Abstract

A testing scheduling system for optimizing and scheduling a testing path among a plurality of available work station calculates a distance between work stations according to the coordinates of the of the available work stations, assigns a value to a quantity, and applies this to the failure rate of each work station, the backlog quantities of each work station, the test-awaited quantities, and the distances between each available work station to acquire a failure rate value, a backlog quantities value, a test-awaited quantities value, and a distances value. The testing scheduling system further calculates a first weighted value of each available work station by summing the failure rate value, the backlog quantities value, the test-awaited quantities value, and the distances value of each available work station, and analyzes the first weighted values to determine a preferred work station.

Description

5 parts
›FIELD

The present disclosure relates to a testing scheduling system and a method for scheduling a number of work stations.

›BACKGROUND

An operator usually selects a work station arbitrarily from a number of similar work stations to test a worked state of products by experience, without considering other factors such as a failure rate of each work station or a pass-after-initial-failure rate of each work station.

›BRIEF DESCRIPTION OF THE DRAWINGS

Many aspects of the present disclosure are better understood with reference to the following drawings. The components in the drawings are not necessarily drawn to scale, the emphasis instead being placed upon clearly illustrating the principles of the present disclosure. Moreover, in the drawings, like reference numerals designate corresponding parts throughout the several views.

FIG. 1 is a block diagram of a testing scheduling system in accordance with an exemplary embodiment.

FIG. 2 is a flowchart of a method for one part of scheduling work stations which is implemented by the testing scheduling system of FIG. 1 .

FIG. 3 is a flowchart of a method for overall scheduling work stations implemented by the testing scheduling system of FIG. 1 .

›DETAILED DESCRIPTION · 1 of 2

The disclosure is illustrated by way of example and not by way of limitation in the figures of the accompanying drawings in which like references indicate similar elements. It should be noted that references to “an” or “one” embodiment in this disclosure are not necessarily to the same embodiment, and such references mean “at least one.” The references “a plurality of” and “a number of” mean “at least two.”

Embodiments of the present disclosure will be described with reference to the accompanying drawings.

FIG. 1 illustrates a testing scheduling system (hereinafter “system”) 100 for optimizing and scheduling a testing path among a number of available work stations. Each available work station is used to test a worked state of a product, and is assigned a name, a coordinate, a failure rate, a backlog status (hereinafter, “the backlog quantity”), a quantity of products awaiting testing (hereinafter, “the test-awaited quantity”), a pass-after-initial-failure rate, and a standard period of time for testing a qualified product.

The system 100 includes a first calculating module 102 , a processing module 103 , a second calculating module 104 , a determining module 105 , and an output module 106 , being a collection of software instructions executed by one or more processor 10 .

The first calculating module 102 calculates distances (hereinafter, “the distances between work stations”) between every available work station according to the coordinates of the locations of the available work stations. The processing module 103 assigns a value to a quantity, or assigns a point on a scale to a quantity, and applies this to the failure rate of each work station, the backlog quantities of each work station, the test-awaited quantities, and the distances between each available work station to acquire a failure rate value, a backlog quantities value, a test-awaited quantities value, and a distances value enabling a global calculation to be carried out for every available work station in relation to all other work stations.

The second calculating module 104 calculates a first weighted value of each available work station by summing the failure rate value, the backlog quantities value, the test-awaited quantities value, and the distances value of each available work station. The determining module 105 analyzes the first weighted values of all available work stations, and determines a work station which has the smallest first weighted value, as a preferred work station, from all available work stations. The output module 106 outputs the name of work station so determined.

In a second embodiment, the system 100 further includes a generating module 101 . The generating module 101 randomly generates a period of time for the testing of an unqualified product. Herein, the time generated falls into a range from zero to the standard period of time. The first calculating module 102 calculates a scalar product (hereinafter, “the scalar product”) of the time and the failure rate of each available work station. The processing module 103 assigns a value to a quantity, or assigns a point on a scale to a quantity, and applies this to the pass-after-initial-failure rate of each work station, and the scalar product of each work station to acquire a pass-after-initial-failure rate value, and a scalar product value enabling a global calculation to be carried out for every available work station in relation to all other work stations. The second calculating module 104 calculates a second weighted value of each available work station by summing the pass-after-initial-failure rate value, the scalar product value, the backlog quantities value, the test-awaited quantities value, and the distances value of each available work station. The determining module 105 analyzes the second weighted value of each work station, and determines mathematically a shortest path between a starting work station and an ending work station based on an analysis result of the second weighted value of each work station. The output module 106 outputs a sequence of the names of the work stations in the shortest path as determined. In one embodiment, the mathematics includes Dijkstra arithmetic. In detail, the determining module 105 analyzes all paths from the starting work station to the ending work station, determines the identities of the work stations in each path, calculates a sum of the second weighted values of the work stations in each path, and determines that the path with the smallest applicable sum is the shortest path. In another embodiment, Floyd arithmetic can be included in the mathematics.

FIG. 2 is a flowchart of a method of determining one part of work stations implemented by the testing scheduling system of FIG. 1 .

In 601 , a first calculating module calculates the distances between work stations according to the coordinates of the locations of the available work stations.

In 602 , a processing module assigns a value to a quantity, or assigns a point on a scale to a quantity, and applies this to the failure rate of each work station, the backlog quantities of each work station, the test-awaited quantities, and the distances between each available work station to acquire a failure rate value, a backlog quantities value, a test-awaited quantities value, and a distances value enabling a global calculation to be carried out for every available work station in relation to all other work stations.

In 603 , a second calculating module calculates a first weighted value of each available work station by summing the failure rate value, the backlog quantities value, the test-awaited quantities value, and the distances value of each available work station.

In 604 , a determining module analyzes the first weighted values of all available work stations, and determines a work station which has the smallest first weighted value, as a preferred work station, from all available work stations.

In 605 , an output module outputs the name of the work station so determined.

›DETAILED DESCRIPTION · 2 of 2

FIG. 3 is a flowchart of a method of determining the overall scheduling of testing implemented by the testing scheduling system of FIG. 1 .

In 701 , a generating module randomly generates a period of time for the testing of an unqualified product.

In 702 , the first calculating module calculates the scalar product of the time and the failure rate of each available work station.

In 703 , the processing module assigns a value to a quantity, or assigns a point on a scale to a quantity, and applies this to the pass-after-initial-failure rate of each work station, and the scalar product of each work station to acquire a pass-after-initial-failure rate value, and a scalar product value enabling a global calculation to be carried out for every available work station in relation to all other work stations.

In 704 , the second calculating module calculates the second weighted value of each available work station by summing the pass-after-initial-failure rate value, the scalar product value, the backlog quantities value, the test-awaited quantities value, and the distances value of each available work station.

In 705 , the determining module analyzes the second weighted value of each work station, and determines mathematically a shortest path between a starting work station and an ending work station based on an analysis result of the second weighted value of each work station.

In 706 , the output module outputs the sequence of names of the work stations in the shortest path as determined.

It is believed that the present embodiments and their advantages will be understood from the foregoing description, and it will be apparent that various changes may be made thereto without departing from the spirit and scope of the disclosure or sacrificing all of its material advantages, the examples hereinbefore described merely being exemplary embodiments of the present disclosure.

Claims as granted

8 claims

Log in to read the claims of this application.

Log in to unlock

Classifications

1 codes
IPC · International Patent Classification
Section G — Physics
  • G06F11/26

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this application are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomApr 2014Jul 2014Oct 2014Jan 2015Apr 2015Jul 2015Oct 2015Jan 2016USPTOApplicantNotice of allowance
USPTOApplicanthover for detail · click to open
Pendency
1.6 y
592 days filing → grant
Office actions
0
none on record
Examiner
Jigar Patel
art unit 2114 · TC 2100
Citations: 2 back · 3 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Documents

Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.

Log in to unlock

Chain of title

⤢ drag to zoom20142016201820202022202420262028203020322034Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock