USPatentGranted
B2

Power converter with power switch operable in controlled current mode

Granted 1 May 2012 · 6 office actions

Current assignee: Barclays · originally Enpirion, Inc.

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Douglas D. Lopata, Ashraf W. Lotfi · Examiner: Shawn Riley · AU 2838 · TC 2800

Life of the patent

15 dated events
⤢ drag to zoom20102012201420162018202020222024202620282030ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

A power converter and method of controlling a power switch therein to improve power conversion efficiency at low output current. In one embodiment, the power converter includes a first power switch coupled to a source of electrical power and a second power switch coupled to the first power switch and to an output terminal of the power converter. The power converter also includes a controller configured to alternately enable conduction of the first and the second power switches with a duty cycle in response to an output characteristic of the power converter. The controller is configured to control a level of current in the first power switch when the second power switch is substantially disabled to conduct.

Claims

20 · 3 independent · depth 2
1234567891011121314151617181920
20 granted claims

Classifications

3 codes
IPC · International Patent Classification
Section G — Physics
  • G05F3/613
USPC · US Patent Classification
323/224323/284

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomApr 2010Jul 2010Oct 2010Jan 2011Apr 2011Jul 2011Oct 2011Jan 2012Apr 2012Jul 2012USPTOApplicantNon-final rejectionResponse after non-finalResponse after finalRequest for continued examinationResponse after non-finalRequest for continued examination
USPTOApplicanthover for detail · click to open
Pendency
2.2 y
788 days filing → grant
Office actions
3
non-final + final
Responses
3
2 RCE
Examiner
Shawn Riley
art unit 2838 · TC 2800
Citations: 129 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20100156374 A124 Jun 2010

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock