USPatentGranted
A

B S & W measuring means and method

Granted 5 Oct 1993 · no office action yet

Current assignee: Hartwell Industries, Inc. · originally Texaco Inc.

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Percy T. Cox · Examiner: Hezron E. Williams · AU 265 · TC 2600

Application
811633
filed 23 Dec 1991
Publication
Not published
not published
Patent· this page
US 5,249,455
granted 5 Oct 1993

Life of the patent

2 dated events
⤢ drag to zoomJan 1992Apr 1992Jul 1992Oct 1992Jan 1993Apr 1993Jul 1993Oct 1993Prosecution
Prosecutionhover for detail · click to open

Abstract

A water cut meter includes a test cell through which a petroleum stream will flow. The test cell includes an outer shell, a sensor probe which cooperates with the outer shell to form a sensor capacitor with the flow of the petroleum stream as the dielectric and a reference probe surrounded with pure oil as the dielectric to form a reference capacitor. Processing apparatus includes a comparator network electrically connected to the sensor capacitor and to reference capacitor which compares the capacitance of the sensor capacitor with the capacitance of the reference capacitor. The comparator network provides a signal corresponding to the capacitance difference between the sensor and reference capacitors. An output circuit connected to the comparator network provides an output corresponding to the water cut of the petroleum stream in accordance with the signal from the comparator network.

Description

5 parts
›BACKGROUND OF THE INVENTION

1. Field of the Invention

The present invention relates to the water cut metering means and method in general, and more particularly, to a BS&W metering means and method.

›SUMMARY OF THE INVENTION

A water cut meter includes a test cell through which a petroleum stream will flow. The test cell includes an outer shell, a sensor probe which cooperates with the outer shell to form a sensor capacitor with the flow of the petroleum stream as the dielectric and a reference probe surrounded with pure oil as the dielectric to form a reference capacitor. Processing apparatus includes a comparator network electrically connected to the sensor capacitor and to reference capacitor which compares the capacitance of the sensor capacitor with the capacitance of the reference capacitor. The comparator network provides a signal corresponding to the capacitance difference between the sensor and reference capacitors. An output circuit connected to the comparator network provides an output corresponding to the water cut of the petroleum stream in accordance with the signal from the comparator network.

The objects and advantages of the invention will appear more fully hereinafter from a consideration of the detailed description which follows, taken together with the accompanying drawings wherein two embodiments of the invention are illustrated by way of example. It is to be expressly understood, however, that the drawings are for illustration purposes only and are not to be construed as defining the limits of the invention.

›DESCRIPTION OF THE DRAWINGS

FIG. 1 is a drawing of a BS&W meter constructed in accordance with the present invention.

FIG. 2 is a detailed block diagram of one embodiment of the electronic processing equipment shown in FIG. 1.

FIG. 3 is a detailed block diagram of a second embodiment of the electronic processing equipment shown in FIG. 1.

FIG. 4 is a detailed block diagram of the measurement electronics block shown in FIG. 3.

FIG. 5 is a flow diagram representing the operation of the second embodiment.

›DESCRIPTION OF THE INVENTION · 1 of 2

Referring to FIG. 1 there is shown a probe 5, which may be made of aluminum, held in position by a probe mount 8, which may be made of teflon or some other non conductive material. Attached to probe 5 is a probe tip 14, also made of teflon, and held in place by threads 20. A housing 26 has male threads 27 and 30 and a multiplicity of internal passageways 35 for permitting the flow of a petroleum stream. Probe 5 has a smaller diameter 50 which is connected to a right angle adapter 53. Adapter 53 is connected to another rod 57. Rod 57 is connected electrically to electronic processing equipment 64. Thus, there is an electrical conductive path from probe 5 to equipment 64. Probe 5 is covered with a thin heat shrinkable coating made of Kynar. Electronic processing equipment 64 is connected to ground 66.

A cylinder 72 having a body 76 is threaded onto housing 26. An end cap 80 is threaded to body 76. Dry oil of the type expected to be found in the petroleum stream is inserted through the opening in cylinder 72 and then sealed by end cap 80. Dry oil is defined as oil with no substantial water present. End cap 80 may also have a pressure equalization chamber so that no pressure difference exists across the cylinder wall.

A sensing probe 90, similar to probe 5, is held by a teflon probe mount 93. A probe tip 97 is attached to probe 90 by threads 103. The small diameter 107 of probe 90 connects to a right angle adapter 110. Right angle adapter 110 is connected to another rod 115 which is in turn is connected to electronic processing equipment 64.

Probe tips 14 and 97 are sealed with probes 5 and 90 respectively with O rings 120. Similarly probe 5 and 90 are sealed with probe mounts 8 and 93 respectfully with O rings 123. The large diameters of Probes 5 and 90 are covered with heat shrinkable coatings of Kynar.

Test cell 130 has a sleeve 135 connected to ground 66. It should be noted that sleeve 135 is sized at one end to a pipeline size and the other end to accommodate housing 26. In between sleeve 135 has a 2" inside diameter through a measurements section, that is the section in which probe 90 is located. Sleeve 135 is also manufactured to utilize a victaulic connection or, in the alternative, a flange may be attached to sleeve 135.

Sleeve 140 is threaded onto housing 26, and like sleeve 135 has adaption for victaulic connection or may also have a flange mounting attached to it. Thus, test cell 130 may be connected in line to a pipeline carrying the petroleum stream. The test cell may be mounted vertically so that gravity does not affect the flowing petroleum stream in a manner which would cause separation of oil and water. This promotes uniformity of the fluid by preventing fluid segregation.

With reference to FIG. 2, electronic processing equipment 64 includes a 20 MHz oscillator 200. Although a preferred frequency of 20 MHz is used, any frequency within a range of frequencies from 100 KHz to 200 MHz may be used. Oscillator 200 is connected to ground 66 as is all other units in electronic processing equipment 64 so that the signal path is with respect to ground 66. Oscillator 200 provides a signal to a driver/amplifier 206. The output of driver amplifier 206 is provided to a bridge circuit 208 comprising a variable capacitor 210, a fixed capacitor 214 and capacitors 90C and 5C which represent sensor probes 90 and 5 respectively. Outputs 216 and 217 of bridge circuit 208 are connected to a mixer 220. Any difference in capacitance between the measurement probe 90 and the reference probe 5 causes an unbalance in bridge 208 and generates an output signal, which is applied to mixer 220. This difference in capacitance is caused by water in the petroleum stream.

A local oscillator 222 provides a 19.998 MHz beat frequency signal to mixer 220, so that the signal from the output of bridge circuit 208 is hetrodyned to an intermediate frequency of 2 KHz. The output of mixer 220 is provided to an intermediate frequency amplifier 224. The signal from amplifier 224 is converted to a DC voltage E out by a precision rectifier 230.

The DC voltage from precision rectifier 230 is converted to digital signals by an A to D converter 236. The digital signals are provided to an EPROM means 240. EPROM means 240 is a programmable memory which converts the measured output voltage into a percent water cut using the previously stored data relating water cut to voltage (E out ). EPROM means 240 provides a digital output to a digital to analog converter 245, which in turns provides a 4-20 milliamp output as the water cut signal E wc . It should be noted that the digital signals from EPROM means 240 may be used directly as a digital output of water cut.

Referring now to FIG. 3, there is shown another embodiment of the present invention in which reference probe 5 and measurement probe 90 are connected to measurement electronics 250. Measurement electronics 250 provides a voltage signal V, a current signal I, and a phase signal PH to microprocessor means 255 which in turns provides a voltage V r to measurement electronics 250. Obviously, in order for the measurements to work, all of the units measurement electronics 250 and is measured with respect to ground 66 as well as microprocessor means 255.

With reference to FIG. 4, relay means 260 is controlled by voltage V r . It should be noted that elements having the same number as elements in FIG. 2 are the same elements. Further, that elements having the same numeric designation but with an alpha suffix operate in the same manner as elements having the same numeric designation without an alpha suffix. Relay means 260 is connected to a current measuring resistor 263 at a connection 265. Oscillator means 200 is connected to resistor 263 at a connection 273. A voltage appearing at connection 265 is provided to an amplifier 268 and to a difference amplifier 269. A voltage appearing at connection 273 is also provided to difference amplifier 269 whose output then corresponds to the current flowing through resistor 263.

›DESCRIPTION OF THE INVENTION · 2 of 2

The outputs from amplifiers 268 and 269 are provided to mixers 220 and 220A, which are receiving a signal from local oscillator means 222. The outputs from mixers 220 and 220A are provided through IF amplifiers 224 and 224A, respectively. The outputs from amplifiers 224 and 224A are provided to precision rectifiers 230 and 230A, respectively, which in turn rectifies them to provide the voltage signal V and the current signal I, respectively.

The outputs from amplifiers 224, 224A are also provided to zero crossing detectors 280 and 280A, respectively. Zero crossing detectors 280, 280A are responsive to the outputs from amplifiers 224 and 224A, respectively, to provide a rectangular voltage output to a flip-flop 284. Flip-flop 284, responsive to the signals from zero crossing detector 280 and 280A, provides a signal out which is related to the phase difference between the voltage signal V and the current signal I. The signal from flip-flop 284 is integrated by an integrating means 290 to provide a D.C. signal, corresponding to the phase difference, to a D.C. amplifier 293, where it is amplified and provided as signal PH.

The sequence of operation can be seen in FIG. 5, where block 300 represents the starting of the process. The next step is in initialize the system which is represented by block 304, followed by the SET V r =5 volts. The statement V r =5 volts means that relay 260 connects the reference probe 5 to the other electronic elements in measuring electronics 250. The next block 310 is just a representation to continue with the voltage V r =5, and we proceed to block 312 which is to acquire both signals V,I and as noted previously refers to the voltage and current measurements.

The next step, as represented by block 315, is to calculate the average V,I which is done by repetitively sampling V,I until the number of samples equals 50. This is indicated by block 320, "#SAMP=50?". If the answer to that question is "No", we go back to block 310 and continue until there are 50 samples. At that time, the answer to block 320 is "Yes", and we proceed to block 324 which is to calculate Z reference (Z REF ). Proceeding to the next block 326, "SET V r =0". With V r at zero, relay means 260 connects measurement probe 90 to the electronic elements in measurements electronics 250.

Block 330 is similar to block 310, it indicates to continue. Again, we acquire V,I as proposed by block 332 and again, we proceed to blocks 335 which is to calculate the average of V,I and this again is accomplished through block 340 which asks the same question as block 320. Again, if the answer is that the number of samples does not equal 50, we return to block 330 to continue acquiring V,I until we have 50 samples. When the answer is "Yes", we proceed to block 344 "calculate Z measurement".

Block 350 requires the determination of Z difference (Z DIFF ) between Z reference and Z measurement. The water cut WC is then determined by block 355 where A and B are empirically derived constants. We then proceed to block 360 which asks the question, "#MEAS=2048 ". The answer is that we have not made 20 measurements and we return to the continue block 330. If the answer is "Yes", we proceed to block 370 SET V r =5. The process then loops back to block 310 to continue measuring.

From the foregoing we can see that we sample V,I 50 times and use an average sample for the measurement probe and also for the reference probe. When we obtain the difference measurement, we repeat the measurements until we have 20 measurements. Then we start the process all over again by commanding relay 260 to disconnect the measurement probe 90 and to reconnect the reference probe 5.

As noted earlier, there is another signal that we have not discussed and that is signal PH. Signal PH relates to the phase difference between the voltage signal and the current signal. This signal is not necessary to the calculation of the water cut. However, as noted previously, the present invention is a BS&W meter which normally is used in oil continuous measurements, that is, the phase of the petroleum stream being monitored is oil continuous. However, if too much water occurs in the stream, so that the stream switches over to the water continuous phase, then the measurements would be invalid. Signal PH may be used and is used to notify the operator that there is too much water in the petroleum stream and that the measurements are therefore invalid measurements. It may be used in a number of ways which may include an alarm mechanism, a print out tied in with the print out of the water cuts to show that they are inaccurate, or it may even be used to blank out the water cut signal.

Claims

21 · 3 independent · depth 5
123456789101112131415161718192021
21 granted claims

Classifications

5 codes
IPC · International Patent Classification
Section G — Physics
  • G01N27/22
  • G01N33/28
USPC · US Patent Classification
730/614.4324/689730/616.1

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

Pendency
1.8 y
652 days filing → grant
Office actions
0
on the grant's record
Examiner
Hezron E. Williams
art unit 265 · TC 2600
Citations: 9 back · 19 forward

Chain of title

⤢ drag to zoom19921994199619982000200220042006200820102012Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Worldwide family

15 members · 9 offices
US1EP3JP1AU2CA1DE2DK1ES1NO3
this patentIP5 & PCTother officessolid = grantedhover for detail · click to open
Members
15
DOCDB simple family 25207102
Offices
9
US · EP · JP
Granted
7 of 15
grant date present
Non-English titles
8
shown as filed, never translated
›IP5 & PCT — 5 members
OfficePublicationKindPublishedFiledStatusTitle
USthis patentUS-5249455-AA5 Oct 199323 Dec 1991grantedB S & W measuring means and method
EPEP-0549157-A2A230 Jun 19931 Dec 1992publishedWater percentage meter and method
EPEP-0549157-A3A323 Feb 19941 Dec 1992publishedno title held
EPEP-0549157-B1B128 May 19971 Dec 1992grantedAppareil et méthode pour la mesure du pourcentage de l'eaufr
JPJP-H05332982-AA17 Dec 199322 Dec 1992publishedWater percentage meter and measuring method therefor
›Other offices — 10 members
OfficePublicationKindPublishedFiledStatusTitle
AUAU-3030492-AA24 Jun 199318 Dec 1992publishedWater percentage meter and method
AUAU-669137-B2B230 May 199618 Dec 1992grantedWater percentage meter and method
CACA-2083190-A1A124 Jun 199318 Nov 1992publishedB s & w measuring means and method
DEDE-69220018-D1D13 Jul 19971 Dec 1992grantedVerfahren und Vorrichtung zum Messen des Wasserprozentsatzesde
DEDE-69220018-T2T225 Sep 19971 Dec 1992grantedVerfahren und Vorrichtung zum Messen des Wasserprozentsatzesde
DKDK-0549157-T3T31 Dec 19971 Dec 1992grantedApparat og fremgangsmåde til måling af vandprocentda
ESES-2102473-T3T31 Aug 19971 Dec 1992grantedAparato y procedimiento para medir el porcentaje de agua.es
NONO-924919-D0D018 Dec 199218 Dec 1992publishedMaaler for aa bestemme vanninnholdet i en fluidstroem samt fremgangsmaate dervedno
NONO-924919-LL24 Jun 199318 Dec 1992publishedMaaler for aa bestemme vanninnholdet i en fluidstroem samt fremgangsmaate dervedno
NONO-304622-B1B118 Jan 199918 Dec 1992publishedAnordning for Õ bestemme vanninnholdet i en petroleumstr°mno

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock