USPatentGranted
B2

Control valve assembly

Granted 22 Mar 2016 · 2 office actions

Life of the patent

3 dated events
⤢ drag to zoomJul 2012Jan 2013Jul 2013Jan 2014Jul 2014Jan 2015Jul 2015Jan 2016Prosecution
Prosecutionhover for detail · click to open

Abstract

A power machine and a power conversion system for a power machine are disclosed. In an exemplary embodiment, the power conversion system includes a pump configured to provide a source of pressurized hydraulic fluid and a control valve assembly to receive the hydraulic fluid. The control valve assembly includes a first valve element configured to direct hydraulic fluid to an actuator when the first valve element is in first and second actuated positions. The control valve assembly also includes a second valve element downstream of the first spool. The first valve element is moveable between an unactuated position and the first and second actuated positions and is configured to direct hydraulic fluid received from the actuator through the second actuated position to the second valve element and to direct hydraulic fluid received from the actuator through the first actuated position to bypass the second valve element.

Claims

19 · 3 independent · depth 3
12345678910111213141516171819
19 granted claims

Classifications

1 codes
IPC · International Patent Classification
Section F — Mechanical engineering; lighting; heating; weapons
  • F15B11/16

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

Pendency
3.8 y
1,390 days filing → grant
Office actions
1
non-final + final
Responses
2
1 RCE
Examiner
Logan Kraft
art unit —
Citations: 23 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20130318958 A15 Dec 2013

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock