Inventor

Ashok Anand

Inventor
Niskayuna, NY, US

Overview

50→
Patents
1985–2021
Patent span
Mechanical engineering
Primary field (CPC F)

Patents· 50 as inventor

Public. Assignee & technology derived from the patent record. Each patent links to its LexDana page.

Y02Eprimary
Y02EReduction of greenhouse gas [ghg] emissions, related to energy generation, transmission or distribution20%
F02CGas-turbine plants17%
G06FElectric digital data processing16%
H04LTransmission of digital information, e.g. telegraphic communication13%
B01DSeparation5%
F01KSteam engine plants5%
F01DNon-positive displacement machines or engines, e.g. steam turbines4%
F05DIndexing scheme for aspects relating to non-positive-displacement machines or engines, gas-turbines or jet-propulsion plants4%
Y02PClimate change mitigation technologies in the production or processing of goods4%
C01BNon-metallic elements2%
PatentTitleYear
11,050,795Handling instant message disposition notification (IMDN) message in rich communication service (RCS) system202110,425,464Adaptive learning periods in HTML streaming201910,313,473Efficient processing of purge requests in content delivery network201910,227,920Gas turbine oxidant separation system201910,142,257Dynamic scaling of redundancy elimination middleboxes20189,934,059Flow migration between virtual network appliances in a cloud computing network20189,612,955'High-performance indexing for data-intensive systems'20179,549,040'First cache purge optimization handling of unavailable nodes'20179,548,884'Method and apparatus for providing a unified resource view of multiple virtual machines'20179,531,829'Smart hierarchical cache using HTML5 storage APIs'20169,458,014'Sytems and method for CO2 capture and H2 separation with three water-gas shift reactions and warm desulfurization'20169,438,504'Network routing system providing increased network bandwidth'20169,413,671'Scaling redundancy elimination middleboxes'20169,279,340'System and method for cooling gas turbine components'20169,223,504'Method and system for placement of logical data stores to minimize request response time'20159,163,561'Power plant emissions reduction'20159,104,462'Method and apparatus for providing traffic re-aware slot placement'20159,104,492'Cloud-based middlebox management system'20159,083,708'Asymmetric end host redundancy elimination for networks'20159,002,990'Fast cache purge in content delivery network'20158,991,149'Dry 3-way catalytic reduction of gas turbine NOX'20158,959,481'Determining system level dependencies'20158,943,838'Integrated turbomachine plant'20158,891,520'Scaling redundancy elimination middleboxes'20148,752,391'Integrated turbomachine oxygen plant'20148,720,179'Power plant including an exhaust gas recirculation system for injecting recirculated exhaust gases in the fuel and compressed air of a gas turbine engine'20148,509,237'Architecture and system for coordinated network-wide redundancy elimination'20138,397,482'Dry 3-way catalytic reduction of gas turbine NOx '20138,268,023'Water gas shift reactor system for integrated gasification combined cycle power generation systems'20128,261,280'Prevention of deadlock in a distributed computing environment'20128,252,091'CO2 recovery from IGCC power plants'20128,161,484'Prevention of deadlock in a distributed computing environment'20128,087,022'Prevention of deadlock in a distributed computing environment'20118,060,878'Prevention of deadlock in a distributed computing environment'20117,721,250'System and method for interactive and integrated software development process and phases'20107,665,291'Method and system for heat recovery from dirty gaseous fuel in gasification power plants'20107,472,377'Systems and methods for determining software package identity during a system build'20087,469,375'Systems and methods for managing error dependencies'20086,735,490'Method and system for automated integration of design analysis subprocesses'20046,543,234'Compressor discharge bleed air circuit in gas turbine plants and related method'20036,442,941'Compressor discharge bleed air circuit in gas turbine plants and related method'20026,237,320'Removal of inert gases from process gases prior to compression in a gas turbine or combined cycle power plant'20016,233,916'Method of using fuel gas expander in power generating plants'20016,216,436'Integrated gasification combined cycle power plant with kalina bottoming cycle'20016,216,441'Removal of inert gases from process gases prior to compression in a gas turbine or combined cycle power plant'20016,170,263'Method and apparatus for converting low grade heat to cooling load in an integrated gasification system'20016,167,692'Method of using fuel gas expander in power generating plants'20016,101,983'Modified gas turbine system with advanced pressurized fluidized bed combustor cycle'20004,785,622'Integrated coal gasification plant and combined cycle system with air bleed and steam injection'19884,503,681'State-of-the-art gas turbine and steam turbine power plant'1985

Career & activity timeline

Assembled from patent assignee/location history and declaration credentials.

1985–2019Patents assigned to GEN ELECTRIC (24)· patent assignee history
2000–2019Based in Niskayuna, NY, US· patent location history
2004–2016Based in Schenectady, NY, US· patent location history
2008–2015Patents assigned to IBM (9)· patent assignee history
2008–2015Based in New Delhi, IN· patent location history
2011–2016Patents assigned to ANAND ASHOK (12)· patent assignee history
2011–2017Based in Madison, WI, US· patent location history
2012–2015Patents assigned to ANAND ASHOK KUMAR (7)· patent assignee history
2014–2018Patents assigned to ALCATEL LUCENT (6)· patent assignee history
2015–2021Based in Bangalore, IN· patent location history

Inventor activity

Assignee and location history derived from the patent record.

Assignees
AssigneePatentsSpan
GEN ELECTRIC241985–2019
ANAND ASHOKself122011–2016
IBM92008–2015
ANAND ASHOK KUMARself72012–2015
ALCATEL LUCENT62014–2018
Locations
LocationPatentsSpan
Niskayuna, New York, US182000–2019
Bangalore, IN112015–2021
Madison, WI, US92011–2017
Schenectady, New York, US42004–2016
New Delhi, IN32008–2015