Method of ensuring the coordinated arc fault protection in a heirarchial power distribution system

Granted 31 Jul 2012 · 1 office action

Life of the application

9 dated events
⤢ drag to zoom20102012201420162018202020222024202620282030ProsecutionOwnershipTerm & fees
ProsecutionOwnershipTerm & feeshover for detail · click to open

Abstract

A coordinated arc fault protection scheme in a hierarchical power distribution system is disclosed. The methods according to embodiments of the present invention may be considered an “event and time graded†analysis. In event and time based analysis, the number of confirmed arc signature may be monitored with respect to time in the main feeder line as well as the branched feeders. The confirmed arc signature in the branched feeder, as well as in the main feeder, may be captured and time stamped. A trip command may be issued first in the intended branched feeder if the branched feeder experiences a minimum number of events within a given time. During the same time period, the main feeder also monitors similar arcing events. If the tripping of the branched feeder occurs and the main feeder still detects arcing events, the main feeder may be tripped after a certain period of time or a certain number of confirmed arc signature. If there is no arc in the branched feeder and the main feeder itself experiences the arc, then the main feeder may be tripped after a predetermined period of time so that the current to all the branched feeders may be cut and the main feeder may be protected.

Description

6 parts
›BACKGROUND OF THE INVENTION

The present invention relates to apparatus and methods for providing arc fault protection in a circuit and, more particularly, apparatus and methods for ensuring coordinated arc fault protection in hierarchical power distribution systems, such as those used in aircraft.

In a typical hierarchical power distribution system, power controllers with built-in arc fault protection function provide protection against arcing faults, overload protections and differential protections in the main feeder line as well as in the individual branched feeders.

The coordination of overload protections and differential protections between the main feeder lines and the branch lines are inherently guaranteed by the current ratings of power controllers themselves. However, if a particular arcing is present in the branched feeder, a typical power controller with built-in arc fault protection may trip the main feeder line in addition to the intended branched feeder line having the arc fault, such that the power supply is disconnected from the particular load having the arc fault, as well as from other loads powered by the same main feeder line. causing undesirable power interruptions to those loads.

Conventional arc fault protection schemes may include a physical communication between the main feeder line and the branch feeder line, as well as between separate branch feeder lines. Such a physical connection may be used, in conventional arc fault protection schemes, to permit coordination such that, when an arc fault is present in a branch feeder, only that branch feeder load control unit may trip. However, this physical communication link may result in additional issues in terms of cost, weight, timing, and data throughput, etc.

As can be seen, there is a need for an arc fault protection scheme that may provide coordination between the power controllers with built-in arc fault protection of the various branch circuits as well as of the main circuit. Moreover, there is a need to provide such coordination reliably without the need for a physical communication link between various circuits.

›SUMMARY OF THE INVENTION

In one aspect of the present invention, a method for coordinating arc fault protection in a power system comprises monitoring a number of confirmed arc signature with respect to time in a main feeder line of the power system and in at least one branched feeder line of the power system; tripping a circuit breaker in the branched feeder line when a first predetermined number of confirmed arc signature occur in the branched feeder line within a first predetermined period of time; and tripping a circuit breaker in the main feeder line when a second predetermined number of confirmed arc signature occur in the main feeder line within a second predetermined period of time, wherein the second predetermined period of time is greater than the first predetermined period of time such that an arc in the branched feeder line trips only the circuit breaker in the branched feeder line without tripping the circuit breaker in the main feeder line.

In another aspect of the present invention, a method for coordinating arc fault protection in a power system comprises monitoring a number of confirmed arc signature with respect to time in a main feeder line of the power system and in at least one branched feeder line of the power system; tripping a circuit breaker in the branched feeder line when a first predetermined number of confirmed arc signature occur in the branched feeder line within a first predetermined period of time; and tripping a circuit breaker in the main feeder line when a second predetermined number of confirmed arc signature occur in the main feeder line within a second predetermined period of time, wherein the second predetermined period of time is greater than the first predetermined period of time such that an arc in the branched feeder line trips only the circuit breaker in the branched feeder line without tripping the circuit breaker in the main feeder line; and there is an absence of any physical connection between a controller in the main feeder line and a controller in any of the branched feeder lines.

In a further aspect of the present invention, an apparatus for coordinating arc fault protection in a power system comprises a main feeder line supplying power to at least a first and a second branched feeder; a control unit in each of the main feeder line and the first and second branched feeder lines for detecting an arcing event therein; and a circuit breaker in each of the main feeder line and the first and second branched feeder lines, wherein the control unit in the branched feeder line counts the number of confirmed arc signature and signals the circuit breaker to trip when a first predetermined number of confirmed arc signature occur within a first predetermined period of time; the control unit in the main feeder line counts the number of confirmed arc signature and signals the circuit breaker to trip when a second predetermined number of confirmed arc signature occur within a second predetermined period of time; the second predetermined period of time is greater than the first predetermined period of time such that an arc in the branched feeder line trips only the circuit breaker in the branched feeder line without tripping the circuit breaker in the main feeder line.

These and other features, aspects and advantages of the present invention will become better understood with reference to the following drawings, description and claims.

›BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a schematic drawing showing a hierarchical power distribution system for executing a method according to an embodiment of the present invention;

FIG. 2 is a time-line showing the event and time graded protection scheme according to an embodiment of the present invention;

FIG. 3A is a schematic drawing showing a hierarchical power distribution system, with a parallel arc fault generated in a branched feeder therein, for executing a method according to an embodiment of the present invention;

FIG. 3B is a schematic drawing showing a hierarchical power distribution system, with a series arc fault generated therein, for executing a method according to an embodiment of the present invention;

FIG. 3C is a schematic drawing showing a hierarchical power distribution system, with a parallel arc fault generated in a main feeder therein, for executing a method according to an embodiment of the present invention;

FIG. 3D is a schematic drawing showing a hierarchical power distribution system, with a series arc fault generated in a main feeder therein, for executing a method according to an embodiment of the present invention;

FIG. 4A is a screen image showing the signature currents for a parallel arc fault in a branch feeder circuit;

FIG. 4B is a screen image showing a second test showing the signature currents for a parallel arc fault in a branch feeder circuit;

FIG. 4C is a screen image showing the signature currents for a parallel arc fault located in a main feeder circuit;

FIG. 4D is a screen image showing the signature currents for a series arc fault located in a branch feeder circuit;

FIG. 4E is a screen image showing the signature currents for a series arc fault located in a main feeder circuit; and

FIG. 5 is a flow chart describing a method according to the present invention.

›DETAILED DESCRIPTION OF THE INVENTION · 1 of 3

The following detailed description is of the best currently contemplated modes of carrying out exemplary embodiments of the invention. The description is not to be taken in a limiting sense, but is made merely for the purpose of illustrating the general principles of the invention, since the scope of the invention is best defined by the appended claims.

Various inventive features are described below that can each be used independently of one another or in combination with other features.

Broadly, embodiments of the present invention provide apparatus and methods of ensuring a coordinated arc fault protection scheme in a hierarchical power distribution system. The methods according to embodiments of the present invention may be considered an “event and time graded” analysis. In event and time based analysis, the number of confirmed arc signature may be monitored with respect to time in the main feeder line as well as the branched feeders. The arcing events in the branched feeder, as well as in the main feeder, may be captured and time stamped. A trip command may be issued first in the intended branched feeder if the branched feeder experiences a minimum number of events within a given time. During the same time period, the main feeder also monitors similar arcing events. If the tripping of the branched feeder occurs and the main feeder still detects arcing events, the main feeder may be tripped after a certain period of time or a certain number of confirmed arc signature. If there is no arc in the branched feeder and the main feeder itself experiences the arc, then the main feeder may be tripped after a predetermined period of time so that the current to all the branched feeders may be cut and the main feeder line may be protected.

The methods according to embodiments of the present invention may determine the presence of an arc not based solely on energy measurements, but by analyzing the energy signal and detection the presence of an arc signature.

Embodiments of the present invention may be beneficial to any typical power distribution system. For example, the apparatus and methods according to embodiments of the present invention may be beneficial in primary and secondary power distribution systems in aircraft, in residential buildings, oil refineries, industrial electrical protection and naval applications.

Referring to FIG. 1 , there is shown a schematic drawing of a hierarchical power distribution system 10 for executing a method according to an embodiment of the present invention. A main feeder line 12 may distribute power to first and second branched feeder lines 14 a , 14 b . Electronic load control units (ELCUs) 12 - 1 , 14 a - 1 , 14 b - 1 may monitor arc faults on the main feeder line 12 and the branched feeder lines 14 a , 14 b , respectively. For study purposes, faults may be generated at Point A, Point B or Point C, as discussed in greater detail below.

By using the method according to an embodiment of the present invention, if any arc occurs in one of the branched feeder lines 14 a , 14 b , then only the relay/switch in that branch should trip immediately, leaving the relay in the main feeder line 12 unaffected so that power to the other branched feeders may be available. Similarly, if there is any arc in the main feeder line 12 , then the power to all the branched feeder lines 14 a , 14 b should be discontinued so that no load gets affected due to the arc. Therefore, embodiments of the present invention contemplate an arc co-ordination strategy that may be taken to prevent unneeded power interruption.

For example, assuming all circuit breakers, CB- 1 , CB- 2 and CB- 3 are closed, as shown in FIG. 1 , and an arc is initiated at Point B, then CB- 2 should trip after a given period of time, while CB- 1 and CB- 3 should remain closed. Should an arc be initiated at Point A, then CB- 1 should get tripped, discontinuing the power to the branched feeder lines 14 a , 14 b.

Embodiments of the present invention may create the desired co-ordination between various arc fault protection devices without having any physical communication established in between any two particular ELCUs. Such co-ordination may be achieved with the event and time-based scheme as described in greater detail below.

Referring now to FIG. 2 , there is shown a time-line 20 of the event and time graded protection scheme according to an embodiment of the present invention. The event and time graded analysis scheme adapted may provide a solution by monitoring the arcing events at each branched feeder line 14 a , 14 b (see FIG. 1 ) and may provide co-ordination activity between the main feeder line 12 and the branched feeder lines 14 a , 14 b.

In FIG. 2 , the event and time based analysis method according to an embodiment of the present invention may monitor the number of confirmed arc signature with respect to time. For example, Point B (see FIG. 1 ) may monitor two confirmed arc signature within time period TdA 1 and the arc algorithm may confirm this as an arc. In this case, the circuit breaker CB- 2 may trip.

At Point A, the ELCU 12 - 1 may also monitor two confirmed arc signature within time period TdA 1 but it doesn't take any action. The ELCU 12 - 1 may further start monitoring the arcing if any arc is available down the line within time period TdA 2 . Now if ELCU 12 - 1 still finds more arcs (for example, greater than four confirmed arc signature) within time period TdA 2 then the ELCU 12 - 1 may trip. If the ELCU 12 - 1 sees less arcs (for example, ←4 arcs) and both ELCU 12 - 1 and ELCU 14 a - 1 did not trip within TdA 1 and TdA 2 respectively, then after a known time (e.g., 1 sec) (TdA total ) all the counters may be reset and again the algorithm may start looking for fresh arcing events. This resetting period may be a predetermined value that resets after detection of the first arc fault, as shown in FIG. 2 .

It should be noted that the TdA 1 and TdA 2 timing values were tested in the lab environments and are well within the SAE timing requirements of <100 ms for a parallel arc. The TdA total value (1 sec) may be a tentative figure and may be refined depending on the specific application.

›DETAILED DESCRIPTION OF THE INVENTION · 2 of 3

Referring to FIGS. 3A through 3D , there are shown cases in which the co-ordination tests were performed in the lab. In FIG. 3A , a parallel arc (such as a guillotine arc) may be created in branched feeder line 14 b at Point C. In FIG. 3B , a series arc may be established in branched feeder line 14 b at Point C. In FIG. 3C , a parallel arc may be created in the main feeder line 12 at Point A. In FIG. 3D , a series arc may be established in the main feeder line 12 at Point A. While FIGS. 3A through 3D refer to parallel and series arcs, any arc signature may be detected by the ELCU 12 - 1 , 14 a - 1 , 14 b - 1 , including wet arcs, ground arcs and the like. In FIGS. 3A through 3D , the actual current passing through each feeder line 12 , 14 a , 14 b and the length of each feeder line 12 , 14 a , 14 b as used to obtain the below results, are shown.

The co-ordination tests were performed for all the above four cases ( FIGS. 3A through 3D ) and a number of similar trials were taken. The event and timing analysis technique according to an embodiment of the present invention provided 100% co-ordination when arcs were generated in the main feeder line 12 and branched feeder lines 14 a , 14 b for the above described hierarchical power distribution system. The following tables show the success result of the coordinated arc fault protections in a hierarchical power distribution system.

Referring now to FIGS. 4A through 4E , there are shown screen images of exemplary signature currents for various arcs in various circuits from FIGS. 3A through 3D . In FIG. 4A , there is shown a screen image of the signature currents for a parallel arc fault in a branch feeder circuit. In FIG. 4B , there is shown a screen image of a second test showing the signature currents for a parallel arc fault in a branch feeder circuit. In FIG. 4C , there is shown a screen image of the signature currents for a parallel arc fault located in a main feeder circuit. In FIG. 4D , there is shown a screen image of the signature currents for a series arc fault located in a branch feeder circuit. In FIG. 4E , there is shown a screen image of the signature currents for a series arc fault located in a main feeder circuit.

Lab Results:

In the Lab setup, the Co-ordination Activity was performed using three ELCU Controllers as per the setup shown in FIGS. 2A , 2 B, 2 C and 2 D. The ELCU controllers have DSP controller TMS320F28016. The Arc Fault and Co-ordination algorithm according to an embodiment of the present invention monitored different arcs and performs co-ordination at different places as discussed in detail below.

Referring to FIGS. 4A and 4B , there is shown the co-ordination of ELCUs happening for the parallel arc fault test at branch feeder line 14 b (see FIG. 3A ).

Specifically referring to FIG. 4A , the lower waveform 40 a - 4 shows a pulse which is exactly the response of the algorithm for arc fault when TdA 1 =10 mS (See FIG. 2 ). If the main feeder arc current signature 40 a - 1 was observed, it may show the sum of currents of the two branched feeder lines ( 14 a , 14 b ) before tripping off of relay (ce- 30 ) in Branch C ( 14 b ). After tripping of the relay in the branch feeder line, the current waveform 40 a - 1 in the main feeder line ( 12 ) was the same as the current waveform 40 a - 2 in Branch B ( 14 b ), as no additional arcing events were detected.

Specifically referring to FIG. 4B , in a second trial of the Branch C parallel arc test, a time delay of the algorithm, TdA 1 , was 4 mS. Similar to the case above, the time delay of the relay to trip off, TdR was 10 mS.

Referring to FIG. 4C , there is shown the co-ordination of ELCUs happening for a parallel arc fault in the main feeder line 12 at Point A (see FIG. 2C ). In this case, the time delay of the algorithm, TdA 2 , was 50 ms and the time delay of the relay to trip off, TdR, was 80 ms. FIG. 4C shows the co-ordination activity happening between the main feeder and the branched feeder lines. In this case, the parallel arc was generated at the Point A (Main Feeder) where ELCU 12 - 1 observed a parallel arc fault. It could be seen that the DSP Controller sends a trip command after 50 ms and that all the currents in the branched feeder lines as well as current in the main feeder were cleared soon after 130 ms.

Referring to FIG. 4D , there is shown the co-ordination of ELCUs happening for a series arc fault in the branched feeder line at Point C (see FIG. 3B ). In this case, the time delay of the algorithm, TdA 1 , was 35 ms and the time delay of the relay to trip off, TdR, was 10 ms. FIG. 4D shows the co-ordination activity happening between the main feeder and the branched feeder. In this case the series arc was generated at the Point C where ELCU 14 b - 1 was observing a series arc fault. It could be seen that the DSP controller sent a trip command after TdA 1 =35 ms and the currents in the branched feeder line associated with Point C were cleared soon after 45 ms. The main feeder continued supplying power to the other branched feeder line B because once the circuit breaker was opened in the branched feeder line, the main feeder ELCU 12 - 1 no longer detected any arc fault signatures.

Referring to FIG. 4E , there is shown the co-ordination of ELCUs happening for a series arc fault in the main feeder at Point A (see FIG. 2D ). In this case, the time delay of the algorithm, TdA 2 , was 20 mS and the time delay of the relay to trip off, TdR, was 10 mS. FIG. 4E shows the co-ordination activity happening between the main feeder and the branched feeder. In this case the series arc was generated at the Point A where ELCU 12 - 1 was detecting a series arc fault. It could be seen that the DSP Controller sent a trip command after TdA 2 =20 ms and the currents in the branched feeder lines were cleared soon after 30 ms from the first arcing event.

While the above description relates to a single main feeder line and two branched feeder circuits, embodiments of the present invention may include additional main feeder lines and either additional branched feeder circuits or even further branching of the individual branched feeder circuits. For example, a branched feeder line may branch into several sub-branched feeder lines. In this case, the sub-branched feeder lines may be coordinated with the branched feeder lines and the main feeder line in the same series. A first number of arc faults may need to be detected over a first period of time to trip a circuit breaker in the sub-branched feeder line. Then, if the branched feeder line upstream from the sub-branched feeder line still detects an arc fault, after a second number of arc faults over a second period of time, the circuit breaker for the branched feeder line may trip. Finally, similar to the description above, if, a main feeder line detects a third number of arc faults over a third period of time, then the main feeder line circuit breaker may trip. Thus, there may be three or more levels of coordination according to an embodiment of the present invention.

›DETAILED DESCRIPTION OF THE INVENTION · 3 of 3

Referring to FIG. 5 , there is shown a flow chart describing a method 50 according to an embodiment of the present invention. The method 50 may include a first step 52 of monitoring a number of confirmed arc signature with respect to time in a main feeder line of the power system and in at least one branched feeder line of the power system. This monitoring step may be carried out, for example, by ELCU 12 - 1 , 14 a - 1 and 14 b - 1 . The method 50 may include a step 54 of tripping a circuit breaker in one of the at least one branched feeder lines when a first predetermined number of confirmed arc signature occur in the branched feeder line within a first predetermined period of time. The method 50 may include a further step 56 of tripping a circuit breaker in the main feeder line when a second predetermined number of confirmed arc signature occur in the main feeder line within a second predetermined period of time. Finally, the method 50 may include a step 58 of resetting the number of confirmed arc signature after a reset period of time.

It should be understood, of course, that the foregoing relates to exemplary embodiments of the invention and that modifications may be made without departing from the spirit and scope of the invention as set forth in the following claims.

›Tables in the description — 2
TABLE 1 — Results of Coordination tests - For Parallel arc
Number ofNumber ofResults
TestNumber of TrialspassesFails(%)
Parallel Arc in550100
the Main feeder
Parallel Arc in550100
Branch feeder B
Parallel Arc in550100
Branch feeder C
TABLE 2 — Results of Coordination tests - For Series arc
Number ofNumber ofResults
TestNumber of TrialspassesFails(%)
Series Arc in550100
the Main feeder
Series Arc in550100
Branch feeder C

Claims as granted

17 claims

Log in to read the claims of this application.

Log in to unlock

Classifications

3 codes
IPC · International Patent Classification
Section H — Electricity
  • H02H7/00
  • H02H3/00
USPC · US Patent Classification
361/62

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this application are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJul 2009Jan 2010Jul 2010Jan 2011Jul 2011Jan 2012Jul 2012USPTOApplicantNon-final rejectionNotice of allowance
USPTOApplicanthover for detail · click to open
Pendency
3.3 y
1,208 days filing → grant
Office actions
1
non-final + final
Responses
1
no RCE
Interviews
2
examiner interview summaries
Examiner
Rexford Barnie
art unit 2836 · TC 2800
Citations: 8 back · 1 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Documents

Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.

Log in to unlock

Chain of title

⤢ drag to zoom20102012201420162018202020222024202620282030Owner 1