EMI frequency spreading method for switching power converter
Granted 24 Feb 2015 · no office action yet
Current assignee: Dialog Semiconductor GmbH (Renesas ) · originally Renesas Electronics Corporation
Law firm: Law firm · Log in to unlock
Attorney: Attorney · Log in to unlock
Inventors: David Nguyen, Yong Li, Junjie Zheng, Fuqiang Shi +1 · Examiner: Emily P Pham · AU 2838 · TC 2800
Life of the application
10 dated eventsAbstract
A controller of a switching power converter sets an actual turn-on time of a switch in the switching power converter in each switching cycle by selecting one of a plurality of valley points of the output voltage of the switching power converter occurring subsequent to the desired turn-on time of the switch. The desired turn-on time of the switch may be calculated according to the regulation scheme employed by the switching power converter. The controller selects one of the plurality of valley points randomly from switching cycle to switching cycle. The controller generates a control signal to turn on the switching power converter at the selected one of the plurality of valley points of the output voltage occurring subsequent to the desired turn-on time.
Description
11 parts›CROSS REFERENCE TO RELATED APPLICATION
This application claims priority under 35 U.S.C. §119(e) from U.S. Provisional Patent Application No. 61/560,766, filed on Nov. 16, 2011, which is incorporated by reference herein in its entirety.
›BACKGROUND
1. Technical Field
The present disclosure relates to improving electromagnetic interference frequency in a switching power converter operating in a valley-mode switching (VMS) scheme.
2. Description of the Related Art
Each time a switch, such as a transistor, in a switching power converter is turned on or off, electromagnetic interference (EMI) related to the switching frequency is generated. Large rates of change for voltages and/or currents (i.e., dv/dt and/or di/dt) at the time of the switch transition increase the amount of EMI produced by the switch. EMI generated by switching power converters, if not properly managed, can generate frequencies that actively interfere with the operation of other devices coupled to the switching power converters, or can otherwise encroach into frequency bands designated to be free from interfering frequencies.
›SUMMARY
Embodiments include setting an actual turn-on time of a switch in a switching power converter in each switching cycle by selecting one of a plurality of valley points of the output voltage occurring subsequent to the desired turn-on time of the switch calculated according to the regulation scheme employed by the switching power converter, with the selection of one of the plurality of valley points done randomly from switching cycle to switching cycle. In one embodiment, the switching power converter may be turned on at either one of two valley points of the output voltage occurring subsequent to the desired turn-on time of the switch calculated according to the regulation scheme employed by the switching power converter, with the selection of one of two valley points occurring according to the value of a pseudo random number sequence. Turning on the switch at one of multiple valley points randomly selected results in spreading the frequency spectrum of EMI generated by the switching activities in the switching power converter, reducing the EMI energy in any one particular band. Furthermore, the VMS scheme according to the embodiments herein better isolates other devices coupled to the switching power converter from switching-induced EMI by limiting the variation of the instantaneous switching frequency.
The features and advantages described in the specification are not all inclusive and, in particular, many additional features and advantages will be apparent to one of ordinary skill in the art in view of the drawings and specification. Moreover, it should be noted that the language used in the specification has been principally selected for readability and instructional purposes, and may not have been selected to delineate or circumscribe the inventive subject matter.
›BRIEF DESCRIPTION OF DRAWINGS
The teachings of the embodiments of the present disclosure can be readily understood by considering the following detailed description in conjunction with the accompanying drawings.
FIG. 1 illustrates an AC to DC flyback switching power supply, according to one embodiment.
FIG. 2A illustrates the pin-outs of the controller IC of the AC to DC flyback switching power supply, according to one embodiment.
FIG. 2B illustrates the internal circuitry of the controller IC of the AC to DC flyback switching power supply in more detail, according to one embodiment.
FIG. 3A illustrates operational waveforms for the flyback switching power supply of FIG. 1 during a switching cycle, according to one embodiment.
FIG. 3B illustrates operational waveforms for the flyback switching power supply of FIG. 1 during another switching cycle, according to one embodiment.
FIG. 4 illustrates a circuit for detecting and predicting the timing of valleys for a switch voltage, according to one embodiment.
FIG. 5 illustrates a flowchart of an exemplary method for dithering the actual switching period of an AC to DC flyback switching power supply, according to one embodiment.
›DETAILED DESCRIPTION OF EMBODIMENTS · 1 of 7
The Figures (FIG.) and the following description relate to preferred embodiments of the present disclosure by way of illustration only. It should be noted that from the following discussion, alternative embodiments of the structures and methods disclosed herein will be readily recognized as viable alternatives that may be employed without departing from the principles of the present disclosure.
Reference will now be made in detail to several embodiments of the present disclosure, examples of which are illustrated in the accompanying figures. It is noted that wherever practicable similar or like reference numbers may be used in the figures and may indicate similar or like functionality. The figures depict embodiments of the present disclosure for purposes of illustration only. One skilled in the art will readily recognize from the following description that alternative embodiments of the structures and methods illustrated herein may be employed without departing from the principles of the disclosure described herein.
FIG. 1 illustrates an exemplary power converter 100 in accordance with one embodiment. As illustrated, the power converter 100 is an AC to DC flyback switch-mode power supply, but other topologies of switch-mode power converters can be designed in accordance with the approach to improve the effective spread of EMI generated by a switching power converter operating in a VMS scheme and other teachings described herein. The power converter 100 includes three principal sections, i.e., a front end 104 , a power stage, and a secondary stage.
The front end 104 is directly connected to an AC voltage source (not shown) at nodes L, N, and includes a bridge rectifier comprised of inductor L 1 , resistors R 1 , F 1 , diodes D 1 , D 2 , D 3 , D 4 , and capacitor C 2 . The output of the front end section 104 at node 105 is a rectified but unregulated DC input voltage. The rectified input line voltage at node 105 is input to the supply voltage pin Vcc (pin 1 ) of switch controller 102 via resistors R 10 and R 11 for use as the supply voltage during initial start-up of controller 102 . The line voltage at node 105 is also applied to the primary winding 106 of power transformer T 1 -A. Bypass capacitor C 5 removes high frequency noise from the rectified line voltage at node 105 .
The power stage comprises power transformer T 1 -A, a switch 112 , and a controller 102 . Power transformer T 1 -A includes a primary winding 106 , a secondary winding 107 , and an auxiliary winding 108 . Controller 102 maintains output regulation via control of the ON and OFF states of switch 112 via a control signal 110 output from the OUTPUT pin (pin 5 ) of controller 102 . In one embodiment, controller 102 is an application-specific integrated circuit (ASIC) and generates the control signal 110 in accordance with the improved VMS scheme and techniques described herein.
Control signal 110 drives the control terminal of switch 112 . In the embodiment illustrated by FIG. 1 , switch 112 is a bipolar junction transistor (BJT), so the control terminal is the base (B) terminal of switch 112 . Meanwhile, the collector (C) of switch 112 is connected in series with the primary winding 106 , while the emitter (E) of switch 112 is connected to the ISENSE pin (pin 4 ) of controller 102 and to ground via resistor R 12 . In other embodiments, switch 112 can be another type of transistor such as a MOSFET or any other device capable of opening or closing a circuit in a controlled manner. The ISENSE pin (pin 4 ) senses the current through the primary winding 106 and switch 112 in the form of a voltage across sense resistor R 12 . The GND pin (pin 2 ) of controller 102 is connected to ground. Controller 102 can employ any one of a number of well known modulation techniques, such as pulse-width-modulation (PWM) or pulse-frequency-modulation (PFM), and/or their combinations, to control the ON and OFF states and duty cycles of BJT power switch 110 , as well as the amplitude of the base current of BJT switch 112 .
The secondary stage of the converter 100 includes the secondary winding 107 and diode D 6 , capacitor C 10 , and resistor R 14 . Diode D 6 functions as an output rectifier and capacitor C 10 functions as an output filter. The resulting regulated output voltage Vo at node 109 is delivered to the load (not shown). Resistor R 14 is the so-called pre-load which is typically used for stabilizing the output at no load conditions. Also, ESD discharge gap (ESD 1 ) is coupled between the primary winding 106 and output node 109 .
As shown by FIG. 1 , the output voltage V 0 across the secondary winding 107 is reflected by the voltage 120 across auxiliary winding 108 , which is input to the VSENSE pin (pin 3 ) of controller IC 102 via a resistive voltage divider comprised of resistors R 3 and R 4 . In one embodiment, the voltage 114 at the VSENSE pin (pin 3 ) provides feedback to the controller 102 for use in controlling the operation of switch 112 and the output voltage 109 for regulation of output voltage (Vo) or output current (Iout). Also, although controller 102 is powered up by the line voltage 105 at start-up, after start-up and in normal operation, controller 102 is powered up by the voltage across auxiliary winding 108 and the line voltage 105 is not used for regulation of output voltage (Vo) and input voltage (Vin) in normal operation. Diode D 5 and resistor R 2 form a rectifier for rectifying the voltage 120 across auxiliary winding 108 for use as the supply voltage input to the VCC pin (pin 1 ) of controller 102 during normal operation of the switching power converter 100 . Capacitor C 9 is used to hold power from the line voltage at node 105 at start-up or from the voltage across auxiliary winding 108 during start-up and between switching cycles of the switching power converter 100 .
FIG. 2A illustrates the pin-outs of the controller IC 102 according to one embodiment. Controller 102 is a 5-pin IC. Pin 1 (Vcc) is a power input pin for receiving the supply voltage, pin 2 (GND) is a ground pin, pin 3 (V SENSE ) is an analog input pin configured to receive the voltage 120 across the auxiliary winding 108 of the flyback switching power supply for primary-side regulation of the output voltage 109 , pin 4 (I SENSE ) is an analog input pin configured to sense the primary-side current of the flyback switching power supply in the form of an analog voltage, for cycle-by-cycle peak current control and limit. Pin 5 (OUTPUT) is an output pin outputting base drive signal 110 for controlling the on-times and off-times of the BJT power switch 112 as well as the amplitude of the base current of BJT power switch 112 .
›DETAILED DESCRIPTION OF EMBODIMENTS · 2 of 7
FIG. 2B illustrates the internal circuitry of the controller 102 , according to one embodiment. Controller 102 includes several main circuit blocks, including a V SENSE signal conditioning block 202 , an I SENSE signal conditioning block 206 , and a digital logic control block 204 . Controller 102 receives analog signals such as V SENSE 114 at pin 3 and the I SENSE voltage 116 at pin 4 , but adaptively processes these parameters using digital circuitry and digital state machines to generate the appropriate control signal 110 at pin 5 (Output) for regulation of the output voltage (Vo) and output current (Iout) under the adopted operation mode of the switching power converter 100 .
V SENSE signal conditioning block 202 receives V SENSE 114 as an analog voltage signal and generates one or more voltage feedback signals 218 that reflect the output voltage (Vo) at node 109 . The V SENSE signal conditioning block 202 includes a valley detection module 212 that detects resonant characteristics of V SENSE 114 and outputs related valley feedback signals, as will be explained in more detail below with reference to FIG. 4 . Included in the voltage feedback signals 218 are the valley feedback signals output to the valley prediction module 214 .
I SENSE signal conditioning block 206 receives the I SENSE voltage 116 as an analog voltage signal and generates one or more current feedback signals 220 that reflect the primary side current flowing through switch 112 . Sensing the V SENSE 114 voltage allows for precise output voltage regulation, and sensing the I SENSE voltage 116 allows for precise cycle-by-cycle peak current control and limiting in both constant voltage and constant current modes as well as precise constant current (output current Iout) control that is insensitive to the magnetizing inductance Lm of the transformer T 1 -A.
Digital logic control block 204 processes the voltage feedback signals 218 and the current feedback signals 220 and implements an improved VMS scheme to generate the control signal 110 that governs the operation and on/off states of the switch 112 for regulation of output voltage (Vo) and output current (Iout). Digital logic control block 204 includes a valley prediction module 214 that predicts the location of local valleys for V SENSE 114 based on resonance information included in the voltage feedback signals and introduces dither in selecting which one of the local valleys to use as the timing for turning on the switch 112 in each switching cycle of the switching power converter 100 , as detailed below with reference to FIGS. 3A , 3 B, 4 , and 5 . Also, digital logic control block 204 includes a digital state machine (not shown) for implementing one or more control schemes for regulating the operation of the power converter 100 based on the voltage feedback signals 218 and the current feedback signals 220 . Digital logic control block 204 can implement any number of control schemes suitable for switch-mode power converters 100 , such as pulse-width-modulation (PWM) or pulse-frequency-modulation (PFM), and/or their combinations.
Under an example PWM control scheme, digital logic control block 204 turns on the switch 112 with a constant switching frequency, and therefore a constant switching period, but varies the duty cycle of the switch by adjusting how long the switch 112 remains ON during each switching period. Duty cycle refers to the fraction (often expressed as a percentage) of the switching period during which the switch 112 is ON. For example, a PWM switching scheme may have a switching frequency of 100 kHz and therefore a switching period of 10 μs. Hence, for a duty cycle of 30%, switch 112 would be ON for 3 μs and OFF for 7 μs of each switching period. Under PWM control, digital logic control block 204 regulates the output voltage (Vo) at node 109 based on feedback signals such as the voltages received by either the V SENSE pin (pin 3 ) or I SENSE pin (pin 4 ) by adjusting the duty cycle of control signal 110 , but maintains a constant switching frequency for control signal 110 .
Under an example PFM control scheme, digital logic control block 204 turns on the switch 112 with pulses of a set duration, but controls the duty cycle of control signal 110 by issuing the pulses with a variable switching frequency, and therefore a variable switching period. For example, a PFM switching scheme may turn on the switch 112 for 5 μs of each switching period, but vary the switching frequency between 40 kHz and 130 kHz. A switching frequency of 40 kHz would correspond to a switching period of 25 μs and therefore a duty cycle of 20%, whereas a switching frequency of 130 kHz would correspond to a switching period of 7.7 μs and therefore a duty cycle of approximately 65%. Hence, under PFM control, digital logic control block 204 regulates the output voltage (Vo) at node 109 based on feedback signals such as the voltages received by either the V SENSE pin (pin 3 ) or I SENSE pin (pin 4 ) by adjusting the frequency and period of control signal 110 , but the switch 112 is ON for the same duration during each switching period.
The example PWM and PFM control schemes described above are presented for illustrative purposes. The VMS scheme and associated techniques described herein can benefit a switch-mode power converter 100 that uses any control scheme, regardless of whether PWM or PFM or some other control scheme is used. For example, the VMS scheme enables the power converter 100 to take advantage of resonance within the power converter 100 to operate switch 112 when the voltage across switch 112 is at a minimum.
FIG. 3A illustrates operational waveforms for the flyback switching power supply of FIG. 1 during a switching cycle, and FIG. 3B illustrates operational waveforms for the flyback switching power supply of FIG. 1 during another switching cycle, according to one embodiment. FIGS. 3A and 3B are similar except that FIG. 3A illustrates that valley point 328 C is selected as the switch turn-on time t ON 320 B according to the PN sequence 340 in one switching cycle, while FIG. 3B illustrates that valley point 328 D is selected as the switch turn-on time t ON 320 B according to PN sequence 340 in another switching cycle different from the switching cycle shown in FIG. 3A . The switching cycle in FIG. 3B may be immediately subsequent to, subsequent to by multiple cycles, or even prior to, the switching cycle shown in FIG. 3A .
›DETAILED DESCRIPTION OF EMBODIMENTS · 3 of 7
As described above, V SENSE 114 represents the voltage on the V SENSE pin (pin 3 ) of switch controller 102 . V CE 304 represents the voltage across switch 112 . Hence, in the embodiment illustrated by FIG. 1 wherein the switch 112 is a BJT, V CE 304 is the voltage between the collector and the emitter of BJT switch 112 . In other embodiments (not shown), switch 112 can be a power MOSFET, in which case V CE 304 would correspond to the voltage between the source and the drain of the MOSFET. As can be seen from the schematic of FIG. 1 , V SENSE 114 is substantially proportional to the voltage 120 across the auxiliary winding of the transformer. V SENSE 114 and V CE 304 exhibit nearly identical timing characteristics. As described above, control signal 110 represents the voltage on the OUTPUT pin (pin 5 ) of switch controller 102 . The switch 112 is ON (closed) when control signal 110 is HIGH and the switch 112 is OFF (open) when control signal 110 is LOW. V VMS 308 , valley indicator pulses 310 , and desired switch pulses 312 are timing signals internal to controller 102 whose generation and significance are detailed below in reference to FIGS. 3A and 3B .
At time t ON 320 A, controller 102 generates control signal 110 to be HIGH, turning on (closing) switch 112 . Switch 112 remains closed until time t OFF 322 A, when control signal 110 becomes LOW pursuant to the operation of controller 102 . As explained above, the particular timings of t ON 320 A and t OFF 322 A are determined by the particular control scheme (PWM or PFM) employed in switching power converter 100 . While switch 112 is closed from time t ON 320 A to time t OFF 322 A, referred to herein as the ON-time (or ON-period) T ON 331 , the rectified DC input voltage V IN 105 is applied to the primary winding 106 and the current through the primary winding 106 increases. During the ON-time T ON 331 , the voltage across the auxiliary winding 108 is characterized by the mathematical expression
V X = - N X N 1 V I N ,
wherein N X is the number of turns for the auxiliary winding 108 , N 1 is the number of turns for the primary winding 106 , V IN is the rectified DC input voltage at node 105 , and V X is the voltage at node 120 across the auxiliary winding 108 . Although the voltage 120 across the auxiliary winding 108 is negative during T ON 331 , V SENSE 114 does not significantly decrease below zero because of the clamping diode 430 included in controller 102 . As shown in FIG. 4 , the anode of the clamping diode 430 is connected to GND while the cathode of the clamping diode 430 is connected to the V SENSE pin (pin 3 ). Hence, V SENSE does not drop below zero during T ON 331 by more than the forward voltage drop of the clamping diode 430 . V CE 304 is also close to zero throughout T ON 331 .
However, referring back to FIG. 3A , at time t OFF 322 A, control signal 110 goes LOW, causing switch 112 to open and suddenly interrupting the current through the primary winding 106 . The current through the primary winding 106 stays at zero until the end of the OFF period of switch 112 , i.e., until the switch 112 is turned on again at time t ON 320 B as will be explained in more detail below. As shown by FIG. 3A , this sudden change in current results in high-frequency parasitic ringing for both V SENSE 114 and V CE 304 immediately following time t OFF 322 A. The high-frequency parasitic ringing results from resonance between the transformer leakage inductance and the parasitic capacitance seen from the collector and emitter of BJT switch 112 in parallel with the equivalent parallel parasitic capacitance of the primary winding 106 , and typically dies out quickly. After the high-frequency parasitic ringing dies out, V SENSE 114 and V CE 304 remain almost flat until the transformer resets, shown in FIG. 3A as time t RESET 324 A.
The duration between t OFF 322 A and t RESET 324 A is referred to herein as the transformer reset period (T RST ) 333 . During the transformer reset period T RST 333 , diode D 6 conducts and the voltage across the secondary winding 107 approximately equals the output voltage 109 (V O ) (the forward voltage drop across diode D 6 can be considered negligible for the purpose of illustrative clarity). Accordingly, the voltage across the primary winding 106 (V 1 ) can be expressed in terms of the output voltage 109 (V O ) as
V 1 = N 1 N 2 V O
and the voltage across the auxiliary winding 108 (V X ) can be expressed as
V X = + N X N 2 V O
wherein N 1 , N 2 , and N X are the number of turns for the primary winding 106 , secondary winding 107 , and auxiliary winding 108 , respectively. During the transformer reset time T RST 333 , V SENSE 114 follows the voltage across the auxiliary winding 108 according to the scaling factor set by the voltage divider comprised of resistors R 3 and R 4 . Meanwhile, V CE 304 is given by the expression
V CE = N 1 N 2 V O + V I N ,
wherein V IN is again the rectified DC input voltage at node 105 .
The transformer reset time T RST 333 is dictated by the volt-second-balance requirement for resetting the transformer core and can vary between switching cycles based on fluctuations in load and other quantities within the power converter 100 . At t RESET 324 A (the end of the transformer reset time T RST 333 ), diode D 6 stops conducting, causing the transformer magnetizing inductance and therefore V SENSE 114 and V CE 304 to resonate, a phenomenon referred to herein as transformer ringing. The resonant frequency (f REs ) and resonant period (T RES ) 327 of ringing for V SENSE 114 and V CE 304 due to transformer ringing is determined by the parasitic capacitance seen from the collector and the emitter of BJT switch 112 in parallel with the equivalent parallel parasitic capacitance of the primary winding 106 . Due to various damping and loss factors within the power converter 100 , V SENSE 114 and V CE 304 are decaying sinusoidal signals with resonant period T RES 327 .
As shown by FIG. 3A , the ringing-induced voltage oscillations cause V SENSE 114 and V CE 304 to periodically approach or reach local minimum voltages and local maximum voltages. When the OFF time for switch 112 is long relative to the resonant period T RES 327 , eventually the transformer ringing decays completely and V CE 304 settles at V IN 105 . Times at which V CE 304 reaches a local minimum as a result of transformer ringing are referred to herein as valleys 328 A, 328 B, and 328 C. For example, FIG. 3A illustrates a first valley 328 A, a second valley 328 B, and a third valley 328 C. Although three valleys are shown in FIG. 3B , there can be more or less than three valleys before the switch is turned ON again at t ON 320 B.
›DETAILED DESCRIPTION OF EMBODIMENTS · 4 of 7
As described previously, some VMS schemes would turn on switch 112 (i.e., set control signal 110 HIGH) at the first valley 328 A, which is prior to the desired switching timing 312 . Turning on switch 112 during a valley reduces the magnitude of the switching transition, which in turn may reduce the magnitude of EMI generated related to the switching frequency. Using the durations shown in FIG. 3 , this type of VMS schemes would result in a switching period of approximately (T ON +T RST +T RES /2). And as described previously, fluctuations in the transformer reset time T RST 333 as well as the ON-time T ON 331 would precipitate changes in the switching frequency of the power converter 100 .
The resulting fluctuations in switching frequency make it difficult to prevent the switching frequency from encroaching on frequency bands intended to be free from interference. The variation in switching frequency results in the generation of varying spectrums of EMI emissions corresponding to the switching frequencies. And in some cases one or more of the varying spectrums of EMI emissions will encroach into an unintended frequency band. Accordingly, while this type of VMS scheme may reduce the magnitude of EMI emissions associated with a given switching frequency, it lacks the ability to manage the spectral spread of EMI emissions in a predictable manner.
In contrast, the VMS scheme implemented by controller 102 according the embodiments herein does not necessarily turn on switch 112 (i.e., set control signal 110 HIGH) at the first valley 328 A. Rather, controller 102 can dither the point to turn on the switch 112 on a switching cycle-by-switching cycle basis between valleys that occur subsequent to a desired switch time (t DESIRED ) calculated according to the output voltage regulation scheme employed by the digital logic controller 204 of the switching power converter 100 . As described herein, dither refers to modulation of the time distribution of the selection of each valley point at which the switch is turned on. This turn-on time (shown in FIG. 3 as t ON 320 B) is determined according to the control scheme employed by power converter 100 (e.g., a PWM, PFM or other suitable control scheme) combined with dithering of the valley point to use as will be explained further below. For example, for each switching cycle, controller 102 may determine the actual switching period of switch 112 according to the following algorithm: Tp_final=Tp_calc+T_dly, where Tp_final represents the final switching period, Tp_calc represents the calculated switching period based on the regulation control algorithm, and T_dly represents the additional delay added to the switching period by the combination of VMS and dithering of the valley point.
Specifically, digital logic control block 204 determines a desired switch time t DESIRED 330 in accordance with PWM, PFM, or other control schemes suitable for power converter 100 . Digital logic control block 204 determines the desired switch time t DESIRED 330 independently of the resonant characteristics of power converter 100 . Hence, resonant characteristics of the power converter 100 such as the transformer reset period T RST 333 or the resonant period T RES 327 do not constrain the control scheme implemented by digital logic control block 204 or influence determination of the desired switch time t DESIRED 330 .
Digital control block 204 then detects the valleys of the output voltage that occur subsequent to desired switch time t DESIRED 330 as further described in reference to FIG. 4 and selects one of the plurality of valley points among a set of valley points that occur subsequent to t DESIRED 330 to actually turn on the switch. To more effectively spread EMI emissions, controller 102 may use a pseudo-random number (PN) sequence 340 to dither the selection of which of the set plurality of valley points subsequent to t DESIRED 330 to use as the actual turn-on timing of the switch 112 . In one example, the set of valley points may be a set of adjacent valley points (e.g., first-second or second-third valley points that occur after t DESIRED 330 ). In another example, the set of valley points may be a set of non-adjacent valley points (e.g., second-fourth or first-fourth that occur after t DESIRED 330 ). Generally, the set of valley points from which a valley point is selected to use as the actual turn-on time of the switch 112 includes any set of valley points that occur within a switching cycle subsequent to desired switch time t DESIRED 330 resulting in instantaneous frequency variation between subsequent switching cycles of at least one valley. In other words, the number of valley points included in the set of valley points is selected in a manner to minimize the creation of large instantaneous frequency range deviation between subsequent switching cycles, while also reducing EMI.
For example, controller 102 may select either the first valley point or the second valley point immediately following desired switch time t DESIRED 330 as the actual turn-on time t ON 320 A of switch 112 , according to the result of a pseudo-random sequence. Specifically, controller 102 may assign a pseudo-random value to the first valley point and another pseudo-random value to the second-valley point. Controller 112 then determines the value of the pseudo-random number sequence at the desired switch turn-on time t DESIRED 330 , and selects a valley switching point corresponding to the determined pseudo-random value in PN sequence 340 . For example, as shown in FIG. 3A , PN sequence 340 may be a 1-bit binary number, “0” or “1”. The PN sequence may be generated by any type of pseudo-number generator (not shown herein), which generates a pseudo-random number for each switching cycle. The PN sequence generator may be included in controller 102 .
In this example, at the desired switch time t DESIRED 330 , PN sequence is “0”, which corresponds to first valley 328 C. Hence, controller 112 sets control signal 110 HIGH to turn on switch 112 at the first valley 328 C appearing subsequent to t DESIRED 330 . On the other hand as shown in FIG. 3B , at the desired switch time t DESIRED 330 , PN sequence is “1”, which corresponds to the second valley point 328 D immediately subsequent to the first valley point 328 C. Hence, controller 112 sets control signal 110 HIGH at the valley 328 D to turn on the switch 112 . In other embodiments, PN sequence may be a multi-bit value greater than one bit, which enables controller 112 to switch between greater than two adjacent or non-adjacent valley points that occur subsequent to desired switch time t DESIRED 330 . For example, controller 112 may cause t ON 320 B to dither between the second and third valley points occurring subsequent to calculated t DESIRED 330 according to a 1-bit PN sequence. For another example, controller 112 may cause t ON 320 B to dither between the first, second, third, and fourth valley points occurring subsequent to calculated t DESIRED 330 according to a 2-bit PN sequence. For another example, controller 112 may cause t ON 320 B to dither between the first and third valley points occurring subsequent to calculated t DESIRED 330 according to a 1-bit PN sequence.
›DETAILED DESCRIPTION OF EMBODIMENTS · 5 of 7
Hence, one embodiment of the improved VMS scheme according to the embodiments herein advantageously turns on switch 112 while V CE 304 is at a local minimum (i.e., a valley 328 A, 328 B . . . 328 D) without restricting the control scheme or switching frequency utilized by controller 102 . In other words, controller 102 determines the appropriate desired switch time 330 based on the employed control scheme independent of the resonant characteristics of the power converter 100 , and then randomly dithers, from switching cycle-to-switching cycle, the actual turn-on time of switch 112 between at least two valleys following the desired switch time t DESIRED 330 . Thus, the control scheme described herein may also be referred to as a “valley hopping switching” scheme. By dithering the turn-on time of switch 112 between multiple valley points subsequent to the calculated desired switch time t DESIRED 330 , it is possible to effectively spread EMI related to the switching frequency and limit the variation of the instantaneous switching frequency while still reaping the benefits of valley mode switching.
As shown by FIGS. 3A and 3B , there is a timing delay between the desired switch pulse 312 generated by the digital logic control block 204 at timing t DESIRED 330 and the turn on timing t ON 320 B of switch 112 (i.e., control signal 110 going HIGH) at valley 328 C ( FIG. 3A ) or 328 D ( FIG. 3B ). However, the timing delay does not adversely affect operation of the power converter 100 . Resonant periods T RES 327 are typically brief relative to the switching period of the switching power converter, so the delay between the desired switch pulse 312 and actual turn-on time t ON 320 B is usually not significant. Furthermore, the small impact of the timing delay is reflected in the output voltage 109 and other converter 100 parameters, and therefore the PWM, PFM, or other feedback-based control schemes implemented by controller 102 naturally compensates for the timing delay when determining the on-times and off-times for the subsequent switching period. Additionally, the fluctuations in timing delay from one switching cycle to the next switching cycle introduce dithering to the switching frequency over time, beneficially reducing switch-produced EMI by more effectively spreading the EMI spectrum. Because the variation in switching frequency is limited to adjacent valley points, the valley hopping scheme according to embodiments herein improves management of the amount of EMI that may potentially interfere with frequency bands intended to be free from such interference.
FIG. 4 depicts a valley detection circuit 212 in accordance with one embodiment. As explained above, the valley detection circuit 212 may be present in controller 102 , specifically in the V SENSE signal conditioning circuit 202 . The valley detection circuit 212 detects features of signals within the power converter 100 such as V SENSE 114 and V CE 304 . A detected feature can comprise, for example, the timing of a rising edge or falling edge of such signals, or such signals crossing a particular voltage threshold. The features detected by valley detection circuit 212 are processed by valley prediction module 214 in digital logic control block 204 to predict the locations of valleys 328 A, 328 B . . . 328 D, enabling the improved VMS scheme according to the embodiments described herein. The valley detection circuit 212 includes a VMS comparator 410 , a knee comparator 420 , and the previously described clamping diode 430 .
VMS comparator 410 receives V SENSE 114 at its positive input and compares it to a VMS reference voltage 405 received at the negative input of VMS comparator 410 . VMS comparator 410 outputs the V VMS signal 308 . Hence, as illustrated by the waveforms of FIGS. 3A and 3B , the V VMS signal 308 is HIGH whenever V SENSE 114 is above VMS reference 405 and is LOW whenever V SENSE 114 is below VMS reference 405 . VMS reference 405 can vary between different power converter 100 embodiments, but is a voltage close to zero, i.e., sufficiently low to accurately indicate that V SENSE 114 has dropped to a voltage low enough that a falling edge of V VMS 308 can be used to predict a valley 328 A, 328 B . . . 328 D, as illustrated by FIGS. 3A and 3B . For example, VMS reference 405 is 0.115V in one embodiment.
Knee comparator 420 receives V SENSE 114 at its positive input and compares it to a knee reference voltage 415 received at the negative input of knee comparator 420 . Knee comparator 420 outputs the V KNEE signal 425 (not shown in FIGS. 3A and 3B ), which is HIGH whenever V SENSE 114 is above the knee reference voltage 415 and is LOW whenever V SENSE 114 is below the knee reference voltage 415 . Hence, for example, a falling edge for V KNEE 425 may occur at t KNEE 326 (illustrated in FIGS. 3A and 3B ) which corresponds to a knee for V SENSE 114 (and therefore V CE 304 ) as it decays. The specific level of the knee reference voltage 415 can vary between different power converter 100 embodiments, but is chosen to correspond to a knee voltage for V SENSE and is set higher than the VMS reference voltage 405 . For example, knee reference 415 is 1.48V in one embodiment. V KNEE 425 approximately indicates the value of V SENSE 114 when output diode D 6 stops conducting in each switching cycle of the power converter 100 .
In one embodiment, V VMS 308 is included in the voltage feedback signals 218 received by the valley prediction module 214 ( FIG. 2B ). Valley prediction module 214 performs feature analysis, by examining the timing of the rising and falling edges of V VMS 308 to predict the times at which the valleys 328 A, 328 B . . . 328 D of the voltage V CE 304 across switch 112 may occur before these valleys actually occur in the voltage V CE 304 . For example, valley prediction module 214 can determine the resonant period 327 for V CE 304 and V SENSE 114 based on the timing data included in V VMS 308 . As shown in FIG. 3 , the midpoint of a trough for V VMS 308 approximately corresponds to a valley 328 A, 328 B . . . 328 D and such midpoints are predictable via analysis of the edges of V VMS 308 . Digital logic control block 204 generates a valley indicator pulse 310 synchronized to each valley 328 A, 328 B . . . 328 D predicted by valley prediction module 214 .
›DETAILED DESCRIPTION OF EMBODIMENTS · 6 of 7
Valley prediction module 214 can also predict valleys 328 A, 328 B . . . 328 D by analyzing V KNEE 425 along with V VMS 308 . In one embodiment, the signals V VMS 308 and V KNEE 425 are included in the voltage feedback signals 218 received by the valley prediction module 214 . The falling edge of V KNEE 425 occurring at time t KNEE 326 A and the first falling edge of V VMS 308 within a single switching cycle represent two known time and voltage points for V SENSE 114 . Since V SENSE 114 and V CE 304 are known to be decaying sinusoidal waveforms, valley prediction module 214 can utilize Fourier analysis techniques associated with decaying sinusoidal signals to characterize and predict the behavior of V SENSE 114 . Due to the known and predictable relationship between V SENSE 114 and V CE 304 , valley prediction module 214 can similarly characterize and predict the behavior of V CE 304 , including the timing of valleys 328 A, 328 B . . . 328 D. Digital logic control block 204 generates a valley pulse 310 synchronized to each valley 328 A, 328 B . . . 328 D predicted by valley prediction module 214 .
The valley detection and prediction operate in real time switching-cycle by switching-cycle of the switching power converter. Because the resonant characteristics of the power converter including the transformer magnetizing inductance and the parasitic capacitance can vary substantially among individual power supplies during mass production, and/or when the power converter is operating under different conditions, the real-time detection and prediction make the improved VMS scheme insensitive to the resonant characteristics variations during the power supply mass production and operations.
As described previously, FIGS. 3A and 3B are for illustrative purpose only. Although four valleys are shown in FIG. 3B , there can be more or fewer than four valleys before the switch is turned ON again at t ON 320 B, and typically there are more valleys in light load conditions and fewer valleys in heavy load conditions. In some embodiments, the improved VMS scheme implemented by digital logic control block 204 can adapt to specific power converter operating conditions, such as a light output load. For example, a light load condition typically uses a PFM controls scheme and results in exceptionally long switching periods, causing V CE 304 and V SENSE 114 to decay to the point that the benefits of VMS switching are minimal. In one embodiment, digital logic control block 204 maintains a counter (not shown) to count the valleys 328 A, 328 B . . . 328 D experienced during a switching period and, if the count exceeds a predetermined threshold, sets control signal 110 HIGH (turning on switch 112 ) at the desired switch time 330 rather than at the subsequent valley 328 A, 328 B . . . 328 D. In another embodiment, digital logic control block 204 monitors durations of troughs on V VMS 308 , and if a trough duration exceeds a threshold, sets control signal 110 HIGH (turning on switch 112 ) at the desired switch time 330 rather than at the subsequent valley 328 A, 328 B . . . 328 D, as it is likely that V SENSE 114 has decayed such that it will not again exceed VMS reference 405 within the switching period. In another embodiment, valley prediction module 214 keeps generating valley indicator pulses even after V SENSE 114 has decayed to below VMS reference voltage 405 , and so a valley hopping scheme may also be applied for conditions where longer switching periods occur.
FIG. 5 illustrates a flowchart of an exemplary method for dithering the switching period of an AC to DC flyback switching power supply, according to one embodiment. The process of FIG. 5 may be carried out by controller 102 to implement the valley hopping scheme of the embodiments described herein. In step 505 , the process starts and the switching control operation parameters, such as a desired switch time, pseudo-random bit sequence used to dither the valley switching points, and assignment of the valley switching points to an associated pseudo-random number may be determined. In step 510 , a determination is made as to whether a control signal is to be generated to turn on switch 112 . If a control signal is to be generated, indicating that the switch is to be turned on in the upcoming switching cycle of the power converter, the process proceeds to step 515 . Otherwise, the process remains in step 510 .
In step 515 , controller 102 analyzes the output voltage (or V SENSE ) of the switching power converter 100 to determine if the output voltage is at a valley mode switching point that occurred subsequent to the desired switch time. If controller detects a valley point, the process proceeds to step 520 , but otherwise the process remains in step 515 until the output voltage reaches a valley mode switching point. In step 520 , controller 102 evaluates the output of a pseudo-random bit sequence 340 at the desired switch time calculated according to the output voltage regulation scheme to determine whether PN=0 or PN=1. If PN=0, which is assigned to the first valley point ( 328 C) occurring subsequent to desired switch time calculated according to the output voltage regulation scheme in this example, controller 102 proceeds to start the control signal 110 and turns-on switch 112 at the first valley point 328 C occurring subsequent to the desired turn-on time calculated according to the output voltage regulation scheme employed by controller 102 to start the new switching cycle in step 530 . On the other hand, if PN=1 in step 520 , which is assigned to the second valley point ( 328 D) occurring subsequent to the desired switch time calculated according to the output voltage regulation scheme employed by controller 102 , controller skips the first valley point ( 328 C) and determines in step 525 whether the second valley point ( 328 D) occurred. When the second valley point ( 328 D) occurs, controller 102 proceeds to start the control signal 110 and turns-on switch 112 at the second valley point 328 D to start the new switching cycle in step 530 ; otherwise, the controller 102 waits in step 525 until the second valley point ( 328 D) occurs. Then, controller remains in step 535 until generation of the control signal 110 is complete, at which point the process returns to step 510 to start generation of control signal 110 in the next switching cycle of the power converter 100 . In some embodiments, controller 102 may determine whether generation of control signal 110 is complete by detecting a falling edge of the control signal 110 , which may indicate that switch 112 has been turned off and controller 112 should prepare for the start of a subsequent switching cycle.
›DETAILED DESCRIPTION OF EMBODIMENTS · 7 of 7
Upon reading this disclosure, those of skill in the art will appreciate still additional alternative embodiments of an improved VMS scheme and associated implementation circuitry for switch-mode power converters through the disclosed principles herein. Thus, while particular embodiments and applications have been illustrated and described, it is to be understood that the disclosed embodiments are not limited to the precise construction and components disclosed herein. Various modifications, changes and variations, which will be apparent to those skilled in the art, may be made in the arrangement, operation and details of the method and apparatus disclosed herein without departing from the spirit and scope described herein.
Claims as granted
26 claimsLog in to read the claims of this application.
Log in to unlockClassifications
5 codes- H02M1/44
- H02M3/335
Claim changes
SoonSee which claims were amended, added or cancelled during examination, with every added and removed word marked.
The published claims of this application are not paired with the granted ones in what we hold.
File wrapper
See the full prosecution history — every USPTO and applicant action on this file, in order.
Log in to unlockDocuments
Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.
Log in to unlockChain of title
See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.
Log in to unlock