USPatentGranted
S1

Optical fiber alignment member

Granted 9 Sep 2025 · no office action yet

Application
29/875,757
filed 10 May 2023
Publication
Not published
not published
Patent· this page
US D1092411
granted 9 Sep 2025

Life of the patent

2 dated events
⤢ drag to zoomApr 2023Jul 2023Oct 2023Jan 2024Apr 2024Jul 2024Oct 2024Jan 2025Apr 2025Jul 2025Oct 2025Prosecution
Prosecutionhover for detail · click to open

Description

1 parts
›FIG. 1 is a front view of an…

FIG. 1 is a front view of an optical fiber alignment member of our new design;

FIG. 2 is a rear view thereof;

FIG. 3 is a top plan view thereof;

FIG. 4 is a bottom view thereof;

FIG. 5 is a right side view thereof;

FIG. 6 is a left side view thereof;

FIG. 7 is a front perspective view thereof;

FIG. 8 is a rear perspective view thereof; and,

FIG. 9 is a front perspective view thereof in use.

The broken lines show portions of an optical fiber alignment member that form no part of the claimed design.

The alternate long and short dash lines are merely the boundary lines between the claimed parts and the non-claimed parts and form no part of the claimed design.

the grant prints no section headings; every part label below is ours, taken from that part's own first words

Claims

1 · 1 independent · depth 1
1 granted claims

Classifications

1 codes
USPC · US Patent Classification
D13/154

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

Pendency
2.3 y
853 days filing → grant
Office actions
0
on the grant's record
Examiner
George D. Kirschbaum
art unit 2936 · TC 2900
Citations: 8 back · 0 forward

Chain of title

⤢ drag to zoom20242026202820302032203420362038204020422044Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Worldwide family

2 members · 2 offices
US1JP1
this patentIP5 & PCTother officessolid = grantedhover for detail · click to open
Members
2
DOCDB simple family 85717904
Offices
2
US · JP
Granted
2 of 2
grant date present
Non-English titles
1
shown as filed, never translated
›IP5 & PCT — 2 members
OfficePublicationKindPublishedFiledStatusTitle
USthis patentUS-D1092411-SS19 Sep 202510 May 2023grantedOptical fiber alignment member
JPJP-1740469-SS30 Mar 202315 Nov 2022granted光ファイバ整列部材ja

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock