USPatent applicationPatented

Communication apparatus and allocation determining method

Granted 27 May 2014 · 5 office actions

Life of the application

16 dated events
⤢ drag to zoom20102012201420162018202020222024202620282030ProsecutionOwnershipTerm & fees
ProsecutionOwnershipTerm & feeshover for detail · click to open

Abstract

A communication apparatus for communicating via a frame containing a plurality of first type blocks into which pilot information is inserted and a plurality of second type blocks into which control information or data is inserted, the communication apparatus including a channel estimation accuracy predicting unit for predicting channel estimation accuracy of each of the plurality of second type blocks based on channel estimate values of the plurality of first type blocks in the frame. The communication apparatus includes an allocation determining unit for determining an allocation based on priority information containing a priority of each type of the control information and data such that control information or data of a higher-priority type is inserted into a block among the plurality of second type blocks with higher channel estimation accuracy.

Description

7 parts
›CROSS-REFERENCE TO RELATED APPLICATION(S)

This application is based upon and claims the benefit of priority of the prior Japanese Patent Application No. 2008-51157, filed Feb. 29, 2008, the entire contents of which are incorporated herein by reference.

›BACKGROUND

1. Field

The present invention relates to a communication apparatus that communicates using a frame of multiple blocks and an allocation determining method in the communication apparatus. The present invention also relates to a communication apparatus and an allocation determining method for improving the transmission efficiency.

2. Description of the Related Art

Currently, the 3GPP (The Third Generation Partnership Project), a mobile communication standards body, is developing the LTE (Long Term Evolution) specifications for next-generation mobile communications. In the development of the LTE specifications, an example format, as illustrated in FIG. 8 , is defined as a frame format for uplink communications.

As illustrated in FIG. 8 , the frame format for uplink communications contains a plurality of blocks, in which data, control information or an RS (Reference Signal) is inserted into each block. An RS is pilot information that is used for estimating a channel. An RS includes a Sounding RS for measurement and a Dem RS for demodulation.

An RS is used to obtain a channel estimate value necessary to demodulate data or control information in a frame. The frame format in FIG. 8 shows that an RS is inserted into an SB (Short Block), and that the data or control information is inserted into an LB (Long Block). A communication apparatus performs processing, such as complementation or averaging, to determine a channel estimate value of an LB that is not adjacent to any SB.

However, even the complementation or the like cannot avoid variations in accuracy of channel estimation due to the LB position. That is, the channel estimation accuracy of LBs that are adjacent to an SB is the highest, and the channel estimation accuracy of the LB that is farther away from the SB is lower. For an LB with lower channel estimation accuracy, a transmission error is more likely to occur.

Japanese Laid-Open Patent Publication No. 2007-116427 proposes a technique to improve the transmission efficiency in communications via such a frame format. According to the technique, based on an assumption that an LB being nearer to pilot information has higher channel estimation accuracy, data of a user with higher propagation path property fluctuation velocity is allocated in an LB being near to pilot information, preventing degradation in receiving performance of the fast-moving user.

However, even the adjustment of an insertion position of data for each user, as disclosed in the related art above, cannot sufficiently improve the transmission efficiency. For example, if the control information for demodulation/decoding has not been normally transmitted and even if the data has been normally transmitted, it is still unavoidable that the data will be discarded because the demodulation/decoding of the data cannot be performed, resulting in a decrease in transmission efficiency.

Another example is that when much data needs to be retransmitted for some reason, if new data is normally transmitted but data to be retransmitted is not normally transmitted, many LBs will be used to retransmit the data. Because of this, fewer LBs can be used to transmit the new data, resulting in a decrease in transmission efficiency. The transmission efficiency decreases in both cases that much data needs to be retransmitted and that the retransmission related control information is not normally transmitted.

›SUMMARY

According to an aspect of the embodiments of the invention, a communication apparatus for communicating via a frame containing a plurality of first type blocks into which pilot information is inserted and a plurality of second type blocks into which control information or data is inserted, the communication apparatus including a channel estimation accuracy predicting unit for predicting channel estimation accuracy of each of the second type blocks based on channel estimate values of the plurality of first type blocks in the frame. The communication apparatus includes an allocation determining unit for determining an allocation based on priority information containing a priority of each type of the control information and data such that control information or data of a higher-priority type is inserted into a block among the second type blocks with higher channel estimation accuracy.

The object and advantages of the embodiments will be realized and attained by means of the elements and combinations particularly pointed out in the claims.

It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention, as claimed.

›BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a block diagram illustrating the configuration of a base transceiver station according to an embodiment;

FIG. 2 is a diagram illustrating one example of a frame format;

FIG. 3 is a diagram illustrating one example of a channel estimation accuracy information table;

FIG. 4A is a diagram illustrating one example of a priority table in which the highest priority is given to information about demodulation/decoding;

FIG. 4B is a diagram illustrating one example of a priority table in which the highest priority is given to information about retransmission;

FIG. 5 is a diagram illustrating one example of allocation information;

FIG. 6 is a block diagram illustrating the configuration of a mobile terminal corresponding to the base transceiver station according to an embodiment of the invention;

FIG. 7 is a sequence diagram illustrating a processing procedure of block insertion processing by the base transceiver station illustrated in FIG. 1 ; and

FIG. 8 is a diagram illustrating one example of a frame format.

›DESCRIPTION OF EMBODIMENTS · 1 of 3

The following will describe a preferable embodiment of the invention in detail with reference to the attached drawings. In the following embodiment, an example is illustrated in which the disclosed technique is applied to a base transceiver station. The application is not limited to the base transceiver station, but the technique can be applied to various communication apparatuses.

First, there is described the configuration of a base transceiver station 10 being one example of a communication apparatus for executing an allocation determining method according to this embodiment. The allocation determining method according to this embodiment determines a priority depending on a type of data and control information and allocates data and information with a higher priority in an LB with higher channel estimation accuracy, thereby aiming to improve the transmission efficiency.

FIG. 1 is a block diagram illustrating the configuration of a base transceiver station 10 according to an embodiment. As illustrated in FIG. 1 , the base transceiver station 10 includes a receiving unit 101 , an uplink transmission frame demodulating/decoding unit 102 , a channel estimation accuracy predicting unit 103 , a priority table 104 , an allocation determining unit 105 , a scheduler 106 , a transmission information generating unit 107 , a data framing unit 108 , a data modulating unit 109 , a control information framing unit 110 , a control information modulating unit 111 , a multiplexing unit 112 and a transmitting unit 113 .

The receiving unit 101 receives an uplink frame transmitted from another apparatus. The uplink transmission frame demodulating/decoding unit 102 demodulates and decodes control information and data contained in the uplink frame received by the receiving unit 101 . The channel estimation accuracy predicting unit 103 predicts the channel estimation accuracy of each LB in a frame format based on an uplink channel estimate value of each SB obtained during the demodulation/decoding by the uplink transmission frame demodulating/decoding unit 102 .

The prediction of the channel estimation accuracy by the channel estimation accuracy predicting unit 103 will be described here in detail. The channel estimation accuracy predicting unit 103 obtains the variance of a channel estimate value to predict the channel estimation accuracy of each LB. For example, assume that a frame format is as illustrated in FIG. 2 , and channel estimate values obtained by Dem RS 1 to 4 have time components t and f. If the components t and f can be represented as hRS 1 (t, f), hRS 2 (t, f), hRS 3 (t, f) and hRS 4 (t, f), respectively, then variances of regions R 1 to R 3 included between the respective RSs are represented by the following (equation 1) to (equation 3), respectively:

Where L is the length of a block and N is the number of subcarriers configuring a multicarrier. The channel estimation accuracy predicting unit 103 determines that a region with a smaller variance value obtained in the above way is a region with higher channel estimation accuracy. The channel estimation accuracy can be predicted at any time, or can be predicted only when a frame format has somewhat been changed.

Additionally, the channel estimation accuracy predicting unit 103 can predict the channel estimation accuracy of each LB through other approaches. For example, instead of dynamically predicting the channel estimation accuracy, the unit 103 can predict the channel estimation accuracy of each LB based on the channel estimation accuracy previously obtained. FIG. 3 is a diagram illustrating one example of a channel estimation accuracy information table for storing the channel estimation accuracy previously obtained. As illustrated in FIG. 3 , the table stores the channel estimation accuracy of each LB previously obtained for every frame format assumed, based on, such as a distance from an RS, so that the channel estimation accuracy predicting unit 103 can handle a plurality of frame formats with a light load.

Returning to the description of FIG. 1 , the priority table 104 is a table in which a priority is defined for each type of data and control information. FIG. 4A illustrates one example of the priority table 104 . In the example illustrated in FIG. 4A , the highest priority is given to MCS (Modulation and Coding Scheme) being control information for demodulation/decoding. Priorities gradually lower for allocation information being control information indicating which type of data or into which LB the control information is inserted, retransmission related information being control information for retransmission, normal data, and retransmitted data, in this order. Based on such priorities, MCS is inserted into an LB with high channel estimation accuracy, increasing the probability that data will be accurately demodulated/decoded.

FIG. 4B illustrates another example of the priority table 104 . In the example illustrated in FIG. 4B , the highest priority is given to retransmission related information, and priorities gradually lower for allocation information, MCS, retransmitted data, and normal data, in this order. Based on such priorities, control information and data that are related to retransmission are inserted into an LB with high channel estimation accuracy, increasing the probability that retransmission will be completed at one time.

Additionally, various patterns other than the above examples are possible for how to classify and give priorities to control information and data. For example, the data is classified into types that need or do not need immediate processing, and a priority of data that needs immediate processing is set to high, thereby preventing data that needs immediate processing from causing a transmission error and the processing of the data from being not performed immediately.

Alternatively, the priority table 104 can store multiple patterns of priority information, and the allocation determining unit 105 can dynamically switch, depending on a status, which pattern should be selected. For example, a pattern is typically used to give a priority to MCS; when data to be retransmitted exceeds a pre-determined amount, a pattern is used to give a priority to retransmission related information and retransmitted data. Otherwise, when data that needs immediate processing exceeds a pre-determined amount, a pattern is used to give a priority to the data that needs immediate processing. Such switching can achieve optimal transmission efficiency in each status.

›DESCRIPTION OF EMBODIMENTS · 2 of 3

The allocation determining unit 105 determines into which LB in a frame format the control information or data is inserted, based on channel estimation accuracy of each LB obtained by the channel estimation accuracy predicting unit 103 and priority information stored in the priority table 104 , and generates allocation information. More specifically, the allocation determining unit 105 determines an allocation such that a higher-priority type of control information or data is inserted into an LB with higher channel estimation accuracy.

FIG. 5 is a diagram illustrating one example of allocation information. As illustrated in FIG. 5 , in the allocation information, information is set indicating which type of control information or data is inserted into each LB in a frame format.

The scheduler 106 executes various controls necessary for uplink and downlink communications, based on, such as a result of demodulation/decoding by the uplink transmission frame demodulating/decoding unit 102 . For example, the scheduler 106 determines a demodulation and decoding scheme in an uplink communication, notifies the uplink transmission frame demodulating/decoding unit 102 as well as the transmission information generating unit 107 of MCS based on the determined scheme, and updates the MCS to be transmitted to a mobile terminal. Similarly, the scheduler 106 determines a demodulation and decoding scheme in a downlink communication, and notifies the data framing unit 108 and the data modulating unit 109 of the scheme.

The scheduler 106 further transfers allocation information generated in the allocation determining unit 105 to the control information modulating unit 111 , and put the allocation information into a downlink frame. Thus the downlink frame contains the allocation information, so that the mobile terminal is notified of the allocation in a frame format determined by the allocation determining unit 105 and the uplink communication can reflect the allocation.

The transmission information generating unit 107 is a processing unit for generating information to be transmitted by the base transceiver station 10 . The transmission information generating unit 107 includes a data generating unit 107 a for generating data based on information transmitted such as from a transmission apparatus (not illustrated), a control information generating unit 107 b for generating control information, and an RS generating unit 107 c for generating an RS.

The data framing unit 108 attaches CRC (Cyclic Redundancy Check) to the data generated in the data generating unit 107 a and encodes the result. The data modulating unit 109 modulates the data encoded by the data framing unit 108 . The control information framing unit 110 combines MCS, retransmission related information, allocation information, etc., attaches CRC to the combination and encodes the result. The control information modulating unit 111 modulates the control information encoded in the control information framing unit 110 .

The multiplexing unit 112 multiplexes the data modulated in the data modulating unit 109 , the control information modulated in the control information modulating unit 111 and the RS generated in the RS generating unit 107 c. The transmitting unit 113 transmits the signal multiplexed in the multiplexing unit 112 to the mobile terminal.

Next, the configuration of a mobile terminal 20 corresponding to the base transceiver station 10 illustrated in FIG. 1 will be described. FIG. 6 is a block diagram illustrating one example of the configuration of the mobile terminal 20 . As illustrated in FIG. 6 , the mobile terminal 20 includes a receiving unit 201 , a dividing unit 202 , a channel estimating unit 203 , a control information demodulating unit 204 , a control information decoding unit 205 , a data demodulating unit 206 , a data decoding unit 207 , an error detecting unit 208 , an uplink control information generating unit 209 , an uplink transmission frame framing unit 210 and a transmitting unit 211 .

The receiving unit 201 receives a frame transmitted from the base transceiver station 10 . The dividing unit 202 divides the frame received in the receiving unit 201 into data, control information and an RS. The channel estimating unit 203 obtains a channel estimate value from the RS obtained by the division in the dividing unit 202 .

The control information demodulating unit 204 demodulates the control information obtained by the division in the dividing unit 202 such as by the channel estimate value obtained in the channel estimating unit 203 . The control information decoding unit 205 decodes the control information demodulated in the control information demodulating unit 204 . The control information decoded in the control information decoding unit 205 contains allocation information.

The data demodulating unit 206 demodulates the data obtained by the division in the dividing unit 202 such as by the channel estimate value obtained in the channel estimating unit 203 or the control information decoded in the control information decoding unit 205 . The data decoding unit 207 decodes the data demodulated in the data demodulating unit 206 such as by the control information decoded in the control information decoding unit 205 . The error detecting unit 208 detects an error in the data decoded in the data decoding unit 207 such as by the CRC attached to the data.

The uplink control information generating unit 209 generates control information contained in an uplink frame based on, such as the control information decoded in the control information decoding unit 205 . The uplink transmission frame framing unit 210 inserts the control information generated in the uplink control information generating unit 209 , data generated in a processing unit (not illustrated) or an RS to an LB or SB to constitute an uplink frame, according to the allocation information contained in the control information decoded in the control information decoding unit 205 . The transmitting unit 211 transmits the uplink frame constituted in the uplink transmission frame framing unit 210 to the base transceiver station 10 .

›DESCRIPTION OF EMBODIMENTS · 3 of 3

Next, the operation of the base transceiver station 10 illustrated in FIG. 1 will be described. FIG. 7 is a sequence diagram illustrating a processing procedure of block insertion processing by the base transceiver station 10 illustrated in FIG. 1 . As illustrated in FIG. 7 , when the receiving unit 101 receives a frame, a received signal configuring the frame is transmitted to the uplink transmission frame demodulating/decoding unit 102 (step S 101 ). Then, the uplink transmission frame demodulating/decoding unit 102 is notified of MCS indicating a manner of demodulation/decoding by the scheduler 106 (step S 102 ).

The uplink transmission frame demodulating/decoding unit 102 demodulates/decodes a control signal and data contained in the received signal based on, such as the MCS, and notifies the channel estimation accuracy predicting unit 103 of each channel estimate value obtained through the process (step S 103 ). The channel estimation accuracy predicting unit 103 predicts the channel estimation accuracy of each LB based on, such as the notified channel estimate value, and notifies the allocation determining unit 105 of the prediction result (step S 104 ). The allocation determining unit 105 generates allocation information based on the notified channel estimation accuracy of each LB and priority information being set in the priority table 104 , and transmits the allocation information to the scheduler 106 (step S 105 ).

The uplink transmission frame demodulating/decoding unit 102 also notifies the scheduler 106 of information of the demodulation/decoding result (step S 106 ) The scheduler 106 generates information to control uplink communication based on the information notified by the uplink transmission frame demodulating/decoding unit 102 , and transmits the generated information to the transmission information generating unit 107 (step S 107 ) The scheduler 106 also transfers the allocation information transmitted from the allocation determining unit 105 to the control information framing unit 110 (step S 108 ).

The transmission information generating unit 107 generates control information based on the information transmitted from the scheduler 106 , and transmits the control information to the control information framing unit 110 (step S 109 ). The control information framing unit 110 combines the allocation information transmitted from the scheduler 106 and the control information transmitted from the transmission information generating unit 107 to generate control information for transmission, encodes and transmits the combination to the control information modulating unit 111 (step S 110 ). The control information modulating unit 111 modulates and transmits the control information to the multiplexing unit 112 (step S 111 ).

The transmission information generating unit 107 also generates data to be transmitted and transmits the data to the data framing unit 108 (step S 112 ). The data framing unit 108 encodes and transmits the data to the data modulating unit 109 (step S 113 ). The data modulating unit 109 modulates and transmits the data to the multiplexing unit 112 (step S 114 ). The transmission information generating unit 107 also generates and transmits an RS to the multiplexing unit 112 (step S 115 ).

The multiplexing unit 112 multiplexes the control information, data and RS into a downlink frame and delivers the frame to the transmitting unit 113 (step S 116 ).

As described in the above, according to this embodiment, a type of control information or data with a higher priority is inserted into a block with higher channel estimation accuracy. Therefore, the probability that the type of control information or data with a higher priority is normally transmitted can be increased, increasing the efficiency in transmission of whole data.

Further, according to this embodiment of the invention, allocation determined based on a priority and channel estimation accuracy is transmitted to a corresponding apparatus as part of control information, so that the allocation determined by a relevant communication apparatus can be reflected in communication control for the corresponding apparatus.

Still further, according to this embodiment, channel estimation accuracy is predicted from the variance of a channel estimate value, so that for any frame format in which the pilot information is inserted at any position, the channel estimation accuracy can be accurately predicted.

Furthermore, according to this embodiment, a priority is switched depending on communication status, so that transmission efficiency can be kept high in any status.

Although the present invention has been described to be applied to uplink communications in the above embodiment, it can be applied to downlink communications similarly. The present invention is available for various communication schemes such as TDMA (Time Division Multiple Access), FDMA (Frequency Division Multiple Access) or CDMA (Code Division Multiple Access).

All examples and conditional language recited herein are intended for pedagogical purposes to aid the reader in understanding the invention and the concepts contributed by the inventor to furthering the art, and are to be construed as being without limitation to such specifically recited examples and conditions, nor does the organization of such examples in the specification relate to a illustrating of the superiority and inferiority of the invention. Although the embodiment(s) of the present invention have been described in detail, it should be understood that the various changes, substitutions, and alterations could be made hereto without departing from the spirit and scope of the invention.

Claims as granted

22 claims

Log in to read the claims of this application.

Log in to unlock

Classifications

10 codes
IPC · International Patent Classification
Section H — Electricity
  • H04W72/54
  • H04W4/00
  • H04J3/24
  • H04L12/66
  • H04L12/28
USPC · US Patent Classification
370/329371/352371/331371/389371/349

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this application are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJan 2009Jul 2009Jan 2010Jul 2010Jan 2011Jul 2011Jan 2012Jul 2012Jan 2013Jul 2013Jan 2014Jul 2014USPTOApplicantNon-final rejectionNon-final rejectionResponse after non-finalRequest for continued examinationResponse after non-finalRequest for continued examination
USPTOApplicanthover for detail · click to open
Pendency
5.2 y
1,915 days filing → grant
Office actions
5
non-final + final
Responses
3
2 RCE
Examiner
Jung Park
art unit 2411 · TC 2400
Citations: 24 back · 29 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Documents

Log in to open the documents of this file: the application as filed, every office action and response, the notice of allowance.

Log in to unlock

Chain of title

⤢ drag to zoom20102012201420162018202020222024202620282030Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock