD, then an even n offset value may be desirable. A combination of odd and even values may allow for both scenarios, because a scaling factor such as 2 may be applied so that the odd values become the even values desired for the SORTD transmission. As an example and referring to the n offset values 515 of the ninth embodiment, the use of a scaling factor such as 2 may make the values (−2, 0, 1, 2) become the even values (−4, 0, 2, 4). In some embodiments the RRC may configure the scaling factor, while in other embodiments the eNB may configure the scaling factor for use by the UE for the PUCCH transmission.

In certain embodiments where the ePDCCH is used in a stand-alone new carrier type (NCT), for example as a PCell, the above described embodiments may be altered. For example, the n offset value may be maintained considering possible future extensions such as downlink multiuser multiple-input and multiple output (MU-MIMO) or coordinated multipoint transmission (CoMP). Alternatively, the n offset value may be effectively removed, for example by always setting the n offset value to 0. In this instance the n offset value may be used as a virtual cyclic redundancy check (CRC) field. In other embodiments, the n offset value may be completely removed from the DCI.

›DETAILED DESCRIPTION · 4 of 5

As discussed above, in certain embodiments starting offsets for dynamic resource allocation may be provided by RRC parameters indicated by RRC signaling. In those embodiments, at least one n offset value may contain at least one of the RRC parameters. For example, denoting N PUCCH (1,k) (where k=0, 1) as a UE-specific starting offset RRC parameter for ePDCCH set k, an n offset value may contain at least one of N PUCCH (1,k=0) and/or N PUCCH (1,k=1) .

The UE specific starting offset values N PUCCH (1,k) may help to efficiently use a given PUCCH resource region by using the RRC parameters in the n offset to offset the PUCCH parameters so that physical uplink shared channel (PUSCH) signals may also be transmitted in those PUCCH region depending on eNB scheduling.

In these embodiments, the offset values n offset may be 0, 2, N PUCCH (1,k=0) , or N PUCCH (1,k=1) . In these embodiments, the n offset parameters may therefore be a hybrid version of even number offset values and ePDCCH offset values, as described above. Other variants for n offset may include 0, N PUCCH (1,k=0) +M 1 , or N PUCCH (1,k=1) +M 2 where N, M1, and M2 are the integer values. In this example, N, M1 and M2 may each be equal to 1 or −1. In some embodiments all three of the variables may be equal to one another, and in other embodiments at least one of the variables may have a value that is different from the other variables. In other embodiments, N may be equal to 1 or −1, and M1 and/or M2 may be equal to 0. In certain embodiments, N, M1, and M2 may be an even number such as 2, −2, or some other even number to avoid resource collisions by SORTD or FDD channel selection. For example, in these embodiments n offset may be 0, ±2, N PUCCH (1,k=0) ±2, N PUCCH (1,k=0) ±2, where “±A” represents +A or −A.

In a certain embodiments, the offset values n offset for an ePDCCH set k may be 0, 2, N PUCCH (1,k=0) −N PUCCH (1,k) , or N PUCCH (1,k=1) −N PUCCH (1,k) . In these embodiments, the n offset parameters may therefore effectively change the UE specific starting offset for an ePDCCH set k into the signaled n offset value, for example the n offset indicated by ARI as described above. In other embodiments, other variants for n offset may include 0, N, N PUCCH (1,k=0) −N PUCCH (1,k) −M 1 , or N PUCCH (1,k=1) −N PUCCH (1,k) +M 2 where N, M1, and M2 are integer values. In this example, N, M1 and M2 may each be equal to 1 or −1. In some embodiments all three of the variables may be equal to one another, and in other embodiments at least one of the variables may have a value that is different from the other variables. In other embodiments, N may be equal to 1 or −1, and M1 and/or M2 may be equal to 0. In certain embodiments, N, M1, and M2 may be an even number such as 2, −2, or some other even number to avoid resource collisions by SORTD or FDD channel selection. For example, in these embodiments n offset may be 0, ±2, N PUCCH (1,k=0) −N PUCCH (1,k) ±2, N PUCCH (1,k=1) −N PUCCH (1,k) ±2 where “±A” represents +A or −A. In embodiments where the starting offset for the second ePDCCH set k=1, N PUCCH (1,k=1) , is not configured, the value of N PUCCH (1,k=1) may be replaced by cell specific starting offset N PUCCH (1) . In these embodiments, the values of n offset may then be 0, N, N PUCCH (1,k=0) −N PUCCH (1,k) +M 1 , or N PUCCH (1) −N PUCCH (1,k) +M 2 where N, M1, and M2 are the integer values.

Embodiments of the present disclosure may be implemented into a system using any suitable hardware and/or software to configure as desired. FIG. 6 schematically illustrates an example system 600 that may be used to practice various embodiments described herein. FIG. 6 illustrates, for one embodiment, an example system 600 having one or more processor(s) 605 , system control module 610 coupled to at least one of the processor(s) 605 , system memory 615 coupled to system control module 610 , non-volatile memory (NVM)/storage 620 coupled to system control module 610 , and one or more communications interface(s) 625 coupled to system control module 610 .

In some embodiments, the system 600 may be capable of functioning as the UE 110 as described herein. In other embodiments, the system 600 may be capable of functioning as the eNB 105 depicted in the embodiment shown in FIG. 1 or any one of the other described embodiments. In some embodiments, the system 600 may include one or more computer-readable media (e.g., system memory or NVM/storage 620 ) having instructions and one or more processors (e.g., processor(s) 605 ) coupled with the one or more computer-readable media and configured to execute the instructions to implement a module to perform actions described herein.

System control module 610 for one embodiment may include any suitable interface controllers to provide for any suitable interface to at least one of the processor(s) 605 and/or to any suitable device or component in communication with system control module 610 .

System control module 610 may include memory controller module 630 to provide an interface to system memory 615 . The memory controller module 630 may be a hardware module, a software module, and/or a firmware module.

System memory 615 may be used to load and store data and/or instructions, for example, for system 600 . System memory 615 for one embodiment may include any suitable volatile memory, such as suitable DRAM, for example. In some embodiments, the system memory 615 may include double data rate type four synchronous dynamic random-access memory (DDR4 SDRAM).

System control module 610 for one embodiment may include one or more input/output (I/O) controller(s) to provide an interface to NVM/storage 620 and communications interface(s) 625 .

The NVM/storage 620 may be used to store data and/or instructions, for example. NVM/storage 620 may include any suitable non-volatile memory, such as flash memory, for example, and/or may include any suitable non-volatile storage device(s), such as one or more hard disk drive(s) (HDD(s)), one or more compact disc (CD) drive(s), and/or one or more digital versatile disc (DVD) drive(s), for example.

›DETAILED DESCRIPTION · 5 of 5

The NVM/storage 620 may include a storage resource physically part of a device on which the system 600 is installed or it may be accessible by, but not necessarily a part of, the device. For example, the NVM/storage 620 may be accessed over a network via the communications interface(s) 625 .

Communications interface(s) 625 may provide an interface for system 600 to communicate over one or more network(s) and/or with any other suitable device. The system 600 may wirelessly communicate with the one or more components of the wireless network in accordance with any of one or more wireless network standards and/or protocols. For example, the communications interface(s) 625 may be coupled with the transceiver module 120 discussed above with respect to FIG. 1 .

For one embodiment, at least one of the processor(s) 605 may be packaged together with logic for one or more controller(s) of system control module 610 , e.g., memory controller module 630 . For one embodiment, at least one of the processor(s) 605 may be packaged together with logic for one or more controllers of system control module 610 to form a System in Package (SiP). For one embodiment, at least one of the processor(s) 605 may be integrated on the same die with logic for one or more controller(s) of system control module 610 . For one embodiment, at least one of the processor(s) 605 may be integrated on the same die with logic for one or more controller(s) of system control module 610 to form a System on Chip (SoC).

In various embodiments, the system 600 may be, but is not limited to, a server, a workstation, a desktop computing device, or a mobile computing device (e.g., a laptop computing device, a handheld computing device, a tablet, a netbook, etc.). In various embodiments, the system 600 may have more or less components, and/or different architectures. For example, in some embodiments, the system 600 includes one or more of a camera, a keyboard, liquid crystal display (LCD) screen (including touch screen displays), non-volatile memory port, multiple antennas, graphics chip, application-specific integrated circuit (ASIC), and speakers.

Methods and apparatuses are provided herein for dynamically allocating uplink control channel resources. In certain embodiments, a UE may receive an offset value on an ePDCCH. The UE may further receive one or more eCCEs of the ePDCCH. Then, the UE may determine allocation of an uplink resource of a PUCCH based at least in part on an index of a first eCCE of the one or more eCCEs and the offset value. In certain embodiments the offset value may be received in downlink control information transmitted in the ePDCCH, while in other embodiments the offset value may be based at least in part on an antenna port associated with the ePDCCH. In at least one embodiment the antenna port may be allocated to the first eCCE. In some embodiments the allocation of the uplink resource may be based at least in part on a UE specific starting offset value for a set of the ePDCCH. Additionally the offset value may be based on the UE specific starting offset value or a cell specific starting offset value. In some embodiments at least one of the plurality of offset values may be even or negative, and a scaling factor may be used to multiply the offset value. Additionally, the index of the first eCCE may be less than an index of other eCCEs of the one or more eCCEs.

Certain embodiments may further include an apparatus with receiving and processing circuitry configured to perform functions similar to the embodiments described above. Additionally, the receiving circuitry may be further configured to obtain one or more CCEs of a PDCCH, and the processing circuitry may determine a second allocation of an uplink resource of the PUCCH based at least in part on an index of a first CCE of the one or more CCEs. In some embodiments the first allocation and the second allocation may be different from one another.

Other embodiments may include a UE comprising a receiver configured to receive an offset value and one or more eCCEs of the ePDCCH. The UE may further comprise a processor configured to allocate an uplink resource of a PUCCH based at least in part on an index of a first eCCE of the one or more eCCEs and the offset value. The UE may also comprise a transmitter configured to transmit a signal on the physical uplink control channel using the first uplink resource.

Although certain embodiments have been illustrated and described herein for purposes of description, this application is intended to cover any adaptations or variations of the embodiments discussed herein. Therefore, it is manifestly intended that embodiments described herein be limited only by the claims.

Where the disclosure recites “a” or “a first” element or the equivalent thereof, such disclosure includes one or more such elements, neither requiring nor excluding two or more such elements. Further, ordinal indicators (e.g., first, second or third) for identified elements are used to distinguish between the elements, and do not indicate or imply a required or limited number of such elements, nor do they indicate a particular position or order of such elements unless otherwise specifically stated.

Claims as granted

20 claims

Log in to read the claims of this application.

Log in to unlock

Classifications

4 codes
IPC · International Patent Classification
Section H — Electricity
  • H04W88/02
  • H04W72/04
  • H04L5/00
  • H04W72/14

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this application are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomApr 2015Jul 2015Oct 2015Jan 2016Apr 2016Jul 2016Oct 2016Jan 2017Apr 2017Jul 2017Oct 2017USPTOApplicantNon-final rejectionResponse after non-finalNotice of appeal filedNotice of allowance
USPTOApplicanthover for detail · click to open
Pendency
2.3 y
832 days filing → grant
Office actions
2
non-final + final
Responses
2
no RCE
Examiner
Afsar M Qureshi
art unit 2472 · TC 2400
Citations: 33 back · 3 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Documents

Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.

Log in to unlock

Chain of title

⤢ drag to zoom202020222024202620282030203220342036Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock