USPatentGranted
B2

Method and a system for transmitting pilot

Granted 26 Jan 2016 · 4 office actions

Current assignee: Xi'an Zte New Software Company Limited · originally ZTE USA

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Guanghui Yu, Bo Dai, Peng Hao, Shuqiang Xia +2 · Examiner: Diane Lo · AU 2466 · TC 2400

Life of the patent

9 dated events
⤢ drag to zoom20122014201620182020202220242026202820302032ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

The disclosure discloses a method for transmitting a pilot, which includes the step of: selectively transmitting or not transmitting a demodulation pilot in a subframe according to a setting, in a control signaling, of triggering or not triggering a demodulation pilot transmission in the subframe. A system for transmitting the pilot is further disclosed, which includes a pilot selectively transmitting unit configured to selectively transmit or not transmit a demodulation pilot in a subframe according to a setting, in a control signaling, of triggering or not triggering a demodulation pilot transmission in the subframe. The method and system of the disclosure are capable of reducing the pilot overhead and improving the capacity of the LTE/LTE-Advanced system.

Claims

8 · 2 independent · depth 3
12345678
8 granted claims

Classifications

4 codes
IPC · International Patent Classification
Section H — Electricity
  • H04W28/12
  • H04W48/08
  • H04W28/06
  • H04L5/00

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJul 2011Jan 2012Jul 2012Jan 2013Jul 2013Jan 2014Jul 2014Jan 2015Jul 2015Jan 2016USPTOApplicantNon-final rejectionFinal rejection
USPTOApplicanthover for detail · click to open
Pendency
4.5 y
1,639 days filing → grant
Office actions
2
non-final + final
Responses
2
no RCE
Examiner
Diane Lo
art unit 2466 · TC 2400
Citations: 10 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20140029428 A130 Jan 2014

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock