USPatentGranted
B2

Method for scheduling distributed virtual resource blocks

Granted 25 Sep 2012 · 2 office actions

Current assignee: Optis Cellular Technology, LLC · originally LG Electronics

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Dong Youn Seo, Joon Kui Ahn, Bong Hoe Kim, Eun Sun Kim · Examiner: Ayaz Sheikh · AU 2476 · TC 2400

Life of the patent

12 dated events
⤢ drag to zoom20102015202020252030ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

A method for efficiently scheduling virtual resource blocks to physical resource blocks is disclosed. In a wireless mobile communication system that supports a resource block group (RBG) allocation scheme, for distributed mapping of consecutively allocated virtual resource blocks to physical resource blocks, there is proposed a mapping method capable of increasing the number of distributed virtual resource blocks to a maximum while satisfying gap limitations, when the length of the physical resource blocks is different from the length of the distributed virtual resource blocks. Also, the number of distributed virtual resource blocks and the structure of an interleaver are limited for efficient scheduling.

Claims

12 · 4 independent · depth 4
123456789101112
12 granted claims

Classifications

6 codes
IPC · International Patent Classification
Section H — Electricity
  • H04B7/212
USPC · US Patent Classification
370/442370/473370/480370/392370/341

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomApr 2010Jul 2010Oct 2010Jan 2011Apr 2011Jul 2011Oct 2011Jan 2012Apr 2012Jul 2012Oct 2012USPTOApplicantNon-final rejectionNotice of allowanceRequest for continued examination
USPTOApplicanthover for detail · click to open
Pendency
2.5 y
896 days filing → grant
Office actions
1
non-final + final
Responses
2
2 RCE
Examiner
Ayaz Sheikh
art unit 2476 · TC 2400
Citations: 57 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

2 priority documents
Priority
7 Jan 2008
earliest claimed
›Priority documents — 2
TypeDocumentDate
provisionalUS 610195897 Jan 2008
related publicationUS 20100195612 A15 Aug 2010

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock