Cooler assembly
Granted 3 Feb 2026 · no office action yet
Current assignee: Alfa Laval Corporate Ab · originally Alfa Laval Inc.
Law firm: Law firm · Log in to unlock
Attorney: Attorney · Log in to unlock
Inventors: Aaron Bogle, Brandy Moore, Cosimo Pecchioli, Matt Krafft +1 · Examiner: Shawn T Gingrich · AU 2934 · TC 2900
Life of the patent
2 dated eventsDescription
1 parts›FIG. 1 is a front and left perspective…
FIG. 1 is a front and left perspective view of a cooler assembly showing our new design;
FIG. 2 is a left side view thereof;
FIG. 3 is a right side view thereof;
FIG. 4 is a rear plan view thereof;
FIG. 5 is a front view thereof;
FIG. 6 is a top view thereof;
FIG. 7 is a bottom view thereof;
FIG. 8 is a front and left perspective view of a cooler assembly showing a second embodiment of our new design;
FIG. 9 is a left side view thereof;
FIG. 10 is a right side view thereof;
FIG. 11 is a rear plan view thereof;
FIG. 12 is a front view thereof;
FIG. 13 is a top view thereof; and
FIG. 14 is a bottom view thereof;
FIG. 15 is a front and left perspective view of a cooler assembly showing a third embodiment of our new design;
FIG. 16 is a left side view thereof;
FIG. 17 is a right side view thereof;
FIG. 18 is a rear plan view thereof;
FIG. 19 is a front view thereof;
FIG. 20 is a top view thereof; and,
FIG. 21 is a bottom view thereof.
The broken lines in broken lines depict portions of the cooler assembly that form no part of the claimed design. All unshaded surfaces between solid and broken lines form no part thereof.
Claims
1 · 1 independent · depth 1Classifications
2 codesClaim changes
SoonSee which claims were amended, added or cancelled during examination, with every added and removed word marked.
The published claims of this patent are not paired with the granted ones in what we hold.
File wrapper
Term & fees
See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.
Log in to unlockWorldwide family
4 members · 2 offices›IP5 & PCT — 1 members
| Office | Publication | Kind | Published | Filed | Status | Title |
|---|---|---|---|---|---|---|
| USthis patent | US-D1111144-S | S1 | 3 Feb 2026 | 30 Dec 2022 | granted | Cooler assembly |
›Other offices — 3 members
| Office | Publication | Kind | Published | Filed | Status | Title |
|---|---|---|---|---|---|---|
| CA | CA-235210-S | S | 1 May 2025 | 27 Jun 2023 | granted | Cooler assembly |
| CA | CA-239808-S | S | 1 May 2025 | 27 Jun 2023 | granted | Cooler assembly |
| CA | CA-239809-S | S | 1 May 2025 | 27 Jun 2023 | granted | Cooler assembly |
Validity challenges
See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.
Log in to unlockCitations
See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.
Log in to unlock