Method for predicting and controlling awater level of a series water conveyance canal on a basis of a fuzzy neural network

Granted 15 Jul 2025 · 2 office actions

Life of the patent

8 dated events
⤢ drag to zoom20222024202620282030203220342036203820402042ProsecutionOwnershipTerm & fees
ProsecutionOwnershipTerm & feeshover for detail · click to open

Description

6 parts
›FIELD

The present invention relates to the technical field of real time control of the water level of canal, in particular to a method for predicting and controlling a water level of a series water conveyance canal on the basis of a fuzzy neural network.

›BACKGROUND

The control target of canal water conveyance is to provide users with safe and reliable water supply services. However, the stability of water conveyance is controlled by the water level at some points. These points are commonly referred to as control points of canal operation, and maintaining the water level stability at the control points is the primary condition for the safe operation of the canal. The water level control is mainly accomplished by the control buildings in the middle and entrance of the canal pool. The water level control of the canal pool mainly depends on the real-time water level information. In the traditional sense, the canal operation control basically depends on manual operation, and the control process completely depends on the operation experience of sluice operators. There are many obvious drawbacks in this operation mode. There are many subjective factors in the regulation and control process of the regulating sluice, and it is difficult to accurately control the water volume, which can easily lead to abandoned water or insufficient water supply.

Therefore, at present, the open canal water conveyance project is developing towards realizing unattended and automatic operation. The basis of open canal automatic control is open canal control algorithm and open canal control model. In the aspect of open canal control algorithms, there are currently classic PI control algorithm, as well as advanced optimal control algorithm, predictive control algorithm, and robust control algorithm. In the aspect of open canal control models, which mainly comprises a linearized Saint-Venant equations control model and a simplified linear control model. The advantage and disadvantage of the control models and the control algorithms directly affect the control level of the control system. In the aspect of control algorithms, predictive control algorithm has been proved that its control theory and its control performance in practical engineering are much higher than other control algorithms. In the aspect of the research of open canal control, the dominating factor for restricting the control effect of open canal control system lies in the accuracy of control models. The control models are required to reflect the relationship between the control input of the research object and the control target, and they also require a certain degree of fast calculation. The open canal simulation equation, Saint-Venant equations has been proved to be able to well simulate the changing trend of water level and water flow in the canal pool, therefore, this equation can be used to deduce the relationship between water level and water flow in the canal pool. However, due to the nonlinear and differential characteristics of the Saint-Venant equations, there will be a huge number of calculation problems during the process of solving and applying the control algorithms, so this equation cannot be directly used as the control model. Regarding the differential characteristic of Saint-Venant equations, linearization processing is mainly used at present, but even the control model obtained by linearizing Saint-Venant equations has complicated equations. At present, the research mainly focuses on the construction of the control model of a single canal pool, which can not be applied to the actual multi-series canal pool project. The simplified linear control model is the most commonly used control model at present. It assumes that the water level and water flow of a single canal pool keep a linear relationship, and it is a steady relationship. The equation describing this relationship is an integral time-delay model. A control model describing the relationship between the control water level target and the control water flow change value of multi-canal pool can be constructed by processing the integral time-delay model in detail. However, there are a series of problems in the utilization of this simplified linear control model. First, it is difficult to determine the parameters of the steady linear relationship between the canal pool and the water level and water flow of the integral time-delay model; second, the integral time-delay model is too simplified, which assumes that there is a steady linear relationship between the canal pool and the water level and water flow, and this basic assumption is not valid when the water conveyance working condition of the canal pool changes greatly; third, the control action quantity here is the sluice water flow, and it is necessary to further convert the sluice water flow into the sluice opening degree. These problems limit the practicability of the simplified linear control model.

Therefore, it is urgent to find a method for predicting and controlling a water level to solve the above technical problems.

›SUMMARY

The present invention is intended to provide a method for predicting and controlling a water level of a series water conveyance canal on the basis of a fuzzy neural network, so as to solve the aforementioned problems existing in the prior art.

In order to achieve the foregoing objectives, the following technical solutions are used in the present invention:

a method for predicting and controlling a water level of a series water conveyance canal on the basis of a fuzzy neural network, comprises the following steps:

S 1 , establishing a multi-input single-output fuzzy neural network, and training the fuzzy neural network on the basis of operation data of the canal, so as to obtain a fuzzy neural network prediction model that can perform prediction on the water level of a canal pool on the basis of a sluice opening degree value and an initial water level;

S 2 , constructing an upstream water level controller of a coupled predictive control algorithm on the basis of the fuzzy neural network prediction model in step S 1 ;

S 3 , solving an optimal control rate of the upstream water level controller using a gradient optimization algorithm, on the basis of a control target of the upstream water level controller constructed in step S 2 ; and

S 4 , generating a control strategy by collecting actually measured water level change information and multiplying the actually measured water level change information by the optimal control rate on the basis of the optimal control rate solved in step S 3 .

Preferably, the multi-input single-output fuzzy neural network established in step S 1 specifically comprises four layers, wherein:

a first layer is an input layer, which is provided with k neurons and represents the number of dimensions of input variables, and the formula of the input layer is as follows

x i =u i   (1)

wherein i=1, 2, . . . , k, ui is the ith input value, and x=[x1, x2, . . . , xk] is an output vector;

a second layer is a radial basis layer, which is provided with p neurons to blur the input and an output of the layer is the product of a membership function, and an output of the neurons is shown in formula (2):

wherein j=1, 2, . . . , p, x=[x1, x2, . . . , xk] is an input of the fuzzy neural network layer; CJ=[C1j, C2j, . . . , CKj], σj=[σ1j, σ2j, . . . , σKj] are a center vector and width vector of the jth neuron respectively, ϕj is an output value of the jth neuron and P is the number of neurons in the layer;

a third layer is a regular layer, which also provides with p neurons, and an output form thereof is shown in formula (3):

wherein 1=1, 2, . . . , p, v1 is the first output, and v=[v1, v2, . . . , VP]T is the output vector;

and a fourth layer is the output layer, and a fitting method of the output layer uses a weighting factor method, and the calculation formula is shown in formula (4):

wherein w=[W1, W2, . . . , WP] T is an output weight vector, and v is the output vector of the regular layer.

Preferably, input layer variables of the neural network prediction model constructed in step S 1 are shown in formula (5):

x ( t )=[ y ( t− 1), . . . , y ( t−n y ), u ( t− 1− t d ), . . . , u ( t−n u −t d )] T   (5);

output layer variables are shown in formula (6),

y ( t )=[ y ( t+ 1), y ( t+ 2), . . . , y ( t+H p )] T   (6).

Preferably, an objective function of the upstream water level controller constructed in step S 2 is shown in formula (7):

H u is a control duration, which meets H u ≤H p ; an object y(t+i) is a predicted output variable, that is, a predicted upstream water level; ŷ(t) is a target value of the output variable, that is, an upstream target water level; u(t) is a sluice opening degree; Δu(t) is a control variable, which is the increment of u(t), that is, the change of the sluice opening degree; and W i y and W j u are a weighting coefficient of the i-step output variable and the j-step control variable, respectively.

Preferably, the process of the gradient optimization in step S 3 comprises the following steps:

S 31 , minimizing the objective function of the upstream water level controller, as shown in Formula 8:

S 32 , according to a gradient algorithm theory, calculating the optimal control rate of the upstream water level controller is calculated using formula (9):

wherein η2 is a learning rate of the control input and calculate a partial derivative of the objective function J(u(t)) with respect to u(t), so as to obtain

wherein ∂ŷ(t)/∂u(t) is a Jacobian matrix, which is calculated by the fuzzy neural network model.

The present invention has the following beneficial effects:

The present invention discloses a method for predicting and controlling a water level of the series water conveyance canal on the basis of a fuzzy neural network, the method, performing the relationship between a sluice opening degree and an open canal control water level by means of a fuzzy neural network, and constructing an upstream water level controller of a coupled predictive control algorithm; solving an optimal control rate of the upstream water level controller using a gradient optimization algorithm on the basis of a control target of the upstream water level controller; and generating a control strategy by collecting actually measured water level change information and multiplying the actually measured water level change information by the optimal control rate on the basis of the solved optimal control rate, thereby fulfilling the object of accurate predicting and controlling the water level.

›BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a structural diagram of a fuzzy neural network used in embodiment 1;

FIG. 2 is a schematic diagram of a sluice water level control scheme based on the fuzzy neural network in FIG. 1 in embodiment 1;

FIG. 3 is a schematic diagram of the change of an upstream water level of sluice position 1 -sluice 4 simulated by using simulation model in the particular embodiments;

FIG. 4 is a schematic diagram of the change of an upstream water level of sluice position 5 -sluice 8 simulated by using simulation model in the particular embodiments;

FIG. 5 is a schematic diagram of the change of an upstream water level of sluice position 9 -sluice 11 simulated by using simulation model in the particular embodiments;

FIG. 6 is a schematic diagram of the change of a sluice opening degree of sluice position 1 -sluice 4 simulated by using simulation model in the particular embodiments;

FIG. 7 is a schematic diagram of the change of a sluice opening degree of sluice position 5 -sluice 8 simulated by using simulation model in the particular embodiments;

FIG. 8 is a schematic diagram of the change of a sluice opening degree of sluice position 9 -sluice 11 simulated by using simulation model in the particular embodiments;

FIG. 9 is a flow chart of the method for predicting and controlling the water level of a series water conveyance canal on the basis of a fuzzy neural network in the present invention.

›DETAILED DESCRIPTION · 1 of 2

To make the purpose, technical solutions and advantages of the present invention more apparent, the present invention is further illustrated below in conjunction with appended drawing. It is understood that the particular embodiments described herein is only intended to explain the present invention, and is not taken to limit the present invention.

Embodiments

This embodiment provides a method for predicting and controlling a water level of a series water conveyance canal on the basis of a fuzzy neural network, as shown in FIG. 9 , comprising the following steps:

S 1 , establishing a multi-input single-output fuzzy neural network, and training the fuzzy neural network on the basis of operation data of the canal, so as to obtain a fuzzy neural network prediction model that can perform prediction on the water level of a canal pool on the basis of a sluice opening degree value and an initial water level;

S 2 , constructing an upstream water level controller of a coupled predictive control algorithm on the basis of the fuzzy neural network prediction model in step S 1 ;

S 3 , solving an optimal control rate of the upstream water level controller using a gradient optimization algorithm, on the basis of a control target of the upstream water level controller constructed in step S 2 ; and

S 4 , generating a control strategy by collecting actually measured water level change information and multiplying the actually measured water level change information by the optimal control rate on the basis of the optimal control rate solved in step S 3 .

In this embodiment, the multi-input single-output fuzzy neural network established in step S 1 specifically comprises four layers, wherein:

a first layer is an input layer, which is provided with k neurons and represents the number of dimensions of input variables, and the formula of the input layer is as follows

x i =u i   (1)

wherein i=1, 2, . . . , k, ui is the ith input value, and x=[x1, x2, . . . , xk] is an output vector;

a second layer is a radial basis layer, which is provided with p neurons to blur the input and an output of the layer is the product of a membership function, and an output of the neurons is shown in formula (2):

wherein j=1, 2, . . . , p, x=[x1, x2, . . . , xk] is an input of the fuzzy neural network layer; CJ=[C1j, C2j, . . . , CKj], σj=[σ1j, σ2j, . . . , σKj] are a center vector and width vector of the jth neuron respectively, ϕj is an output value of the jth neuron and P is the number of neurons in the layer;

a third layer is a regular layer, which also provides with p neurons, and an output form thereof is shown in formula (3):

wherein l=1, 2, . . . , p, v1 is the first output, and v=[v1, v2, . . . , VP]T is the output vector;

and a fourth layer is the output layer, and a fitting method of the output layer uses a weighting factor method, and the calculation formula is shown in formula (4):

wherein w=[W1, W2, . . . , WP]T is an output weight vector, and v is the output vector of the regular layer.

Preferably, input layer variables of the neural network prediction model constructed in step S 1 are shown in formula (5):

x ( t )=[ y ( t− 1), . . . , y ( t−n y ), u ( t− 1− t d ), . . . , u ( t−n u −t d )] T   (5);

output layer variables are shown in formula (6),

y ( t )=[ y ( t+ 1), y ( t+ 2), . . . , y ( t+H p )] T   (6).

In this embodiment, an objective function of the upstream water level controller constructed in step S 2 is shown in formula (7):

H u is a control duration, which meets H u ≤H p ; an object y(t+i) is a predicted output variable, that is, a predicted upstream water level; ŷ(t) is a target value of the output variable, that is, an upstream target water level; u(t) is a sluice opening degree; Δu(t) is a control variable, which is the increment of u(t), that is, the change of the sluice opening degree; and W i y and W j u are a weighting coefficient of the i-step output variable and the j-step control variable, respectively.

In this embodiment, the process of the gradient optimization in step S 3 comprises the following steps:

S 31 , minimizing the objective function of the upstream water level controller, as shown in Formula 8:

S 32 , according to a gradient algorithm theory, calculating the optimal control rate of the upstream water level controller is calculated using formula (9):

wherein η2 is a learning rate of the control input and calculate a partial derivative of the objective function J(u(t)) with respect to u(t), so as to obtain

wherein ∂ŷ/∂u(t) is a Jacobian matrix, which is calculated by the fuzzy neural network model.

In one embodiment, taking a certain 11-stage series canal pool as an example, the upstream water level of downstream regulating sluices of each canal pool is ensured to be stable by means of controlling the opening degree of the regulating sluice, that is, the control target is the upstream water level of 11 regulating sluices. It is assumed that the upstream water flow changes greatly, and an initial water level is much lower than the target upstream water level. The target upstream water level of 11 regulating sluices are 73.8 m, 72.6 m, 71.8 m, 70.5 m, 69.4 m, 68.3 m, 65.9 m, 65.4 m, 64.4 m, 63.2 m and 62.2 m respectively. The control strategy is selected to control once every 2 hours to ensure that the target water level is within 0.3 m above and below the target water level. Using the method in embodiment 1, the sluice is regulated and controlled to achieve the goal of regulation and control. Because the method is a real-time sluice control algorithm, in this embodiment, a one-dimensional hydrodynamic model is established instead of the actual project for performing algorithm demonstration.

Step 1 : establishing a simulation model of the embodiment; generating different upstream water level change processes by means of changing the sluice opening degree in the simulation model; saving this sluice opening degree and upstream water level data; and establishing a neural network with four layers of a forward topology connection form, and wherein the input layer variables and output layer variables of the neural network respectively are:

›DETAILED DESCRIPTION · 2 of 2

x ( t )=[ y ( t− 1), . . . , y ( t−n y ), u ( t− 1− t d ), . . . , u ( t−n u −t d )] T

y ( t )=[ y ( t+ 1), y ( t+ 2), . . . , y ( t+H p )] T

this neural network is trained with the aforementioned data.

Step 2 : establishing an upstream water level prediction controller on the basis of this neural network, and the objective of the controller is:

the limiting condition is as follows:

Δ u ( t )= u ( t+ 1)− u ( t ),

|Δ u ( t )|≤Δ u max ,

ŷ min ≤ŷ ( t )≤ ŷ max ,

wherein, H u is a control duration, which meets H u ≤H p ; an object y(t+i) is a predicted output variable, that is, a predicted upstream water level; ŷ(t) is a target value of the output variable, that is, an upstream target water level; u(t) is a sluice opening degree; Δu(t) is a control variable, which is the increment of u(t), that is, the change of the sluice opening degree. W i y and W j u are a weighting coefficient of the output variable and the control variable, respectively.

Step 3 : optimizing the control rate of this controller by using a Gradient algorithm, and minimizing the objective function of the upstream water level controller, as shown in Formula 8:

According to a gradient algorithm theory, calculating the optimal control rate of the upstream water level controller is calculated using formula (9):

wherein η2 is a learning rate of the control input and calculate a partial derivative of the objective function J(u(t)) with respect to u(t), so as to obtain

wherein ∂ŷ(t)/∂u(t) is a Jacobian matrix, which is calculated by the fuzzy neural network model.

The obtained optimal control rate is applied to the simulation model canal, and the disturbance that the upstream water flow gradually increases by 20 m3/s is imposed in the simulation model, and this control rate is used for sluice regulation and control. With 2 h as step size, the result of simulating the upstream water level after adopting the simulation model is shown in FIGS. 3 - 5 , and the sluice opening degree is shown in FIGS. 6 - 8 .

By adopting the above-mentioned technical solutions disclosed by the present invention, the following beneficial effects are obtained:

The present invention discloses a method for predicting and controlling a water level of the series water conveyance canal on the basis of a fuzzy neural network, the method, performing the relationship between a sluice opening degree and an open canal control water level by means of a fuzzy neural network, and constructing an upstream water level controller of a coupled predictive control algorithm; solving an optimal control rate of the upstream water level controller using a gradient optimization algorithm on the basis of a control target of the upstream water level controller; and generating a control strategy by collecting actually measured water level change information and multiplying the actually measured water level change information by the optimal control rate on the basis of the solved optimal control rate, thereby fulfilling the object of predicting and controlling the water level.

The above description is only a preferred implementation of the present invention, and it should be noted that persons of ordinary skill in the art may also make several improvements and refinements without departing from the principle of the present invention, and it should not be considered that these improvements and refinements shall fall within the protection scope of the present invention.

Claims

5 · 1 independent · depth 2
12345
5 granted claims

Classifications

3 codes
IPC · International Patent Classification
Section G — Physics
  • G06N3/08
  • G06N3/063
  • G06N3/043

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJan 2021Jul 2021Jan 2022Jul 2022Jan 2023Jul 2023Jan 2024Jul 2024Jan 2025Jul 2025USPTOApplicantNon-final rejectionNotice of allowance
USPTOApplicanthover for detail · click to open
Pendency
4.4 y
1,589 days filing → grant
Office actions
1
non-final + final
Responses
1
no RCE
Examiner
Kamran Afshar
art unit 2125 · TC 2100
Citations: 3 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Chain of title

⤢ drag to zoom20262028203020322034203620382040Owner 1
Titlehover for detail · click to open

See the full assignment history — every owner this patent has passed through, with recordation dates and reel/frame numbers.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

1 priority documents
›Priority documents — 1
TypeDocumentDate
related publicationUS 20230252266 A110 Aug 2023

Worldwide family

10 members · 5 offices
US2JP2CN2WO1GB3
this patentIP5 & PCTother officessolid = grantedhover for detail · click to open
Members
10
DOCDB simple family 71749658
Offices
5
US · JP · CN · WO
Granted
4 of 10
grant date present
Non-English titles
3
shown as filed, never translated
›IP5 & PCT — 7 members
OfficePublicationKindPublishedFiledStatusTitle
USUS-2023252266-A1A110 Aug 20239 Mar 2021publishedMethod for predicting and controlling awater level of a series water conveyance canal on a basis of a fuzzy neural network
USthis patentUS-12361258-B2B215 Jul 20259 Mar 2021grantedMethod for predicting and controlling awater level of a series water conveyance canal on a basis of a fuzzy neural network
JPJP-2022541568-AA26 Sep 20229 Mar 2021publishedファジィニューラルネットワークに基づく直列水路の水位予測及び制御方法ja
JPJP-7346705-B2B219 Sep 20239 Mar 2021grantedファジィニューラルネットワークに基づく直列水路の水位予測及び制御方法ja
CNCN-111474965-AA31 Jul 20202 Apr 2020publishedFuzzy neural network-based method for predicting and controlling water level of series water delivery channel
CNCN-111474965-BB26 Oct 20212 Apr 2020grantedFuzzy neural network-based method for predicting and controlling water level of series water delivery channel
WOWO-2021196997-A1A17 Oct 20219 Mar 2021published基于模糊神经网络的串联输水渠道水位预测与控制方法zh
›Other offices — 3 members
OfficePublicationKindPublishedFiledStatusTitle
GBGB-202119124-D0D016 Feb 20229 Mar 2021publishedMethod for predicting and controlling water level of series of water conveyance canals on basis of fuzzy neural network
GBGB-2599059-AA23 Mar 20229 Mar 2021publishedMethod for predicting and controlling water level of series of water conveyance canals on basis of fuzzy neural network
GBGB-2599059-BB21 Sep 20229 Mar 2021grantedMethod for predicting and controlling a water level of a series water conveyance canal on the basis of a fuzzy neural network

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock