USPatentGranted
B1

Comprehending a circuit design

Granted 4 Jun 2013 · 2 office actions

Application
12/797,471
filed 9 Jun 2010
Publication
Not published
not published
Patent· this page
US 8,458,621
granted 4 Jun 2013

Life of the patent

3 dated events
⤢ drag to zoomJul 2009Jan 2010Jul 2010Jan 2011Jul 2011Jan 2012Jul 2012Jan 2013Jul 2013Prosecution
Prosecutionhover for detail · click to open

Abstract

An executable circuit design is used to generate waveforms, from which behaviors of the circuit are captured. The behaviors and various combinations thereof can then be saved in a database, along with descriptions and other metadata about them, thereby generating a behavioral index of the circuit design code. Behavioral indexing of circuit designs allows a user to maintain an indexed behavior database, track changes in behaviors as the circuit design\'s executable description evolves, and figure out how the executable description can be reused in different projects. When applied to digital design development, it facilities the current design and verification effort, as well as design reuse down the line.

Claims

16 · 3 independent · depth 2
12345678910111213141516
16 granted claims

Classifications

3 codes
IPC · International Patent Classification
Section G — Physics
  • G06F17/50
USPC · US Patent Classification
716/51716/136

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

Pendency
3.0 y
1,091 days filing → grant
Office actions
1
non-final + final
Responses
1
2 RCE
Interviews
1
examiner interview summaries
Examiner
Paul Dinh
art unit 2825 · TC 2800
Citations: 52 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
Priority
9 Jun 2009
earliest claimed
›Priority documents — 1
TypeDocumentDate
provisionalUS 611855489 Jun 2009

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock