USPatentGranted
B2

Power storage system including a plurality of battery modules and on/off devices or voltage converters

Granted 3 Dec 2013 · 2 office actions

Life of the patent

7 dated events
⤢ drag to zoom20082010201220142016201820202022202420262028ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

An object is to reliably conduct cell balancing operation while suppressing deterioration of batteries and maintaining operating efficiency. When the cell balance control by the cell balancing circuit 3 is started, the system control device 30 sets an on/off device corresponding to the arm where the cell balance control is conducted to the open state; and when the cell balance control is completed, and the difference between the terminal voltage of a battery pack of the arm where the cell balance control has been conducted and the terminal voltages of the battery packs of the other arms falls within a preset allowable range, sets the on/off device, which has been in the open state, to the closed state.

Claims

18 · 3 independent · depth 3
123456789101112131415161718
18 granted claims

Classifications

2 codes
IPC · International Patent Classification
Section H — Electricity
  • H01M10/46
USPC · US Patent Classification
320/116

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJan 2009Jul 2009Jan 2010Jul 2010Jan 2011Jul 2011Jan 2012Jul 2012Jan 2013Jul 2013Jan 2014USPTOApplicantNon-final rejectionResponse after non-final
USPTOApplicanthover for detail · click to open
Pendency
5.1 y
1,860 days filing → grant
Office actions
1
non-final + final
Responses
2
no RCE
Examiner
Edward Tso
art unit 2859 · TC 2800
Citations: 20 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20110127964 A12 Jun 2011

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock