USPatentGranted
B2

System and method of power control for an energy storage charging station

Granted 13 Aug 2019 · 4 office actions

Assignee: General Electric

Law firm: Law firm · Log in to unlock

Attorney: Attorney · Log in to unlock

Inventors: Santosh Sambamoorthy Veda, Matthew Christian Nielsen, Zhi Zhou, Irene Michelle Berry +2 · Examiner: Crystal J Barnes-Bullock · AU 2117 · TC 2100

Life of the patent

12 dated events
⤢ drag to zoom201420162018202020222024202620282030203220342036ProsecutionTerm & fees
ProsecutionTerm & feeshover for detail · click to open

Abstract

A system includes a control unit having a processor and a communication interface. The communication interface is configured to communicate with one or more charging stations that are electrically coupled to receive electrical power from a power distribution grid and that are configured to selectively charge one or more energy storage devices connected to the charging stations. The processor is configured to generate first control signals for communication by the communication interface to the one or more charging stations to control transfer of reactive and/or active power from the charging stations to the power distribution grid. The control signals are generated based at least in part on a load cycle profile of one or more electric machines electrically coupled to the power distribution grid.

Claims

20 · 3 independent · depth 5
1234567891011121314151617181920
20 granted claims

Classifications

11 codes
IPC · International Patent Classification
Section G — Physics
  • G05F1/70
  • G05F1/66
  • G06Q50/06
  • G06F1/26
Section H — Electricity
  • H02J3/16
  • H02J13/00
  • H02J3/00
  • H02J3/38
  • H02J7/00
  • H02J3/14
  • H02J3/32

Claim changes

Soon
Coming soonHow the claims changed between publication and grant

See which claims were amended, added or cancelled during examination, with every added and removed word marked.

AmendedAddedCancelledUnchanged

The published claims of this patent are not paired with the granted ones in what we hold.

File wrapper

⤢ drag to zoomJul 2015Jan 2016Jul 2016Jan 2017Jul 2017Jan 2018Jul 2018Jan 2019Jul 2019USPTOApplicantNon-final rejectionFinal rejectionRequest for continued examination
USPTOApplicanthover for detail · click to open
Pendency
4.1 y
1,513 days filing → grant
Office actions
2
non-final + final
Responses
3
1 RCE
Examiner
Crystal J Barnes-Bullock
art unit 2117 · TC 2100
Citations: 51 back · 0 forward

See the full prosecution history — every USPTO and applicant action on this file, in order.

Log in to unlock

Term & fees

See the term timeline — pendency span, in-force span, the maintenance fees paid and both computed expiry dates.

Log in to unlock

Priority chain

2 priority documents
Priority
20 Jun 2014
earliest claimed
›Priority documents — 2
TypeDocumentDate
provisionalUS 6201480720 Jun 2014
related publicationUS 20170155253 A11 Jun 2017

Validity challenges

See the validity challenges on record — reexaminations, IPRs and PGRs, with their institution decisions and outcomes.

Log in to unlock

Citations

See every patent this one cites and every patent that cites it back — publication, assignee, and how each one was found.

Log in to unlock