Tube
Granted 22 Sep 2009 · no office action yet
Assignee: Metzeler Schaum GmbH
Law firm: Law firm · Log in to unlock
Attorney: Attorney · Log in to unlock
Inventors: Volker Maidhof, Manfred Hohenhorst, Andreas Bauer, Barbara Puhane +1 · Examiner: Susan Bennett Hattan · AU 2915 · TC 2900
Life of the patent
5 dated eventsDescription
1 parts›FIG. 1 is a top front left perspective…
FIG. 1 is a top front left perspective view of a tube in accordance with my design;
FIG. 2 is a front right perspective view of a tube in accordance with my new design;
FIG. 3 is a bottom front right perspective view of a tube in accordance with my new design;
FIG. 4 is a top left perspective view of an assemblage of six tubes in accordance with FIG. 1 ; and,
FIG. 5 is a top plan view of a resilient support formed from a multiplicity of tubes in accordance with FIG. 1 .
The broken lines in the drawings depict environmental subject matter only and form no part of the claimed design.
Claims
1 · 1 independent · depth 1Classifications
2 codesClaim changes
SoonSee which claims were amended, added or cancelled during examination, with every added and removed word marked.
The published claims of this patent are not paired with the granted ones in what we hold.
File wrapper
See the full prosecution history — every USPTO and applicant action on this file, in order.
Log in to unlockChain of title
See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.
Log in to unlockTerm & fees
See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.
Log in to unlockValidity challenges
See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.
Log in to unlockCitations
See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.
Log in to unlock