Air conditioning duct for construction machine
Granted 10 Feb 2026 · no office action yet
Current assignee: Caterpillar Inc. · originally Caterpillar
Law firm: Law firm · Log in to unlock
Attorney: Attorney · Log in to unlock
Inventors: Zhen Li, Dongmei Li, Yingjie Yang, Yang Yang · Examiner: Ania Aman · AU 2914 · TC 2900
Life of the patent
3 dated eventsDescription
1 parts›FIG. 1 is a perspective view of an…
FIG. 1 is a perspective view of an air conditioning duct for construction machine showing our new design;
FIG. 2 is another perspective view thereof;
FIG. 3 is another perspective view thereof;
FIG. 4 is a front view thereof;
FIG. 5 is a rear view thereof;
FIG. 6 is a left side view thereof;
FIG. 7 is a right side view thereof;
FIG. 8 is a top view thereof; and,
FIG. 9 is a bottom view thereof.
Claims
1 · 1 independent · depth 1Classifications
1 codesClaim changes
SoonSee which claims were amended, added or cancelled during examination, with every added and removed word marked.
The published claims of this patent are not paired with the granted ones in what we hold.
File wrapper
Term & fees
See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.
Log in to unlockValidity challenges
See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.
Log in to unlockCitations
See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.
Log in to unlock