USPatentGranted
B2

Semiconductor device and method of manufacturing the semiconductor device

Granted 24 Mar 2015 · no office action yet

Life of the patent

3 dated events
⤢ drag to zoomOct 2012Jan 2013Apr 2013Jul 2013Oct 2013Jan 2014Apr 2014Jul 2014Oct 2014Jan 2015Apr 2015Prosecution
Prosecutionhover for detail · click to open

Abstract

An interlayer insulating film is formed. Then a first gate electrode and a second gate electrode are buried in the interlayer insulating film. Then, an anti-diffusion film is formed over the interlayer insulating film, over the first gate electrode, and over the second gate electrode. Then, a first semiconductor layer is formed over the anti-diffusion film which is present over the first gate electrode. Then, an insulating cover film is formed over the upper surface and on the lateral side of the first semiconductor layer and over the anti-diffusion film. Then, a semiconductor film is formed over the insulating cover film. Then, the semiconductor film is removed selectively to leave a portion positioned over the second gate electrode, thereby forming a second semiconductor layer.

Claims

13 · 1 independent · depth 3
12345678910111213
13 granted claims

Classifications

7 codes
IPC · International Patent Classification
Section H — Electricity
  • H01L23/522
  • H01L27/088
  • H01L29/66
  • H01L27/12
USPC · US Patent Classification
257/43257/72257/59

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

Pendency
2.3 y
855 days filing → grant
Office actions
0
after a restriction
Examiner
Tran Tran
art unit 2811 · TC 2800
Citations: 4 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20130153887 A120 Jun 2013

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock