USPatentGranted
B2

Control system to manage and optimize a geothermal electric generation system from one or more wells that individually produce heat

Granted 18 Jun 2013 · 2 office actions

Assignee: METCOFF, JERROLD M.

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Michael J. Parrella · Examiner: Christopher Jetton

Life of the patent

4 dated events
⤢ drag to zoomJul 2008Jan 2009Jul 2009Jan 2010Jul 2010Jan 2011Jul 2011Jan 2012Jul 2012Jan 2013Jul 2013Prosecution
Prosecutionhover for detail · click to open

Abstract

A control system manages and optimizes a geothermal electric generation system from one or more wells that individually produce heat. The control system includes heat sensors that measure temperature and fluid flow and are placed at critical points in the wells, in piping, in a hot fluid reservoir, in a cold fluid reservoir and in a cooling system. The control system also includes pump and valve controls, generator controls, a network for gathering information and delivering instructions, and a processing module that collects information and communicates control information to each component.

Claims

22 · 1 independent · depth 3
12345678910111213141516171819202122
22 granted claims

Classifications

4 codes
IPC · International Patent Classification
Section F — Mechanical engineering; lighting; heating; weapons
  • F03G7/00
  • F01K7/40
USPC · US Patent Classification
60/641.260/667

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

Pendency
3.9 y
1,413 days filing → grant
Office actions
1
non-final + final
Responses
2
no RCE
Interviews
1
examiner interview summaries
Examiner
Christopher Jetton
art unit —
Citations: 86 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

2 priority documents
Priority
5 Aug 2008
earliest claimed
›Priority documents — 2
TypeDocumentDate
provisionalUS 611379565 Aug 2008
related publicationUS 20100269501 A128 Oct 2010

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock