USPatentGranted
B2

Control flow graph application configuration

Granted 13 Oct 2015 · 2 office actions

Life of the patent

9 dated events
⤢ drag to zoom20142016201820202022202420262028203020322034ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

An operating system may be configured using a control flow graph that defines relationships between each executable module. The operating system may be configured by analyzing an application and identifying the operating system modules called from the application, then building a control flow graph for the configuration. The operating system may be deployed to a server or other computer containing only those components identified in the control flow graph. Such a lightweight deployment may be used on a large scale for datacenter servers as well as for small scale deployments on sensors and other devices with little processing power.

Claims

17 · 3 independent · depth 4
1234567891011121314151617
17 granted claims

Classifications

2 codes
IPC · International Patent Classification
Section G — Physics
  • G06F9/45
  • G06F9/445

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJul 2013Oct 2013Jan 2014Apr 2014Jul 2014Oct 2014Jan 2015Apr 2015Jul 2015Oct 2015USPTOApplicantNon-final rejectionResponse after non-finalNotice of allowanceRequest for continued examination
USPTOApplicanthover for detail · click to open
Pendency
2.3 y
846 days filing → grant
Office actions
1
non-final + final
Responses
1
1 RCE
Examiner
Philip Wang
art unit 2197 · TC 2100
Citations: 33 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20130298112 A17 Nov 2013

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock