Robot for testing electric energy meter
Granted 2 Sep 2014 · 2 office actions
Current assignee: Electric Power Research Institute, Inc. · originally Mianyang Gocreat Technology Co., Ltd.
Law firm: Law firm · Log in to unlock
Attorney: Attorney · Log in to unlock
Inventors: Huang Tang, Tianlian Hu, Ke Zheng, Chao Tian +8 · Examiner: Patricia Palasik · AU 2918 · TC 2900
Life of the patent
7 dated eventsDescription
1 parts›FIG. 1 is a front view of a…
FIG. 1 is a front view of a robot for testing an electric energy meter according to the present application;
FIG. 2 is a rear view of the robot for testing an electric energy meter according to the present application;
FIG. 3 is a left view of the robot for testing an electric energy meter according to the present application;
FIG. 4 is a right view of the robot for testing an electric energy meter according to the present application;
FIG. 5 is a top view of the robot for testing an electric energy meter according to the present application;
FIG. 6 is a first perspective view of the robot for testing an electric energy meter according to the present application;
FIG. 7 is a second perspective view of the robot for testing an electric energy meter according to the present application;
FIG. 8 is an enlarged view of circle 8 of FIG. 1 of the robot for testing an electric energy meter according to the present application;
FIG. 9 is an enlarged view of circle 9 of FIG. 1 of the robot for testing an electric energy meter according to the present application;
FIG. 10 is an enlarged view of circle 10 of FIG. 3 of the robot for testing an electric energy meter according to the present application;
FIG. 11 is an enlarged view of circle 11 of FIG. 3 of the robot for testing an electric energy meter according to the present application;
FIG. 12 is an enlarged view of circle 12 of FIG. 3 of the robot for testing an electric energy meter according to the present application;
FIG. 13 is an enlarged view of circle 13 of FIG. 4 of the robot for testing an electric energy meter according to the present application; and,
FIG. 14 is an enlarged view of circle 14 of FIG. 4 of the robot for testing an electric energy meter according to the present application.
Claims
1 · 1 independent · depth 1Classifications
1 codesClaim changes
SoonSee which claims were amended, added or cancelled during examination, with every added and removed word marked.
The published claims of this patent are not paired with the granted ones in what we hold.
File wrapper
See the full prosecution history — every USPTO and applicant action on this file, in order.
Log in to unlockChain of title
See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.
Log in to unlockTerm & fees
See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.
Log in to unlockValidity challenges
See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.
Log in to unlockCitations
See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.
Log in to unlock